#360
by
gordo
on 13 Jun, 2007 23:29
-
gruff68 - 14/6/2007 12:19 AM
JimO - 13/6/2007 6:07 PM
I've been advised to pay attention to A/G discussions about the Russian flight computers. There seems to be something unusual going on regarding them. I've been away the last hour so I haven't been able to monitor. I may go over to the post-MMT presser at 9 CDT. Any other questions need asking, on-line or off-line?
JimO, I was wondering this. If after Atlantis departs, and the Russian flight computers are non-functional/degraded, what happens if the CMG's saturate? Is there a tertiary control system?
The service module takes over attitude control.
-
#361
by
Zachstar
on 13 Jun, 2007 23:30
-
JR and ground talking about the DLA issue.
The gear teeth may not be meshing properly.
Possible the wires may be crossed!
-
#362
by
kneecaps
on 13 Jun, 2007 23:30
-
DaveS - 14/6/2007 12:23 AM
My question would be: How confident are you that that the 2B array will come in nicely without any EV assistance?
It had some assistance already earlier today didn't it? I particualrly liked the 'Hockey Stick'...did they make that on-orbit?
-
#363
by
Zachstar
on 13 Jun, 2007 23:31
-
Launch lock bag. Pat finished 2 of his.
-
#364
by
Zachstar
on 13 Jun, 2007 23:32
-
kneecaps - 13/6/2007 6:30 PM
DaveS - 14/6/2007 12:23 AM
My question would be: How confident are you that that the 2B array will come in nicely without any EV assistance?
It had some assistance already earlier today didn't it? I particualrly liked the 'Hockey Stick'...did they make that on-orbit? 
Suni made it I believe.
Suni is awesome!
-
#365
by
Zachstar
on 13 Jun, 2007 23:36
-
Ground has a plan. Pat may move back to the DLA soon.
Here is another view of the launch lock bag.
------
Time is getting kinda short. When are they going to start removing Launch restraints?
-
#366
by
Zachstar
on 13 Jun, 2007 23:38
-
Both Crew to go to DLA
DLA 1 and 2 possibly Crosswired
Position DLA1 Manually.
While Holding DL2 to Neutral.
--------
Went fast so I only picked up some of it.
-
#367
by
Zachstar
on 13 Jun, 2007 23:38
-
Getting ready to send the commands.
-
#368
by
Zachstar
on 13 Jun, 2007 23:39
-
Another Sunrise on the Quest Airlock!
...... Or not
-
#369
by
Zachstar
on 13 Jun, 2007 23:40
-
Commanding the DLA!
Had an effect.
The wires were crossed!
-
#370
by
DaveS
on 13 Jun, 2007 23:40
-
Zachstar - 14/6/2007 1:39 AM
Another Sunrise on the Quest Airlock!
...... Or not
It's lighting from the cameras.
-
#371
by
Zachstar
on 13 Jun, 2007 23:41
-
DaveS - 13/6/2007 6:40 PM
Zachstar - 14/6/2007 1:39 AM
Another Sunrise on the Quest Airlock!
...... Or not
It's lighting from the cameras.
The track shows sunrise right about now.
Sunrise!
-
#372
by
gordo
on 13 Jun, 2007 23:42
-
Zachstar - 14/6/2007 12:40 AM
Commanding the DLA!
Had an effect.
The wires were crossed!
Doh! S3/S4 Built by Homer Simpson inc....not Boeing
-
#373
by
ZeeNL
on 13 Jun, 2007 23:54
-
A lot of discussions going on in the control rooms.
-
#374
by
gordo
on 13 Jun, 2007 23:56
-
ZeeNL - 14/6/2007 12:54 AM
A lot of discussions going on in the control rooms.
Joe Tanner is in there along with Megan(capcom). Joe did the P3/P4 install EVAs on STS-115
-
#375
by
ApolloLee
on 13 Jun, 2007 23:57
-
gordo - 13/6/2007 4:42 PM
Doh! S3/S4 Built by Homer Simpson inc....not Boeing
Doh indeed...
At least its fixable... Not like they made the wires three feet when they should have been three meters. (Sorry, Lockheed)
-
#376
by
ZeeNL
on 13 Jun, 2007 23:58
-
There was also a discussion going on in the ISS control room, I think? I saw a guy crossing his arms, like he was talking about the crossed wires.
-
#377
by
Zachstar
on 14 Jun, 2007 00:00
-
Pat reports more progress with the DLP.
2 more of these to go!
Meanwhile Steve removes more Launch locks.
-
#378
by
Zachstar
on 14 Jun, 2007 00:01
-
I've not seen any launch restraints removed yet
--------------
CWC #3 Started at 00:14 and delivered.
IMU Align is not needed.
-
#379
by
Zachstar
on 14 Jun, 2007 00:02
-
DLA 1 deploy complete!!
Ready to engage!