#200
by
Ford Mustang
on 11 Jun, 2007 22:05
-
-
#201
by
Avron
on 11 Jun, 2007 22:06
-
Moving on to release of beta-gimble constraints.
"just hanging out"..
-
#202
by
sts1canada
on 11 Jun, 2007 22:06
-
KU TV is now through TDRS West, should have TV coverage for about ten more minutes on this pass until a handover to TDRS East occurs, sunset occurs in 15 minutes on this pass.
Richard
-
#203
by
Ford Mustang
on 11 Jun, 2007 22:07
-
Danny and JR at the toolbox.
"What's up?"
"Not much, just hanging around!"
-
#204
by
Lee Jay
on 11 Jun, 2007 22:07
-
Chris Bergin - 11/6/2007 3:56 PM
STS-117 has been extended two days by the MMT. Crew will be informed at the end of today.
Apologies for getting a little lost in all the recent changes, but please refresh me on station power transfer and cryogenics capabilities/duration on this flight.
Chris, thanks for letting us know even before the crew does!
-
#205
by
DaveS
on 11 Jun, 2007 22:08
-
Lee Jay - 11/6/2007 12:07 AM
Chris Bergin - 11/6/2007 3:56 PM
STS-117 has been extended two days by the MMT. Crew will be informed at the end of today.
Apologies for getting a little lost in all the recent changes, but please refresh me on station power transfer and cryogenics capabilities/duration on this flight.
Chris, thanks for letting us know even before the crew does!
No SSPTS on OV-104, only available on OV-103 and OV-105. So they probably have done a good job managing PRSD cryos.
-
#206
by
Ford Mustang
on 11 Jun, 2007 22:09
-
This shows the curve of the Earth we're sitting on, and if I heard correct, they are about to release the radiator!
-
#207
by
kimmern123
on 11 Jun, 2007 22:10
-
If there's a fourth EVA, who will be conducting it. Do you think it would be Pat and Swanny, given they only have EVA 2 while JR and Danny have both EVA 1 and 3?
-
#208
by
Zachstar
on 11 Jun, 2007 22:11
-
Danny is releasing a bolt.
Wrapping up on restraints and getting ready to work on the Radiator.
Jeff is about to work with the aft Gimbal Restraints.
-
#209
by
Zachstar
on 11 Jun, 2007 22:12
-
EVA going good.
They are "Head over Heels"
Image 2: Closeup
-
#210
by
Lee Jay
on 11 Jun, 2007 22:13
-
DaveS - 11/6/2007 4:08 PM
Lee Jay - 11/6/2007 12:07 AM
Chris Bergin - 11/6/2007 3:56 PM
STS-117 has been extended two days by the MMT. Crew will be informed at the end of today.
Apologies for getting a little lost in all the recent changes, but please refresh me on station power transfer and cryogenics capabilities/duration on this flight.
Chris, thanks for letting us know even before the crew does!
No SSPTS on OV-104, only available on OV-103 and OV-105. So they probably have done a good job managing PRSD cryos.
Thank you Dave.
-
#211
by
sts1canada
on 11 Jun, 2007 22:14
-
This mission STS-117 is set for a 11+2+2 duration which means that the primary mission is scheduled for 11 days, there are 2 extension days available and 2 weather wave off days available. Atlantis has enough consumables (oxygen, hydrogen for the fuel cells) on board to support this. Now the mission is extended to 13 days with two weather wave off days, but they will probably land on the first day opportunity if the weather is good somewhere else than KSC. The station/shuttle power transfer system is not installed on Atlantis and it is not available as an option on this flight, the first flight of this system will be on STS-118.
Richard
-
#212
by
Zachstar
on 11 Jun, 2007 22:15
-
Danny is working with the radiator.
Image 3 is his helmet cam with him working with the Pistol Grip Tool.
-
#213
by
Lee Jay
on 11 Jun, 2007 22:16
-
So, does this mean a likely re-activation of White Sands?
-
#214
by
DaveS
on 11 Jun, 2007 22:17
-
Lee Jay - 11/6/2007 12:16 AM
So, does this mean a likely re-activation of White Sands?
White Sands is always called up along with Edwards as it is alternate EOM landing site.
-
#215
by
Zachstar
on 11 Jun, 2007 22:18
-
Nice shot of the folded radiator as Danny moves on.
-
#216
by
Zachstar
on 11 Jun, 2007 22:19
-
Danny helps move the line as JR moves on.
-
#217
by
Avron
on 11 Jun, 2007 22:20
-
Out goes the Beta-gimble box..
-
#218
by
eeergo
on 11 Jun, 2007 22:20
-
One beta gimbal assembly out.
-
#219
by
Zachstar
on 11 Jun, 2007 22:21
-
One of the canisters has been moved into position.
JR seems to be working on the other.