-
#200
by
Chandonn
on 10 Jun, 2007 19:40
-
ShuttleDiscovery - 10/6/2007 3:39 PM
How long until hard dock?
Depends... They'll be in free drift until all motion between the two vehicles dampens out.
-
#201
by
ShuttleDiscovery
on 10 Jun, 2007 19:41
-
Chandonn - 10/6/2007 8:40 PM
ShuttleDiscovery - 10/6/2007 3:39 PM
How long until hard dock?
Depends... They'll be in free drift until all motion between the two vehicles dampens out.
Thanks.
-
#202
by
Zachstar
on 10 Jun, 2007 19:43
-
Retract Started
Retract DONE
-
#203
by
Ford Mustang
on 10 Jun, 2007 19:44
-
Hatch retraction, start to end.
-
#204
by
Zachstar
on 10 Jun, 2007 19:46
-
Camera Shaking a bit as the hard dock gets done.
-
#205
by
kneecaps
on 10 Jun, 2007 19:50
-
Load on the capture latches will now be relieved by extending the ring.
-
#206
by
Ford Mustang
on 10 Jun, 2007 19:56
-
-
#207
by
Zachstar
on 10 Jun, 2007 19:59
-
-
#208
by
kneecaps
on 10 Jun, 2007 19:59
-
The CDR and PLT now 'Terminating Rendezvous Ops', this mainly involves deselecting a number of forward RCS jets, loading new rates into the Digital Auto Pilot (DAP), powering down the docking systen and stowing the hand hand laser.
-
#209
by
jabe
on 10 Jun, 2007 19:59
-
any chance of getting a video of the "flipping" of the orbietr? I missed it live
-
#210
by
Zachstar
on 10 Jun, 2007 20:00
-
-
#211
by
Andrewwski
on 10 Jun, 2007 20:00
-
-
#212
by
Jim
on 10 Jun, 2007 20:01
-
powering down the docking systen and stowing the hand hand laser are performed by MS's
-
#213
by
jabe
on 10 Jun, 2007 20:01
-
Zachstar - 10/6/2007 3:00 PM
jabe - 10/6/2007 2:59 PM
any chance of getting a video of the "flipping" of the orbietr? I missed it live 
It will be on SpaceMultiMedia soon enough.
http://www.space-multimedia.nl.eu.org/
fabulous..thanks for the link!!
-
#214
by
Zachstar
on 10 Jun, 2007 20:03
-
-
#215
by
ace007
on 10 Jun, 2007 20:03
-
Andrewwski - 10/6/2007 2:00 PM
For those who are wondering, here's the link to 1200 kbps.
http://playlist.yahoo.com/makeplaylist.dll?id=1368163
Sweet - Thanks...
I don't think I'm going to get much work done Mon, Wed, and Friday afternoons while they are doing their spacewalks...
-
#216
by
kneecaps
on 10 Jun, 2007 20:05
-
Anybody know what gets powered off in the 'Group B' Powerdown? Its done quite often, but its contained in the Pocket Check Lists (PCL) which we don't have!
-
#217
by
Ford Mustang
on 10 Jun, 2007 20:12
-
-
#218
by
Zachstar
on 10 Jun, 2007 20:12
-
View of the payload bay.
Sounds like its gonna be a long playback for todays Crew Flight Day Highlights.
Edit2: View of the Hatch
-
#219
by
Ford Mustang
on 10 Jun, 2007 20:17
-
GO for Step 5 (ISS Hatch Opening)