#40
by
DaveS
on 08 Jun, 2007 16:42
-
T-3 hours and holding for 3 hours.
-
#41
by
Felix
on 08 Jun, 2007 16:42
-
T-3hours and holding for 3 hours
LOX/LH2 should be in stable replenish by now
Upcoming:
Pad inspection by Ice Team
Closeout Crew will prepare crew module for crew ingress
Flight crew weather briefing and suit up
-
#42
by
Felix
on 08 Jun, 2007 16:46
-
-
#43
by
Johnny Rönnberg
on 08 Jun, 2007 16:49
-
The weather is as expected, the winds will doe there jobs.
-
#44
by
shuttlefan
on 08 Jun, 2007 16:59
-
Is it just me, or is this MSBLS box problem starting to sound more and more like it's going to cause a scrub for today?
-
#45
by
Chris Bergin
on 08 Jun, 2007 17:02
-
ET 100 percent and now in stable replenish.
-
#46
by
DaveS
on 08 Jun, 2007 17:02
-
shuttlefan - 8/6/2007 6:59 PM
Is it just me, or is this MSBLS box problem starting to sound more and more like it's going to cause a scrub for today?
I don't think it's going to cause a scrub. They have a pretty good Flight Rationale to "fly-as-is" with MSBLS#3 classed as "suspect".
-
#47
by
Chris Bergin
on 08 Jun, 2007 17:05
-
OPO meeting on MLS has begun.
-
#48
by
Chris Bergin
on 08 Jun, 2007 17:07
-
No problems reported with the ECOs during SIM checks.
-
#49
by
eeergo
on 08 Jun, 2007 17:07
-
Also, in a previous article by Chris, it was noted that even a "failed"-classified MLS wouldn't delay the launch.
"Manager Leroy Cain - at the MMT - noted the two string ability even with one failure (number 3), which keeps the MLS within the LCC requirements for launch, as there is redundancy even if MLS 1 or MLS 2 fails during the mission."
-
#50
by
bsegal
on 08 Jun, 2007 17:10
-
eeergo - 8/6/2007 1:07 PM
Also, in a previous article by Chris, it was noted that even a "failed"-classified MLS wouldn't delay the launch.
"Manager Leroy Cain - at the MMT - noted the two string ability even with one failure (number 3), which keeps the MLS within the LCC requirements for launch, as there is redundancy even if MLS 1 or MLS 2 fails during the mission."
Amen. Even with a "failed" MLS, flight rules provide for launch with two good. If some in the flight office don't want to launch today b/c of concern with the one MLS, I'm sure the discussion will be centered around why you have flight rules at all if you're not going to stick with them.
-
#51
by
Chris Bergin
on 08 Jun, 2007 17:15
-
Chris Bergin - 8/6/2007 6:07 PM
No problems reported with the ECOs during SIM checks. 
SIM test confirmed as successful on all counts. Absolutely no issue being worked with the tank.
-
#52
by
ShuttleDiscovery
on 08 Jun, 2007 17:16
-
Chris Bergin - 8/6/2007 6:15 PM
Chris Bergin - 8/6/2007 6:07 PM
No problems reported with the ECOs during SIM checks. 
SIM test confirmed as successful on all counts. Absolutely no issue being worked with the tank.
So everything looking good so far! Just another 6 hours of waiting!
-
#53
by
shuttlepilot
on 08 Jun, 2007 17:21
-
NASA TV coverage will begin in 10 minutes.
-
#54
by
eeergo
on 08 Jun, 2007 17:23
-
-
#55
by
eeergo
on 08 Jun, 2007 17:26
-
Three weather items (cumulus, anvils and thick clouds) are currently red... but they'll probably be green by launch time:
-
#56
by
Ford Mustang
on 08 Jun, 2007 17:29
-
Live NASA TV Coverage to start any minute.
EDIT: Felix and I posted at the same time.
-
#57
by
EirikV
on 08 Jun, 2007 17:31
-
And we have coverage. George Diller serving as PAO?
-
#58
by
eeergo
on 08 Jun, 2007 17:34
-
Nice view of the intertank's mast:
-
#59
by
Austin
on 08 Jun, 2007 17:36
-
EirikV - 8/6/2007 10:31 AM
George Diller serving as PAO?
Affirmative.