shuttlefan - 16/2/2007 9:52 PM
Was the APU Hotfire Test conducted yesterday before the RSS was moved into position, or is that still scheduled for later?
An APU Hot Fire/Confidence Run is only required if one or more APUs were swapped out or significant APU/Hydraulic maintenance was performed during the processing flow.
I don’t believe that occurred during this flow so a Hot Fire is not required – I will double check the schedule however.
Mark Kirkman
-
#262
by
mkirk
on 17 Feb, 2007 15:51
-
TJL - 17/2/2007 9:33 AM
Was wondering what the light area is, seen on the bottom section of the ET?
Photo courtesy of Ben...Thank you.
http://www.launchphotography.com/STS-117_rollout_4.JPG
It is a processing/maintenance closeout area. In other words newer foam was applied in that location.
Mark Kirkman
-
#263
by
mkirk
on 17 Feb, 2007 15:57
-
shuttlefan - 17/2/2007 9:25 AM
Is there a snippet from L2 that Chris could provide, about events at the pad which have been completed and also to come? It would be so appreciated.
Launch Pad Validation Testing began as soon as the vehicle was "hard down" at the Pad. The next major activities include the Engine Flight Readiness Test and Preperations for Hypergolic loading of the OMS, RCS, APU, and SRB HPU propellant tanks.
TCDT countdown will start next Thursday morning and end with a simulated cutoff and crew egress around 11:00 am on Friday.
Mark Kirkman
-
#264
by
Michael22090
on 17 Feb, 2007 23:43
-
When will the RSS be rolled back from the Orbiter? Will it be soon after the payload is transferred, or will it stay that way for a while after?
-
#265
by
DaveS
on 17 Feb, 2007 23:45
-
Michael22090 - 18/2/2007 1:43 AM
When will the RSS be rolled back from the Orbiter?
Not until about 20 or so hours before launch. The RSS provides weather protection for the orbiter during it's stay on the pad.
-
#266
by
nitin52
on 18 Feb, 2007 12:58
-
Why one of the SRB has a black band on top, near the cone and the other SRB do not have? Are both SRBs not similar?
-
#267
by
Jim
on 18 Feb, 2007 13:17
-
nitin52 - 18/2/2007 8:58 AM
Why one of the SRB has a black band on top, near the cone and the other SRB do not have? Are both SRBs not similar?
So they can be identified in pictures
-
#268
by
shuttlefan
on 18 Feb, 2007 14:00
-
Jim - 18/2/2007 8:17 AM
nitin52 - 18/2/2007 8:58 AM
Why one of the SRB has a black band on top, near the cone and the other SRB do not have? Are both SRBs not similar?
So they can be identified in pictures
Between 1984 and 1994, the SRBs had more black markings on them, near the nosecones. Why aren't those there anymore?
-
#269
by
TJL
on 18 Feb, 2007 14:36
-
Don't know why they changed the markings, but the first flight to have them was STS-41D in 1984...and the first to have the current design was STS-61 in 1993.
Prior to '84 I believe there were small markings along the side of the casings.
-
#270
by
stefan1138
on 18 Feb, 2007 15:03
-
-
#271
by
TJL
on 18 Feb, 2007 16:01
-
Stefan..thanks for the very thorough link.
Never realized there were that many changes.
Will the flight scheduled before STS-125 (HST) be the first "stack 6" (or "stack 5a")configuration?...thank you.
-
#272
by
stefan1138
on 18 Feb, 2007 16:16
-
I also find the reference for each orbiter very good. Did also not realize that there were so many (subtle) changes in the appearance of each orbiter. Those guys at AXM do a great job - the seem to notice EVERY little detail.
Don´t know about "Stack 6" but at the time of STS 125 there will probably be enough changes for them to create a new reference page.
Stefan
-
#273
by
Michael22090
on 18 Feb, 2007 17:28
-
Is payload transfer to Atlantis still set for tomorrow?
-
#274
by
psloss
on 19 Feb, 2007 00:05
-
stefan1138 - 18/2/2007 12:16 PM
I also find the reference for each orbiter very good. Did also not realize that there were so many (subtle) changes in the appearance of each orbiter. Those guys at AXM do a great job - the seem to notice EVERY little detail.
It is a very nice reference, especially for building models; outside that perspective, perhaps they can add some details to some of TPS changes. For example, during the downtime after the 51-L disaster, Columbia had most of the tiles on its mid-fuselage sidewalls replaced with blankets. I didn't see any reference to that, but maybe I missed it.
-
#275
by
ShuttleDiscovery
on 19 Feb, 2007 18:05
-
psloss - 19/2/2007 1:05 AM
stefan1138 - 18/2/2007 12:16 PM
I also find the reference for each orbiter very good. Did also not realize that there were so many (subtle) changes in the appearance of each orbiter. Those guys at AXM do a great job - the seem to notice EVERY little detail.
It is a very nice reference, especially for building models; outside that perspective, perhaps they can add some details to some of TPS changes. For example, during the downtime after the 51-L disaster, Columbia had most of the tiles on its mid-fuselage sidewalls replaced with blankets. I didn't see any reference to that, but maybe I missed it.
I too find the detail on those refrences very precise. Most of these tiny changes, we don't even realise until we look up close!
-
#276
by
Gerald Andrew Richli
on 19 Feb, 2007 20:47
-
Has the S3/S4 payload been installed into the Atlantis payload bay?
-
#277
by
mkirk
on 19 Feb, 2007 23:46
-
Gerald Andrew Richli - 19/2/2007 3:47 PM
Has the S3/S4 payload been installed into the Atlantis payload bay?
Yes it was installed today.
Mark Kirkman
-
#278
by
DaveS
on 20 Feb, 2007 00:11
-
Can someone remind me when the FRR is again? Is it the 27-28 this month?
-
#279
by
Gerald Andrew Richli
on 20 Feb, 2007 00:44
-
Thanks Mark