Discussion thread for SpaceX's Bandwagon 3 dedicated rideshare flight.
Discussion thread for
SpaceX Rideshare ProgramDiscussion thread for
Bandwagon 3, Bandwagon 2, Bandwagon 1Launch targeting NET January 2025 from Florida, on Falcon 9 (booster 10xx.x) to 45.4 deg, with deployment orbits around 510km and 590km?. Booster will land at LZ-1.
Payloads:
425 Project SAR sat (?kg, South Korea)
Haven-Demo (515kg, Vast)
Possible Payloads:
Removed Payloads:
0634-EX-ST-2024 Haven-Demo (Vast)
515kg, they plan to lower the spacecraft to the 415km operational orbit and then perform targeted deorbit burn at end of mission.
And now Vast has done a filing for a license for Haven-demo, but they still have the permit filing active. ¯\_(ツ)_/¯
SAT-LOA-20240702-00148