Bob + JRTI + B1083 returned to PC on Apr 13 @ 7:04am ET
Bob + JRTI departed PC on Apr 6 @ 6:53pm ET
Bob + JRTI + B1083 returned to PC on Apr 13 @ 7:04am ET
JRTI departure to arrival circa 6.5 days.
The barge and crew may unload and return to sea today.
Some reusability stats for this launch (Starlink Group 6-48):
Booster B1083.2 turnaround time:
37 days 1 hour 47 minutes(its previous mission was Crew-8 on Mar 4, 2024 UTC).
FYI: median turnaround time for Falcon 9 / Heavy boosters is currently 46.97 days *
* – based on the last 30 launches, excluding new first stages.
Launchpad SLC-40 turnaround time:
4 days 20 hours 28 minutes(the previous launch from this pad was Starlink Group 6-47 on Apr 5, 2024 UTC).
FYI: median turnaround time for SLC-40 is currently 5.08 days *
* – based on the last 30 launches.
The same type of stats for previous SpaceX launches may be found on
this spreadsheet online.
NSF Launch Roundup: SpaceX to reach its 40th Falcon 9 flight of 2024, April 15, by Martin Smith
SLC-40 was the pad from which the Group 6-49 and Group 6-48 missions launched during the previous week, the latter of which was unusually delayed twice into its launch window for undeclared reasons that did not appear to be weather-related.