And launch of the Starlink Group 7-15!
F9/Starlink 7-15: 1st stage engine shutdown, stage separation and 2nd stage engine ignition confirmed; 1st stage heading toward a droneship landing8:15 PM · Feb 22, 2024
Main engine cutoff and stage separation. One of the nine Merlin engines powering tonight's first stage is our flight leader, powering its 22nd mission to Earth orbit
Another Starlink off to the Cosmos 🌌
And that's 19 missions in the bag for Falcon 9 B1061!