#20
by
centaurinasa
on 01 Feb, 2024 09:15
-
-
#21
by
centaurinasa
on 01 Feb, 2024 09:17
-
-
#22
by
catdlr
on 01 Feb, 2024 09:31
-
CAPTURE !
Welcome abooard S.S. Patricia “Patty” Hilliard Robertson !
Thank you, Centaurinasa. I don't usually watch the docking of non-human cargo flights. This one was great for viewing the scenery below while loitering. You do a great job of covering the events and posting when needed. It's great to have members like you who volunteer to document this.
Best
Tony
I also need to thank Targeteer and sdsds for there coverage during the initial stages. I bet you like working together.
Tony
-
#23
by
centaurinasa
on 01 Feb, 2024 09:37
-
Berthing process:
- SSRMS in move to align Cygnus tu Nadir Node-1 CBM
- Cygnus CBM visual inspection (ISS cam)
- No exercice constraint
- Final alignment
- Ready To Latch position
- 1st stage capture: 4 latches closed "soft capture"
- SSRMS in "limp mode" (no constraint on Cygnus by SSRMS)
- 2nd stage capture: 16 bolds drived
- Installation complete
- Vestibule leak check
-
#24
by
catdlr
on 01 Feb, 2024 09:39
-
Berthing process:
- SSRMS in move to align Cygnus tu Nadir Node-1 CBM
- Cygnus CBM visual inspection (ISS cam)
- No exercice constraint
- Final alignment
- Ready To Latch position
- 1st stage capture: 4 latches closed "soft capture"
- SSRMS in "limp mode" (no constraint on Cygnus by SSRMS)
- 2nd stage capture: 16 bolds drived
- Installation complete
- Vestibule leak check
Oh, I forgot berthing is next. Lot's more to come.
-
#25
by
centaurinasa
on 01 Feb, 2024 09:57
-
ROBO at MCC-H has started the berthing.
-
#26
by
FutureSpaceTourist
on 01 Feb, 2024 10:05
-
-
#27
by
centaurinasa
on 01 Feb, 2024 10:29
-
-
#28
by
centaurinasa
on 01 Feb, 2024 10:32
-
-
#29
by
centaurinasa
on 01 Feb, 2024 10:35
-
-
#30
by
centaurinasa
on 01 Feb, 2024 10:43
-
Cygnus approach from ISS porthole (centerline camera)
ROBO procced to precise aligment.. (distance.:2 meters)
-
#31
by
centaurinasa
on 01 Feb, 2024 11:03
-
Good Ready To Latch (4 Capture Latches: two on Cygnus and two on ISS) position
-
#32
by
centaurinasa
on 01 Feb, 2024 11:05
-
1st stage capture complete.
-
#33
by
centaurinasa
on 01 Feb, 2024 11:06
-
SSRMS in "limp mode" (no constraint on Cygnus by SSRMS).
-
#34
by
centaurinasa
on 01 Feb, 2024 11:07
-
ready to 2nd stage capture.
-
#35
by
centaurinasa
on 01 Feb, 2024 11:11
-
2nd stage capture: 16 powered bolts are commanded to complete the rigidization of the structural joint to seal the vestibule between the passive and active elements.
-
#36
by
centaurinasa
on 01 Feb, 2024 11:15
-
Installation complete at 12.14 UTC above New Zealand !!
-
#37
by
centaurinasa
on 01 Feb, 2024 11:22
-
End of NASA TV coverage.
Thanks to our NASA's PAO Chelsey Ballarte (and thanks to catdlr for his words

)
-
#38
by
centaurinasa
on 01 Feb, 2024 11:23
-
-
#39
by
centaurinasa
on 01 Feb, 2024 11:25
-