Author Topic: STS-120 Processing Latest  (Read 153094 times)

Offline psloss

  • Veteran armchair spectator
  • Senior Member
  • *****
  • Posts: 17992
  • Liked: 4065
  • Likes Given: 2111
RE: STS-120 (LON-320) Processing Latest
« Reply #480 on: 09/12/2007 10:43 am »
Some shots of the TSA unit being installed in Discovery on Monday are now up on the KSC Media Gallery:
http://mediaarchive.ksc.nasa.gov/search.cfm?cat=4

Online DaveS

  • Shuttle program observer
  • Senior Member
  • *****
  • Posts: 8548
  • Sweden
  • Liked: 1240
  • Likes Given: 65
Re: STS-120 (LON-320) Processing Latest
« Reply #481 on: 09/12/2007 03:40 pm »
Where's Node 2?!
"For Sardines, space is no problem!"
-1996 Astronaut class slogan

"We're rolling in the wrong direction but for the right reasons"
-USA engineer about the rollback of Discovery prior to the STS-114 Return To Flight mission

Offline C5C6

  • Regular
  • Full Member
  • **
  • Posts: 267
  • Córdoba - Argentina
    • programaespacial.com
  • Liked: 4
  • Likes Given: 0
Re: STS-120 (LON-320) Processing Latest
« Reply #482 on: 09/12/2007 04:12 pm »
who stold node 2??? everybody empty your pockets please....   (lol)

just noticed the same, no webcam coverage!!! no pictures!!! is it already in the canister???


Offline MKremer

  • Elite Veteran
  • Senior Member
  • *****
  • Posts: 4034
  • Liked: 69
  • Likes Given: 1275
Re: STS-120 (LON-320) Processing Latest
« Reply #483 on: 09/12/2007 04:13 pm »
Being weighed, I think. For some strange reason the camera page isn't showing the move, but I think I see a glimpse of the crane cables back in the corner behind Kibo.

Offline Ford Mustang

  • Live Coverage Editor
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 12473
  • Virginia
    • Astro95Media
  • Liked: 375
  • Likes Given: 36
RE: STS-120 (LON-320) Processing Latest
« Reply #484 on: 09/12/2007 05:53 pm »

Offline psloss

  • Veteran armchair spectator
  • Senior Member
  • *****
  • Posts: 17992
  • Liked: 4065
  • Likes Given: 2111
Re: STS-120 (LON-320) Processing Latest
« Reply #485 on: 09/12/2007 06:39 pm »
Quote
MKremer - 12/9/2007  12:13 PM

Being weighed, I think. For some strange reason the camera page isn't showing the move, but I think I see a glimpse of the crane cables back in the corner behind Kibo.
Yup...
http://mediaarchive.ksc.nasa.gov/detail.cfm?mediaid=33462


Offline nathan.moeller

  • Astro95 Media
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 3994
  • Houston, TX
    • Astro95 Media
  • Liked: 16
  • Likes Given: 0
Re: STS-120 (LON-320) Processing Latest
« Reply #486 on: 09/12/2007 07:20 pm »
Great to see it finally being transferred.  Do we have a date for payload-to-pad?
www.astro95media.com - Lead Video & Graphics

Offline ShuttleDiscovery

  • NASA's first teenage astronaut
  • Senior Member
  • *****
  • Posts: 2125
  • UK
    • Shuttle Discovery's Space Page
  • Liked: 0
  • Likes Given: 0
Re: STS-120 (LON-320) Processing Latest
« Reply #487 on: 09/12/2007 07:20 pm »
Quote
psloss - 12/9/2007  7:39 PM

Quote
MKremer - 12/9/2007  12:13 PM

Being weighed, I think. For some strange reason the camera page isn't showing the move, but I think I see a glimpse of the crane cables back in the corner behind Kibo.
Yup...
http://mediaarchive.ksc.nasa.gov/detail.cfm?mediaid=33462


Great to see it out of it's stand! :)

Online DaveS

  • Shuttle program observer
  • Senior Member
  • *****
  • Posts: 8548
  • Sweden
  • Liked: 1240
  • Likes Given: 65
Re: STS-120 (LON-320) Processing Latest
« Reply #488 on: 09/12/2007 07:22 pm »
Quote
nathan.moeller - 12/9/2007  9:20 PM

Great to see it finally being transferred.  Do we have a date for payload-to-pad?
Sept. 29.
"For Sardines, space is no problem!"
-1996 Astronaut class slogan

"We're rolling in the wrong direction but for the right reasons"
-USA engineer about the rollback of Discovery prior to the STS-114 Return To Flight mission

Offline Martin FL

  • Elite Veteran
  • Senior Member
  • *****
  • Posts: 2475
  • Liked: 139
  • Likes Given: 282
Re: STS-120 (LON-320) Processing Latest
« Reply #489 on: 09/12/2007 11:56 pm »
Large module, but looking at the last FAWG, the JEM looks twice as big! Any images of that in the facility?

Offline Ankle-bone12

  • Full Member
  • **
  • Posts: 207
  • Liked: 0
  • Likes Given: 0
Re: STS-120 (LON-320) Processing Latest
« Reply #490 on: 09/13/2007 03:09 am »
Quote
Martin FL - 12/9/2007  6:56 PM

Large module, but looking at the last FAWG, the JEM looks twice as big! Any images of that in the facility?

probably shouldnt do this as it dosnt relate to 120

this of course is not a recent image.

Alex B.

Offline nathan.moeller

  • Astro95 Media
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 3994
  • Houston, TX
    • Astro95 Media
  • Liked: 16
  • Likes Given: 0
Re: STS-120 (LON-320) Processing Latest
« Reply #491 on: 09/13/2007 01:35 pm »
Quote
DaveS - 12/9/2007  2:22 PM

Quote
nathan.moeller - 12/9/2007  9:20 PM

Great to see it finally being transferred.  Do we have a date for payload-to-pad?
Sept. 29.

Wow two days after SSV rollout.  That's a bit unusual.
www.astro95media.com - Lead Video & Graphics

Offline ace007

  • Member
  • Posts: 35
  • Liked: 0
  • Likes Given: 0
RE: STS-120 (LON-320) Processing Latest
« Reply #492 on: 09/14/2007 01:39 am »
My family and I did the KSC tour last Sunday Sep 9th which included the viewing gallery for the Station Compoent prep room.  You canot see everything from the window but I got a nice shot of Node 2 all buttoned up and ready to go.  I also got pics of Columbus all covered in plastic and of the little top piece of Kibo.  Pretty cool seeing the nodes in person knowing they will be up in space really soon.

Edit:  Other pics from the tour are here  http://www.flickr.com/gp/9703598@N05/Ue275q

Online DaveS

  • Shuttle program observer
  • Senior Member
  • *****
  • Posts: 8548
  • Sweden
  • Liked: 1240
  • Likes Given: 65
Re: STS-120 (LON-320) Processing Latest
« Reply #493 on: 09/14/2007 12:12 pm »
NASA TV is currently running b-rolls of animations of mission activities that will be done during this mission.
"For Sardines, space is no problem!"
-1996 Astronaut class slogan

"We're rolling in the wrong direction but for the right reasons"
-USA engineer about the rollback of Discovery prior to the STS-114 Return To Flight mission

Offline rdale

  • Assistant to the Chief Meteorologist
  • Senior Member
  • *****
  • Posts: 10402
  • Lansing MI
  • Liked: 1458
  • Likes Given: 175
Re: STS-120 (LON-320) Processing Latest
« Reply #494 on: 09/14/2007 12:58 pm »
Yep, today's the big press conference day on the mission.

Offline psloss

  • Veteran armchair spectator
  • Senior Member
  • *****
  • Posts: 17992
  • Liked: 4065
  • Likes Given: 2111
Re: STS-120 (LON-320) Processing Latest
« Reply #495 on: 09/14/2007 01:06 pm »
Wayne Hale in the program overview talking about some of the shuttle manifest options (albeit in a very high level way) that have been reported here in the past few weeks.

Offline Chris Bergin

RE: STS-120 (LON-320) Processing Latest
« Reply #496 on: 09/14/2007 01:09 pm »
The 5 EVA deal for STS-120 is now baselined into the new flight plan (still being finished, but it's in).
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline psloss

  • Veteran armchair spectator
  • Senior Member
  • *****
  • Posts: 17992
  • Liked: 4065
  • Likes Given: 2111
Re: STS-120 (LON-320) Processing Latest
« Reply #497 on: 09/14/2007 01:11 pm »
Hale also noting the change in the flight readiness review (FRR) process before this flight...I believe this has also been noted here, too.

Offline psloss

  • Veteran armchair spectator
  • Senior Member
  • *****
  • Posts: 17992
  • Liked: 4065
  • Likes Given: 2111
RE: STS-120 (LON-320) Processing Latest
« Reply #498 on: 09/14/2007 01:12 pm »
Quote
Chris Bergin - 14/9/2007  9:09 AM

The 5 EVA deal for STS-120 is now baselined into the new flight plan (still being finished, but it's in).
Yeah, Hale also said the flight would be extended by a day...not sure what that works out to for the baseline.

Offline Chris Bergin

RE: STS-120 (LON-320) Processing Latest
« Reply #499 on: 09/14/2007 01:13 pm »
Quote
psloss - 14/9/2007  2:12 PM

Quote
Chris Bergin - 14/9/2007  9:09 AM

The 5 EVA deal for STS-120 is now baselined into the new flight plan (still being finished, but it's in).
Yeah, Hale also said the flight would be extended by a day...not sure what that works out to for the baseline.

Large presentation on L2 in the next few hours ;)
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0