The MuSats are planned to be launched as secondary payloads on SpaceX Falcon9 Transporter ride-share missions. MuSat-2 is planned to be launched in October of 2023 on Transporter 9 and MuSat-3 is planned for mid-2024 on Transporter 11....The MuSat satellites are demonstration spacecraft with two primary goals. The first goal is to demonstrate and validate the on-orbit performance of Muon Space’s in-house avionics suite. The second goal is to provide validation and early commercial data from GNSS occultation and reflectometry payloads as well additional payloads that will be hosted on the spacecraft....LTDN 10:30 (T9) 13:00-15:00 (T11)...The MuSat satellites have external dimensions of 0.752m x 1.206m x 0.864m, both stowed anddeployed, as the system contains no deployables. The spacecraft mass at launch is estimatedto be 67.4kg, and as there are no consumables or separable hardware, this will effectivelyremain constant over the lifetime of the mission.
FOSSA chose Momentus for two contracts. The first contract is for the delivery of their next generation of satellites, planned for launch on the SpaceX Transporter-8 mission targeted for June of 2023. Not only will this showcase the new design features of FOSSA satellites, it will also serve as a demonstration for a second batch of satellites Momentus expects to launch for FOSSA onboard a follow-on SpaceX Transporter mission in June of 2024. Combined, these two missions will kick off the deployment of a new constellation of FOSSA satellites and marked progress as Momentus works towards our first stage constellation deployment.
https://seekingalpha.com/article/4603463-momentus-inc-mnts-q1-2023-earnings-call-transcriptQuoteFOSSA chose Momentus for two contracts. The first contract is for the delivery of their next generation of satellites, planned for launch on the SpaceX Transporter-8 mission targeted for June of 2023. Not only will this showcase the new design features of FOSSA satellites, it will also serve as a demonstration for a second batch of satellites Momentus expects to launch for FOSSA onboard a follow-on SpaceX Transporter mission in June of 2024. Combined, these two missions will kick off the deployment of a new constellation of FOSSA satellites and marked progress as Momentus works towards our first stage constellation deployment.Looks the second batch of fossa satellites goes on this flight.
Weird, Momentus is expected to launch on Transporter-9 next, not Transporter-8.
Alba Orbital to launch a pocketqube cluster on this mission: http://www.albaorbital.com/launch.
http://www.albaorbital.com/launch
Loft Orbital Solutions Inc. (“Loft Orbital”) requests authority to launch and operate a constellation of 10 satellites (“YAC-1”). YAC-1 is Loft Orbital’s first customer constellation, which will be the EarthDaily Analytics Corp. (“EarthDaily”) earth observation system. Each satellite in the YAC-1 constellation includes a VNIR imager, a SWIR imager, and a Thermal/IR imager. The satellites will be phased equally around the orbital plane and provide nearly daily coverage of major Earth land masses.The constellation is expected to be launched on two SpaceX Transporter missions.The first satellite is scheduled for launch in June 2024 and the remaining satellites in October 2024.The YAC-1 spacecraft are based on the AOS Arrowbus originally developed by Airbus for the OneWeb broadband telecommunications company.Basic physical dimensions are 1200 mm x 1052 mm x 1036 mm with a mass of approximately 216 kg.
SAT-LOA-20230924-00232Spire for Hubble Network (Bluetooth via satellites), three 16U sats on T10 (x2) and T11 (x1). Designed for Exolaunch deployers.
https://cadenaser.com/euskadi/2023/10/27/lur-1-es-el-primer-satelite-creado-en-euskadi-y-sera-lanzado-al-espacio-en-2024-ser-vitoria/
AVS is a Spanish company focused on the design and development of complex and critical equipment for the global big science and space markets. The company has contracted with Momentus to fly its LUR-1 payload in the second quarter of next year on the SpaceX Transporter-11 mission targeted for launch no earlier than June 2024.
Congrats to SEOPS Team for recently being selected under the Streamlined CubeSat Launch Services of NASA's VADR (Venture-Class Acquisition of Dedicated and Rideshare) launch services contract. SEOPS is targeting launch of the CubeSats in June 2024 on a SpaceX Falcon 9 rocket.
ELaNa 53One CSLI CubeSat is part of the SpaceX Transporter 11 manifest. Dione (6U) – NASA’s Goddard Space Flight Center, Greenbelt, Md.
With three satellites already in space, Kuva Space will launch two new satellites in the coming year and launch its initial services. The first one, Hyperfield-1, is scheduled to launch in June 2024. This will mark the initial stage of Kuva Space’s planned constellation, which aims to deploy up to 100 satellites by 2030.