GT: from CCTV -
Shenzhou-14 mission day 30, in the past month:
· The crew used the material management system to classify and sort out the materials of the whole station, and ACC optimized and upgraded the software;
· On June 23, the crew completed the assembly and testing of the CO ₂ reduction (Sabatier reaction) subsystem of the new component of the space station environmental control and life protection system;
· CMPR cabinet material science experiments, aerospace medical experiments, etc. have been launched one after another.
https://twitter.com/SegerYu/status/1544224138751254529
Shenzhou-14 astronauts busy preparing to receive the laboratory modules..