ISS US EVA-79
« on: 03/10/2022 10:18 pm »
March 10, 2022
MEDIA ADVISORY M22-030
NASA to Air Briefing, Spacewalks to Upgrade Space Station

Crew members from International Space Station Expedition 66 will conduct two spacewalks Tuesday, March 15, and Wednesday, March 23, to continue upgrades to the orbiting laboratory.

NASA will discuss the upcoming spacewalks during a news conference at 2 p.m. EDT Monday, March 14. Live coverage of the news conference and spacewalks will air on NASA Television, the agency’s website, and the NASA app.

News conference participants are:

    Joel Montalbano, manager, NASA International Space Station program
    Dina Contella, operations integration manager, NASA International Space Station program
    Mike Lammers, March 15 spacewalk flight director
    Sandra Moore, March 15 spacewalk officer
    Paul Konyha, March 23 spacewalk flight director
    Sandra Fletcher, March 23 spacewalk officer

Media wishing to participate in the briefings in person must request credentials from the Johnson newsroom at: 281-483-5111 or [email protected] no later than noon Friday, March 11. Media interested in participating by phone must contact the Johnson newsroom by noon Monday, March 14. Those wanting to submit a question on social media may do so using #askNASA.

Coverage will begin at 6:30 a.m. for the Tuesday, March 15, spacewalk, which will begin around 8:05 a.m. Coverage will begin at 7:30 a.m. for the Wednesday, March 23, spacewalk, which will be begin around 8:50 a.m. Both spacewalks will last approximately 6 hours, 30 minutes.

NASA Flight Engineers Kayla Barron and Raja Chari will conduct the Tuesday, March 15, spacewalk, designated U.S. EVA 79, assembling and installing modification kits required for upcoming solar array upgrades. The pair will install brackets and struts to support the future installation of an ISS Roll-Out Solar Array (iROSA). So far, two of six iROSAs have been deployed on station with four additional arrays to be delivered. The arrays will ultimately augment six of the station’s eight power channels, increasing the station’s total available power from 160 kilowatts to up to 215 kilowatts.

Barron will serve as extravehicular crewmember 1 (EV 1) and will wear a suit with red stripes. Chari will serve as extravehicular crewmember 2 (EV 2) and will wear a suit with no stripes. The spacewalk will be the second of Barron’s career and the first for Chari.

For the Wednesday, March 23, spacewalk, designated U.S. EVA 80, two astronauts will install hoses on a Radiator Beam Valve Module that routes ammonia through the station’s heat-rejecting radiators to keep systems at the proper temperature. The crew members will also install a power and data cable on the Columbus module’s Bartolomeo science platform, replace an external camera on the station’s truss, and conduct other upgrades to station hardware.

Astronaut roles for the Wednesday, March 23, spacewalk will be confirmed after the first spacewalk is completed.

Get breaking news, images and features from the space station on Instagram, Facebook, and Twitter.

For more information about the International Space Station, its research, and crew, visit:

https://www.nasa.gov/station
« Last Edit: 03/10/2022 10:20 pm by Targeteer »
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline cohberg

  • Full Member
  • **
  • Posts: 205
  • Liked: 653
  • Likes Given: 46
Re: ISS US EVA-79
« Reply #1 on: 03/11/2022 04:28 am »
ISS US EVA-79 IROSA Prep 3A

Quote from: https://blogs.nasa.gov/commercialcrew/2022/03/10/nasa-to-air-briefing-spacewalks-to-upgrade-space-station/
NASA Flight Engineers Kayla Barron and Raja Chari will conduct the Tuesday, March 15, spacewalk, designated U.S. EVA 79, assembling and installing modification kits required for upcoming solar array upgrades.

Scheduled for:March 15th, 2022 8:05 EST | NASA TV Start: 6:30AM EST
Estimated Duration:    6.5 hours
Starting Location: Quest airlock
Primary Worksite: 3A
EV1 (Red Stripe): Barron (EMU: Likely 3004 [1|2])
EV2 (No Stripe): Chari (EMU: Likely 3015)
Last Updated:3/14/2022 - CNG

DOUG EVA Movie (Unofficial Pre Release)
Quote from: US_EVA_IROSA_Prep_3A_v13 (3/7/2022)

DOUG EVA Steps (Unofficial Pre Release)
Quote from: US_EVA_IROSA_Prep_3A_v13 (3/7/2022)
1 Pre EVA Configuration
3 EGRESS
4 ---->EV1 Egress Airlock and Stow Strut Bag on BRT
5 ---->EV2 Egress Airlock with CL Bag on BRT
6 WORKSITE PREP
7 ---->EV1 Translate to S31S4 Interface, inboard of SARJ, GRN Hook to S3 HR 3060
8 ---->EV1 Translate to 3A [EA non-radiator side, Stow Strut Bag on S4 HRs 220712206
9 ---->EV2 Translate to STBD CETA Cart, Stow CL Bag on CETA Cart Square Grid
10 ---->EV2 Retrieve WIFEX/APFR from STBD CETA Cart WIF 01, stow on BRT
11 ---->EV2 Translate to STBD SARJ, GRN Hook to S3 HR 3061, translate to 3A [EA
12 ---->EV2 Install WIFEX in S4 WIF 26 [6,G,5], set APFR to [12, TT, F, 12]
13 UPPER TRIANGLE BUILD
14 ->AS SEMBLE RIGHT UPPER STRUT TO MOUNTING BRACKET
15 ---->EV2 Translate to EV1, install Right Upper Strut L7 to Mounting Bracket using PGT [B3, CW2]
16 ->Assemble Left Upper Strut to Center Pad
17 ---->EV1 Install Left Upper Strut L2 to Center Pad L2, Drive bolt M17 to torque PGT [B1, CW2]
18 ---->EV1 Install Center Pad MLI and Pip-pin
19 ->Assemble Left Upper Strut to Mounting Bracket
20 ---->EV2 Install Left Upper Strut L8 to Mounting Bracket left side PGT [B3 CW2]
21 ---->EV1 Install Mounting Bracket MLI, then Drive M13, M14 to torque with PGT [B3, CW2]
22 ---->EV1 EV1 Move PGT w 7116 to Right Upper Strut HR
23 CENTER PAD TO MAST CANISTER
24 ---->EV2 Translate to and ingress APFR S4 WIF 26, receive Upper Triangle w/ PGT from EV1
25 ---->EV2 Install Center Pad to Mast Canister, arrow pointing up
26 ---->EV1 Stow SHORT PGT on S4 HR 2240
27 ---->EV2 Transfer LONG PGT from Upper Triangle to EV1
28 ---->EV2 Verify PIP Pin and MLI for Left/Right Upper Strut is closed
29 INSTALL 3A LEFT STRUTS
30 ->LEFT LOWER STRUT INSTALL
31 ---->EV2 Egress APFR, adjust WIFEX to 1 [6,G,1] and APFR to [12,PP,H,12]
32 ---->EV2 Receive Left Mid Strut, stow on BRT, then ingress APFR
33 ---->EV2 Receive Left Lower Strut from EV1
34 ---->EV1 Translate to SABB launch bracket, report spherical bearing alignment
35 ---->EV1 Install Left Lower Strut M21 to SABB launch bracket, handstart M21 4 turns
36 ---->EV2 Start Left Lower Strut L5 to Mounting Bracket L5 Install using PGT [B1, CW2] on Bolt M22
37 ---->EV1 Drive M21 to torque with PGT [B7, CW2], then final torque w/ torque wrench [CW, 60 ft/lbs]
38 ---->EV2 Once M21 at torque, drive M22 to torque, PGT [B1, CW2], then stow PGT
39 ---->EV2 Install grounding PIP pin to grounding block and install MLI
40 ->LEFT MID STRUT INSTALL
41 ---->EV1 Translate to mast canister Left Pad Install location
42 ---->EV2 Extend Mid Strut, Side Pad toward EV1
43 ---->EV1 Install Left Side Pad to Mast Canister, arrow pointing up, right side first, then pivot left
44 ---->EV1 Start bolts M1-M4, 2 turns LONG PGT [A2, CW2]
45 ---->EV2 Install Left Mid Strut to Upper Strut L8 bolt M28 using PGT [B1, CW2] then stow PGT
46 ---->EV1 Drive bolts M1-M4 to toque LONG PGT [A2, CW2], then stow PGT
47 ---->EV2 Install PIP pin top grounding block
48 ---->EV1 Verify Pip-pin and Install MLI over Side Pad
49 ---->EV1 Retrieve SHORT PGT from S4 HR 2240, retrieve Torque Wrench from Left Lower Strut HR, tether to PGT
50 ---->EV1 Translate to strut bag, stow SHORT PGT and Torque Wrench on Right Lower Strut HR
51 INSTALL 3A RIGHT STRUTS, MLI & CLAMPS
52 ->RIGHT LOWER STRUT INSTALL
53 ---->EV2 Egress APFR and set to [12,PP,C,12]
54 ---->EV2 Receive right Mid Strut and Ingress APFR, then receive Right Lower Strut from EV1
55 ---->EV2 Release L6 grounding PIP Pin from strut stow location
56 ---->EV1 Translate to mast canister right side SABB launch bracket, report bearing alignment
57 ---->EV1 Install Right Lower Strut M19 to SABB launch bracket, M 19 4 turns
58 ---->EV2 Start Right Lower Strut L6 to Mounting Bracket L6, M20 2 turns PGT1 [B1,CW2]
59 ---->EV1 Drive M19 to torque with SHORT PGT [B7, CW2], then final torque with torque wrench[CW, 60 ft-lbs]
60 ---->EV1 Leave SHORT PGT and Torque Wrench on Right Lower Strut HR
61 ---->EV2 Drive bolt M20 to torque PGT [B1, CW2], stow PGT
62 ---->EV1 verify MLI covering lower strut pad
63 ---->EV2 Install grounding PIP pin to grounding block and install MLI-
64 ->RIGHT MID STRUT INSTALL
65 ---->EV1 Translate to mast canister Right Side Pad install location
66 ---->EV2 Release PIP Pins and Extend Mid Strut, Side Pad toward EV1-
67 ---->EV1 Install Right Side Pad to Mast Canister, arrow pointing up
68 ---->EV1 Start bolts M9-M12 two turns by hand or with LONG PGT [A2, CW2]
69 ---->EV2 Drive M24 to torque PGT [B1, CW2], then stow PGT
70 ---->EV1 Drive bolts M9-M12 to torque PGT [A2, CW2]
71 ---->EV1 Verify MLI covering side pad clevis
72 ---->EV2 Install PIP pin to grounding block
73 ->Clamps 8 MLI
74 ---->EV1 Verify Pip pin can reach receptacle, do not install
75 ---->EV1 Drive adjustment collar bolts M25, M26 to torque with PGT [B7, CW2]
76 ---->EV1 PGT to [RCW, 30.5], then drive bolts M25, M26 to torque, reset PGT to MTR
77 ---->EV1 Verify middle PIP Pin in final location and close MLI
78 ---->EV2 and EV1 Close MLI and Install Wire Ties
79 ---->EV2 Egress APFR, Retrieve SHORT PGT and Torque Wrench from Right Lower Strut HR
80 ->Left Mid Strut Adjustment Collar
81 ---->EV1 Translate to Left Mid Strut Adjustment Collar bolts M29 and M30
82 ---->EV1 Verify Pip pin can reach receptacle, do not install
83 ---->EV1 Drive bolts M29, M30 to torque with LONG PGT [B7, CW2]
84 ---->EV1 PGT to [RCW, 30.5], then drive M29, M30 to torque
85 ---->EV1 Release Folded MLI and install middle PIP pin
86 ---->EV1 MLI around Collar bolts and mount bracket, install 2 wire ties around midstrut MLI
87 ---->EV1 Verify MLI covering side pad clevis
88 ->3A MOD KIT CLEANUP
89 ---->EV2 Translate to Strut Bag, Stow Short PGT and Torque Wrench and fold the Strut bag
90 ---->EV2 Translate to S4 WIF 26, retrieve WIFEX+APFR+AIA to Stow on BRT
91 ---->EV1 Photograph Mod-kit showing final MLI config
92 ->BCDU MLI TIEBACK
93 ---->EV2 Translate to STBD CETA Cart WIF01, Green Hook stays on S3 HR3061
94 ---->EV1 Translate outboard non radiator side to S6 BCDU
95 ---->EV1 Attach Wire Ties to inboard and outboard stanchions of HR 2008
96 ---->EV1 Translate to Radiator side of BCDU
97 ---->EV2 Stow WIFEX, APFR, AIA in WIF 01 [11,A,1] [12, FF, A, 6]
98 ---->EV2 Retrieve CL Bag from CETA cart, stow on BRT, then translate to S6 BCDU
99 ---->EV2 Temp stow CL Bag on HR 2028
100 ---->EV1 Fully open MLI on BCDU 1
101 ---->EV1 Translate back to HR 2008, bringing lid along
102 ---->EV1 Form lid into triangle, then verify EWIS Antenna clear
103 ---->EV1 Attach long end of long wire tie from HR 2008 inboard stanchion
104 ---->EV2 Retrieve and Install 6 inch socket to PGT, then retrieve ratchet wrench
105 ---->EV2 Position for access to H1 Bolt on Outboard spare BCDU (SN 0026)
106 ---->EV1 Open Lid 2, and translate to S6 HR 2008, fold lid to triangle
107 ---->EV2 Break Torque on H1 and H2 with Ratchet Wrench, stow wrench on MW S
108 ---->EV2 Reset torque on H2, H1 with PGT [A6, CW2]
109 ---->EV1 Verify EWIS Antenna clear, then attach outboard stanchion wire tie to lid loop
110 ---->EV1 Photograph final configuration of BCDU MLI showing EWIS Antenna
111 ---->EV2 Position to access H1 bolt on inboard spare BCDU (SN 0029)
112 ---->EV2 Break Torque on H1 and H2 with Ratchet Wrench, stow wrench on MWS
113 ---->EV2 Reset torque on H2, H1 with PGT [A6, CW2], stow wrench in CL Bag
114 ---->EV2 Stow CL Bag from S6 HR 2028 on BRT
115 ---->EV2 Translate to AL, Retrieve Green Hook from S3 HR 3061, Fairlead from HR 3409
116 ---->EV1 Retrieve Strut Bag on 3A lEA, stow on BRT
117 ---->EV1 Translate to AL, retrieve GRN hook from S3 HR 3060
118 ---->EV1 Release CETA Cart brakes x2, then Retrieve fairlead from HR 3410
119 ---->EV2 Ingress AL
120 ---->EV1 Transfer Strut Bag to EV2 and Ingress AL
« Last Edit: 03/15/2022 12:08 am by cohberg »

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 5357
  • near hangar 18
  • Liked: 2351
  • Likes Given: 847
Re: ISS US EVA-79
« Reply #2 on: 03/15/2022 04:25 am »
Crew is up and their first call is that the toilet, WHC, has an error code.
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 5357
  • near hangar 18
  • Liked: 2351
  • Likes Given: 847
Re: ISS US EVA-79
« Reply #3 on: 03/15/2022 04:33 am »
Ground is working the issue but the WHC is no go. The Russians have approved use of their, toilet...
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 5357
  • near hangar 18
  • Liked: 2351
  • Likes Given: 847
Re: ISS US EVA-79
« Reply #4 on: 03/15/2022 05:03 am »
First call from the airlock, cameras are on and ground is welcome on board.
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 5357
  • near hangar 18
  • Liked: 2351
  • Likes Given: 847
Re: ISS US EVA-79
« Reply #5 on: 03/15/2022 05:07 am »
CAPCOM notes Mark will set record for US time on orbit on one mission this afternoon...
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 5357
  • near hangar 18
  • Liked: 2351
  • Likes Given: 847
Re: ISS US EVA-79
« Reply #6 on: 03/15/2022 05:09 am »
WHC is go for use.  Much rejoicing on the US segment...
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 5357
  • near hangar 18
  • Liked: 2351
  • Likes Given: 847
Re: ISS US EVA-79
« Reply #7 on: 03/15/2022 05:19 am »
One EMU is 3004
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 5357
  • near hangar 18
  • Liked: 2351
  • Likes Given: 847
Re: ISS US EVA-79
« Reply #8 on: 03/15/2022 05:22 am »
aft EMU is 3015
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 5357
  • near hangar 18
  • Liked: 2351
  • Likes Given: 847
Re: ISS US EVA-79
« Reply #9 on: 03/15/2022 05:41 am »
Start mask pre-breathe for "an all turtle spacewalk"--CAPCOM
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Online Jimmy_C

  • Full Member
  • **
  • Posts: 209
  • Liked: 183
  • Likes Given: 5901
Re: ISS US EVA-79
« Reply #10 on: 03/15/2022 06:26 am »
I felt a little bit of vertigo watching that video! It's easy to forget how dangerous working outside the ISS can be. Johnson posted a video of Spacewalk 79 and 80:

EVA-79:


EVA-80:


Here's to an easy and successful EVA! Much luck!

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 5357
  • near hangar 18
  • Liked: 2351
  • Likes Given: 847
Re: ISS US EVA-79
« Reply #11 on: 03/15/2022 06:54 am »
comm checks in work
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline eeergo

Re: ISS US EVA-79
« Reply #12 on: 03/15/2022 10:40 am »
-DaviD-

Offline eeergo

Re: ISS US EVA-79
« Reply #13 on: 03/15/2022 10:43 am »
Depressurization started. Going down to 5 psi before pausing.
-DaviD-

Offline eeergo

Re: ISS US EVA-79
« Reply #14 on: 03/15/2022 10:48 am »
Down to 5 psi, pausing for systems checks.
-DaviD-

Offline eeergo

Re: ISS US EVA-79
« Reply #15 on: 03/15/2022 10:51 am »
Suit leak checks good, moving on to final depressurization of the crew lock to vacuum.
-DaviD-

Offline eeergo

Re: ISS US EVA-79
« Reply #16 on: 03/15/2022 11:04 am »
1 psi. Crew hardware config check done.
-DaviD-

Offline eeergo

Re: ISS US EVA-79
« Reply #17 on: 03/15/2022 11:11 am »
GO for hatch open.
7:12 Central time is the official time for the start of EVA-79.
« Last Edit: 03/15/2022 11:14 am by eeergo »
-DaviD-

Offline eeergo

Re: ISS US EVA-79
« Reply #18 on: 03/15/2022 11:12 am »
IV crew hands over to MCC-H now that the EVA has officially started.
-DaviD-

Offline ChrisGebhardt

  • Assistant Managing Editor
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 7842
  • ad astra scientia
  • ~1 AU
  • Liked: 7877
  • Likes Given: 853

Tags:
 

Advertisement NovaTech
Advertisement SkyTale Software GmbH
Advertisement Northrop Grumman
Advertisement
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0