Author Topic: ISS RS VKD-51 Nauka Outfitting #3 - Jan. 19, 2022 [Shkaplerov,Dubrov]  (Read 25605 times)

Offline cohberg

  • Full Member
  • **
  • Posts: 260
  • Liked: 849
  • Likes Given: 55
Nauka Multipurpose Laboratory Module Outfitting Spacewalk #3

Quote from: Roscosmos
The main goal of the work is to integrate the Prichal nodal module, which arrived at the International Space Station at the end of November 2021, into the Russian segment of the ISS.

https://www.roscosmos.ru/33749/

Scheduled for:January 19th 7AM EST | NASA TV Start: 6AM EST
Estimated Duration:    6.6 hours
Starting Location: Poisk
Primary Worksite: Nauka/Prichal
EV1 (red stripe): Shkaplerov (Orlan Suit #5)
EV2 (blue stripe): Dubrov (Orlan Suit #4)

Roscosmos Timeline
StepDescriptionMinutesElapsed Time-
-Opening the exit hatch of the "Search" module-0:00-
1Roscosmos cosmonauts Anton Shkaplerov and Pyotr Dubrov fix the exit hatch
  cover and install a protective ring
100:10-
2At 15:10 Moscow time, Petr Dubrov should exit the Search
  module. Removal of styling begins
150:25-
3A few minutes later, Roskosmos cosmonaut Anton Shkaplerov leaves the
  Search module.
50:30-
4Astronauts transfer the cargo boom from the transition compartment to the
  multipurpose laboratory module "Science"
200:50-
5Transition with packing along the boom to the pressurized adapter of the
  "Science" module
401:30-
-  Relaxation---
6Petr Dubrov goes to the "Prichal" nodal module and installs
  restraints on the handrails around ASP-G
202:00-
-At the same time, Anton Shkaplerov separates the styling and prepares PP1
  for installation
---
7Direct installation of PP1152:15-
8The cosmonauts are assembling and connecting the Kurs-P cables between
  the Prichal and Nauka modules, and then redoing the connector on the FP2 node
  module.
252:40-
9Cosmonauts are assembling AR-VKA / 2AR-VKA and 4AO-VKA antennas203:10-
-  Relaxation---
10The cosmonauts are dismantling the covers of the screen-vacuum thermal
  insulation from the handrails
153:35-
11Astronauts install PP2203:55-
12The cosmonauts are installing and connecting TV cables between the
  Prichal and Nauka modules;
154:10-
13Dismantling the lamp and TV camera204:30-
-  Based on the results, a test of the "Kurs"
  equipment is carried out
---
-  Relaxation---
14Petr Dubrov is installing a TV camera on TK2205:00-
-Anton Shkaplerov installs limiters on handrails around ASA-G---
-  The astronauts are checking the connection of the TV camera---
15Cosmonauts are assembling docking targets and docking control205:20-
16Per Dubrov pushes the 4AO-VKA antenna covers and two empty containers
  away from the "Prichal" nodal module
55:25-
17The cosmonauts dismantle the antennas 2ASF1-M-VKA No. 1,2 and AO-753A,
  after which they push the dismantled antennas away
255:50-
18The crew goes to the "Science" module, they control the
  Orlan-MKS spacesuits, wipe the gloves and push off the towels
55:55-
19The astronauts return to the exit hatch of the "Search" module256:20-
20Anton Shkaplerov and Petr Dubrov are monitoring the attachments of the
  Orlan-MKS spacesuits.
56:25-
21The cosmonauts return to the "Search" module, then, according
  to the plan, they carry out the drying of the TO, remove the protective ring
  and close the hatch.
156:40-

DOUG Steps

Based on outdated RS_EVA_51_v1 (1/6/2022 )


Quote from: RS_EVA_51_v3 - (updated on 1/10/2022)
1 Pre EVA Configuration
3 Egress MRM2
---->Open and Tether EV hatch and install protective ring
5 ---->EV2 Egress MRM2 to STRELA boom
6 ---->Take EVA bundles out of MRM2
7 ---->EV1 Egress MRM2
8 Configure STRELA
9 ---->EV1 Translate to STRELA Operators post, Tether and monitor EVA bundle
10 ---->EV2 Translate along STRELA boom to EE then Release EE from nx0
11 ---->EV1 Maneuver STRELA from nx0 to MLM HR4100
12 ---->EV2 Attach EE to MLM HR4100
13 Transfer EVA bundle to NM
14 ---->EV1 Translate with EVA bundle along STRELA boom using translation ring to HR 4100
15 ---->EV2 Translate with US safety tether along MLM HRs 4100- ... -4108
16 ---->EV1 Translate with EVA bundle along MLM HRs 4100- ... -4108
17 ---->EV2 Translate with US safety tether to HRs 4101- ... -4580
18 ---->EV1 Translate with EVA bundle to MLM HRs 4108- ... -4580
19 ---->EV2 Translate with US safety tether to NM HRs 4580- ... -7445 Attach tether to HR 7444
20 EV1 Split EVA bundle and Prep short-cut HR 2 for installation
21 EV2 Translate to HR 7661 and Install handrail limiter then Remove MLI covers from HRs
22 Install short-cut HR 2 between HRs 4580 - 7443
23 Install NM Kurs-P cables
24 ---->EV1 Translate with KPU EVA Tool Carrier to NM HR 7225 and Install cable clamps K3 and K4
25 ---->EV2 Translate along MLM to On26 Connector Patch Panel and Demate MLM Kurs-P cables
26 ---->EV1,EV2 Secure NM Kurs-P cables in cable clamps. Mate NM Kurs-P cables to On26 panel
27 ---->EV1 Translate to NM On2 Patch Panel and Remate cnctr 1,2,3 to unused cnctr 4,5,6
28 ---->EV2 Translate to NM On1 and Remove MLI cover from On1
29 ---->EV2 Mate to On1 NM Kurs-P cables
30 Install Antennas
31 ---->EV1 Translate with [AP-BKA], [2AP-BKA] antennas to site AS along PI. D
32 ---->EV1 Secure boom with antennas in lock and Mate antenna cables to On7
33 ---->EV2 Translate with [4A0-BKA] antenna to site A4 along PIA
34 ---->EV2 Remove MLI cover from A4 and Install antenna then Mate cables to On6
35 EV1 Translate with TV cable along NM PI. D to MLM interface and Demate from On18 MLM TV cable
36 EV1 Mate NM TV cable to On18 and Route cable under MLM HR to NM On2
37 EV1 Mate to cnctr 7 on NM On2
38 EV2 Install limiters on HRs 7551, 7553, 7554, 7441, 7338
39 Translate to TV camera between NM Pl. I-IV HRs 7552,7553 and Remove camera from port [TK1]
40 EV1 Translate to container with target on NM PH
41 EV1 Install Docking monitoring target and Docking target
42 EV2 Transfer TV camera along NM Pl. IV to camera port [TK2]
43 EV2 Remove MLI cover from [TK2] port and Install camera then Mate TV camera cable to On9
44 Jettison [4A0-BKA] antenna cover and 2 empty containers from NM
45 EV1 Remove floodlight unit
46 EV2 Install limiters on HR 7557 and Install cable clamps K1, K2, K5
47 Install short-cut HR 1 between HRs 4570-7225
48 Remove 2AC01-M-BKA antennas 1,2 and [A0-753A] antenna
49 Jettison removed antennas
50 Return to MRM2
51 ---->Translate to MLM with CPU EVA Tool Carrier, Crew Lock Bag and US safety tether
52 ---->Perform visual inspection of Orlans, wipe gloves, jettison wipes
53 ---->Translate along MLM and STRELA boom to MRM2 EV hatch
54 ---->Perform inventory of EVA tools and HW
55 Ingress MRM2
« Last Edit: 01/10/2022 05:22 pm by cohberg »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 12389
  • CETI Alpha V
  • Liked: 8819
  • Likes Given: 5335
To boldly go where no human has gone before !

Online SPKirsch

  • Full Member
  • ****
  • Posts: 448
  • Germany
  • Liked: 790
  • Likes Given: 798
https://www.nasa.gov/nasalive
Quote
January 19, Wednesday
6 a.m. Coverage of the ISS Expedition 66 Russian spacewalk #51 to outfit the Nauka Multipurpose Laboratory Module (Shkaplerov and Dubrov; spacewalk scheduled to begin at 7 a.m. EST and last 7 hours)

Offline eeergo

Roscosmos' preview video for tomorrow's VKD:

https://www.roscosmos.ru/33851/

-DaviD-

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 12389
  • CETI Alpha V
  • Liked: 8819
  • Likes Given: 5335
« Last Edit: 01/18/2022 04:45 pm by centaurinasa »
To boldly go where no human has gone before !

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 12389
  • CETI Alpha V
  • Liked: 8819
  • Likes Given: 5335
"Cosmonauts @Anton_Astrey and Pyotr Dubrov are preparing for a spacewalk:

Cosmoonauts, Today, they inspect equipment and instruments, inspect spacesuits, and consult with experts on Earth on upcoming work in outer space."

https://twitter.com/roscosmos/status/1483447220410138626?cxt=HHwWhICy-eTYoZYpAAAA

https://www.roscosmos.ru/33851/
To boldly go where no human has gone before !

Offline eeergo

A view of MRM-1 Rassvet I would rather say...

https://twitter.com/astro_matthias/status/1483471032409333766

Indeed, and the TRRJ on the right image. Guessing Matthias didn't do the mistake himself, probably some mixup in ESA's PAO?
-DaviD-

Offline eeergo

SARJs parked in preparation for the VKD starting in about 2 hours' time.

https://twitter.com/liamkennedy/status/1483744687085084674
-DaviD-

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 12389
  • CETI Alpha V
  • Liked: 8819
  • Likes Given: 5335
To boldly go where no human has gone before !

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 12389
  • CETI Alpha V
  • Liked: 8819
  • Likes Given: 5335
Our today's PAO, the "legendary" Rob Navias !
« Last Edit: 01/19/2022 10:03 am by centaurinasa »
To boldly go where no human has gone before !

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 12389
  • CETI Alpha V
  • Liked: 8819
  • Likes Given: 5335
« Last Edit: 01/19/2022 10:04 am by centaurinasa »
To boldly go where no human has gone before !

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 12389
  • CETI Alpha V
  • Liked: 8819
  • Likes Given: 5335
Depressurization of MRM-2 Posk in progress...
« Last Edit: 01/19/2022 10:07 am by centaurinasa »
To boldly go where no human has gone before !

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 12389
  • CETI Alpha V
  • Liked: 8819
  • Likes Given: 5335
MCC-M
To boldly go where no human has gone before !

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 12389
  • CETI Alpha V
  • Liked: 8819
  • Likes Given: 5335
« Last Edit: 01/19/2022 10:44 am by centaurinasa »
To boldly go where no human has gone before !

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 12389
  • CETI Alpha V
  • Liked: 8819
  • Likes Given: 5335
To boldly go where no human has gone before !

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 12389
  • CETI Alpha V
  • Liked: 8819
  • Likes Given: 5335
To boldly go where no human has gone before !

Offline eeergo

10 mm Hg of pressure in Poisk. Suits to internal power.
« Last Edit: 01/19/2022 11:04 am by eeergo »
-DaviD-

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 12389
  • CETI Alpha V
  • Liked: 8819
  • Likes Given: 5335
Suits check complete.
To boldly go where no human has gone before !

Offline eeergo

GO to open Poisk's hatch.
-DaviD-

Offline eeergo

-DaviD-

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0