-
#440
by
FutureSpaceTourist
on 02 Mar, 2023 03:51
-
-
#441
by
FutureSpaceTourist
on 02 Mar, 2023 03:52
-
-
#442
by
Steven Pietrobon
on 02 Mar, 2023 03:53
-
Crew access arm retract complete.
-
#443
by
Steven Pietrobon
on 02 Mar, 2023 03:56
-
Visors down and arming launch escape system.
-
#444
by
Steven Pietrobon
on 02 Mar, 2023 03:57
-
Launch escape system is verified armed.
-
#445
by
Steven Pietrobon
on 02 Mar, 2023 03:57
-
Tanks pressing for start of propellant load.
-
#446
by
Steven Pietrobon
on 02 Mar, 2023 03:59
-
T-35 minutes. First and second stage RP-1 and first stage LOX loading has started.
-
#447
by
FutureSpaceTourist
on 02 Mar, 2023 04:00
-
-
#448
by
FutureSpaceTourist
on 02 Mar, 2023 04:03
-
-
#449
by
Steven Pietrobon
on 02 Mar, 2023 04:05
-
T-30 minutes. Cryo helium loading has started.
-
#450
by
Steven Pietrobon
on 02 Mar, 2023 04:09
-
-
#451
by
FutureSpaceTourist
on 02 Mar, 2023 04:13
-
Selection of NASA photos attached - details of the first:
https://flic.kr/p/2ojFMtbNASA Administrator Bill Nelson, left, Bob Cabana, NASA associate administrator, center, and Kennedy Space Center director Janet Petro, right, wave as the vehicles carrying Roscosmos cosmonaut Andrey Fedyaev, NASA astronaut Warren “Woody" Hoburg, second from left, NASA astronaut Stephen Bowen, second from right, and UAE (United Arab Emirates) astronaut Sultan Alneyadi, right, wearing SpaceX spacesuits, depart the Neil A. Armstrong Operations and Checkout Building for Launch Complex 39A to board the SpaceX Dragon spacecraft for the Crew-6 mission launch, Wednesday, March 1, 2023, at NASA’s Kennedy Space Center in Florida. NASA’s SpaceX Crew-6 mission is the sixth crew rotation mission of the SpaceX Crew Dragon spacecraft and Falcon 9 rocket to the International Space Station as part of the agency’s Commercial Crew Program. Bowen, Hoburg, Alneyadi, and Fedyaev are scheduled to launch at 12:34 a.m. EST on March 2, from Launch Complex 39A at the Kennedy Space Center. Photo Credit: (NASA/Joel Kowsky)
-
#452
by
Steven Pietrobon
on 02 Mar, 2023 04:14
-
T-20 minute vent. Second stage RP-1 load is complete.
-
#453
by
FutureSpaceTourist
on 02 Mar, 2023 04:16
-
-
#454
by
Steven Pietrobon
on 02 Mar, 2023 04:18
-
T-16 minutes. Second stage LOX loading has started.
-
#455
by
Steven Pietrobon
on 02 Mar, 2023 04:22
-
Crew in front of the first stage they were going to use, but was replaced with a new first stage.
-
#456
by
Steven Pietrobon
on 02 Mar, 2023 04:24
-
T-10 minutes. Crew displays configured for launch. Commander giving thanks to all the teams.
-
#457
by
Steven Pietrobon
on 02 Mar, 2023 04:26
-
Quite a large crowd working late at SpaceX.
-
#458
by
FutureSpaceTourist
on 02 Mar, 2023 04:27
-
-
#459
by
Steven Pietrobon
on 02 Mar, 2023 04:27
-
T-7 minutes. Engine chill has started.