Forums
L2 Sign Up
SLS/Orion
SpaceX
Commercial
ISS
International
Other
Shop
Home
Help
Tags
Calendar
Login
Register
Forums
»
International Space Station (ISS)
»
ISS Section
»
ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
179
Likes
Print
Pages:
1
2
[
3
]
4
5
...
7
Next
All
Go Down
Author
Topic: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan] (Read 21104 times)
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #40 on:
12/02/2019 10:30 am »
GO to open hatch! First view from outside, in the dark over the Pacific.
Logged
Chris Bergin
likes this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #41 on:
12/02/2019 10:32 am »
EV hatch and thermal cover OPEN! Christina and Jessica getting praise for their good work, Jeremy Hanson taking over.
Switch to batteries around 11:32 UTC!
Logged
Chris Bergin
likes this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #42 on:
12/02/2019 10:34 am »
Officially 11:31
First view of the open thermal cover.
Logged
dsmillman
Member
Full Member
Posts: 1446
Liked: 279
Likes Given: 12
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #43 on:
12/02/2019 10:35 am »
There is a rough EVA timeline in CET at:
http://blogs.esa.int/luca-parmitano/2019/11/29/watch-the-third-spacewalkforams/
Logged
Chris Bergin
,
zubenelgenubi
and
MattBaker
like this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #44 on:
12/02/2019 10:37 am »
And Luca is out, bag first, seemed quite the tight fit in the crew lock today
Logged
Chris Bergin
likes this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #45 on:
12/02/2019 10:47 am »
After temp-stowing a bag and tether placing out comes the new pump system!
First task: Shepherding the quite big pump system to Luca's ingress spot at the Canadarm.
Logged
Chris Bergin
likes this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #46 on:
12/02/2019 10:52 am »
Drew out as well, thermal cover closed, double-checking everything to make sure all is good.
Orbital sunrise about to happen.
Logged
Chris Bergin
likes this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #47 on:
12/02/2019 10:59 am »
Sun up, moving the big new pump assembly, lots of communication between Luca and Drew to make sure all is safe.
Logged
Chris Bergin
and
zubenelgenubi
like this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #48 on:
12/02/2019 11:00 am »
There's the Canadarm! Luca will ride it to the AMS with the pump system, Drew will "walk" with some bags.
Logged
Chris Bergin
likes this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #49 on:
12/02/2019 11:04 am »
Luca configuring the APFR on the arm while Drew holds onto the pump system, preparing to ride the arm for the third time in this series of EVAs.
Logged
Chris Bergin
likes this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #50 on:
12/02/2019 11:10 am »
Luca ingressed the APFR, Cygnus and our planet making for a beautiful background, and asked for some motion to get closer to Drew and the UTTPS. Our arm operator today is Jessica Meir.
Logged
zubenelgenubi
and
Chris Bergin
like this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #51 on:
12/02/2019 11:14 am »
Luca Parmitano got the pump system, which weighs as much as two strong men!
Luca will now ride the arm to the worksite, Drew is on the move back to the airlock to pick up bags with tools and "walk" his way to the worksite.
«
Last Edit: 12/02/2019 11:14 am by MattBaker
»
Logged
Chris Bergin
likes this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #52 on:
12/02/2019 11:17 am »
"Don't let go of the box and enjoy the view"
Arm beginning to move!
Logged
zubenelgenubi
and
Chris Bergin
like this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #53 on:
12/02/2019 11:25 am »
Andrew Morgan is already at the worksite, stowing his bags and configuring his APFR.
The robotic arm is still on the move.
Logged
Chris Bergin
likes this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #54 on:
12/02/2019 11:28 am »
Luca flying with the HTV External Pallet in view, some more EVAs will happen there as well.
Logged
Chris Bergin
likes this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #55 on:
12/02/2019 11:30 am »
Sticking out to the right are Drew Morgan's feet, I think, while Luca approaches with the new pump system that is today's task.
Logged
Chris Bergin
likes this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #56 on:
12/02/2019 11:38 am »
Luca's at the worksite, working with Jessica and Drew to guide him without hitting anything.
First up is attaching the new pump system to the Mechanical Attachment Device (MAD) that was installed during the last spacewalk.
Logged
zubenelgenubi
and
Chris Bergin
like this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #57 on:
12/02/2019 11:43 am »
GCA complete, brakes are on! Luca's at the worksite, his feet still visible for the camera.
Logged
Chris Bergin
likes this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #58 on:
12/02/2019 11:53 am »
Pistol grip tool time, attaching the UTTPS to the MAD. Four bolts to drive, sadly no helmet cams yet today?
All good, the Upgraded Tracker Thermal Pump System is attached to the AMS. "Sounded like a really clean install."
Night time again.
Logged
centaurinasa
and
Chris Bergin
like this
MattBaker
Full Member
Posts: 358
Liked: 345
Likes Given: 252
Re: ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
«
Reply #59 on:
12/02/2019 11:55 am »
Coming up is the bulk of today's work and quite an intricate one, too. Swaging and connecting the tubes from the AMS and the UTTPS.
Logged
Chris Bergin
likes this
Print
Pages:
1
2
[
3
]
4
5
...
7
Next
All
Go Up
Tags:
Forums
»
International Space Station (ISS)
»
ISS Section
»
ISS U.S. EVA-61 (AMS-02 TTCS repair#3) - Dec 2nd, 2019 [Parmitano, Morgan]
Advertisement
Advertisement
Advertisement
Tweets by NASASpaceflight
Advertisement
Advertisement
Advertisement
Advertisement
0