Is there a list of the tests performed with the ML at Pad 39B, including which date(s) the test took place?
For this rollout with the ML, the trip will head to Pad 39B, which also has undergone a large-scale modification over recent years.Following demolition work removing its Shuttle era structures, the pad is now deemed a “clean pad”, although it has an array of structures catered to hook up the pad’s utilities to that on the ML.It’s possible that engineers will once again test the Sound Suppression System, a water deluge system, when at 39B.“
Thanks.