Author Topic: Microsat-R - PSLV DL C44 - January 24 2019  (Read 15008 times)

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #80 on: 01/24/2019 04:53 pm »
T-15 minutes. Key has been turned. Automated launch sequence has been authorised.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #81 on: 01/24/2019 04:55 pm »
T-12 minutes. Showing PSLV video.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #82 on: 01/24/2019 04:57 pm »
T-10 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #83 on: 01/24/2019 04:59 pm »
T-9 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #84 on: 01/24/2019 05:00 pm »
T-8 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #85 on: 01/24/2019 05:01 pm »
T-7 minutes. 4-6 m/s groundspeed.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #86 on: 01/24/2019 05:02 pm »
T-6 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #87 on: 01/24/2019 05:03 pm »
T-5 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #88 on: 01/24/2019 05:04 pm »
T-4 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #89 on: 01/24/2019 05:05 pm »
T-3 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #90 on: 01/24/2019 05:06 pm »
T-2 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #91 on: 01/24/2019 05:07 pm »
T-1 minute.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #92 on: 01/24/2019 05:08 pm »
Liftoff!
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.


Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #94 on: 01/24/2019 05:09 pm »
T+1 minute.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #95 on: 01/24/2019 05:10 pm »
First stage separation.

T+2 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #96 on: 01/24/2019 05:11 pm »
Fairing separation.

T+3 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #97 on: 01/24/2019 05:12 pm »
T+4 minutes.

Second stage separation.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #98 on: 01/24/2019 05:13 pm »
T+5 minutes. 120 km altitude.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 18646
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6669
  • Likes Given: 918
Re: Microsat-R - PSLV DL C44 - January 24 2019
« Reply #99 on: 01/24/2019 05:14 pm »
T+6 minutes. PS3 burnout.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Tags: