Author Topic: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates  (Read 182489 times)

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 39463
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 33125
  • Likes Given: 8906
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #320 on: 05/11/2018 08:41 pm »
One minute to second ignition.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline ChrisGebhardt

  • Assistant Managing Editor
  • Senior Member
  • *****
  • Posts: 7842
  • ad astra scientia
  • ~1 AU
  • Liked: 7877
  • Likes Given: 853
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #321 on: 05/11/2018 08:41 pm »
Stage 2 has RESTARTED!

Online ZachS09

  • Space Savant
  • Senior Member
  • *****
  • Posts: 8494
  • Roanoke, TX
  • Liked: 2416
  • Likes Given: 2103
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #322 on: 05/11/2018 08:41 pm »
M-Vac relight confirmed. This second burn will last 59 seconds.
Liftoff for St. Jude's! Go Dragon, Go Falcon, Godspeed Inspiration4!

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 39463
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 33125
  • Likes Given: 8906
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #323 on: 05/11/2018 08:42 pm »
Ignition!
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online ZachS09

  • Space Savant
  • Senior Member
  • *****
  • Posts: 8494
  • Roanoke, TX
  • Liked: 2416
  • Likes Given: 2103
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #324 on: 05/11/2018 08:42 pm »
Altitude 297 kilometers, velocity 29,000 kilometers an hour.
Liftoff for St. Jude's! Go Dragon, Go Falcon, Godspeed Inspiration4!

Offline ChrisGebhardt

  • Assistant Managing Editor
  • Senior Member
  • *****
  • Posts: 7842
  • ad astra scientia
  • ~1 AU
  • Liked: 7877
  • Likes Given: 853
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #325 on: 05/11/2018 08:42 pm »
Stage 2 shutdown!  Bangabandhu is in Geostationary Transfer Orbit!

Offline Craig_VG

  • Full Member
  • **
  • Posts: 220
  • Liked: 731
  • Likes Given: 532
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #326 on: 05/11/2018 08:42 pm »
Beautiful Launch!! That sound really hit us


Here's the view  :D

Online ZachS09

  • Space Savant
  • Senior Member
  • *****
  • Posts: 8494
  • Roanoke, TX
  • Liked: 2416
  • Likes Given: 2103
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #327 on: 05/11/2018 08:42 pm »
T+28 minutes, 37 seconds. SECO-2. Between now and payload deployment, there will be a coast lasting 301 seconds.
Liftoff for St. Jude's! Go Dragon, Go Falcon, Godspeed Inspiration4!

Offline ChrisGebhardt

  • Assistant Managing Editor
  • Senior Member
  • *****
  • Posts: 7842
  • ad astra scientia
  • ~1 AU
  • Liked: 7877
  • Likes Given: 853
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #328 on: 05/11/2018 08:43 pm »
Good final orbit CONFIRMED!

Online ZachS09

  • Space Savant
  • Senior Member
  • *****
  • Posts: 8494
  • Roanoke, TX
  • Liked: 2416
  • Likes Given: 2103
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #329 on: 05/11/2018 08:43 pm »
GNC controller confirms good final orbit.
Liftoff for St. Jude's! Go Dragon, Go Falcon, Godspeed Inspiration4!

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 39463
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 33125
  • Likes Given: 8906
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #330 on: 05/11/2018 08:43 pm »
Cutoff! Good final orbit.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online ZachS09

  • Space Savant
  • Senior Member
  • *****
  • Posts: 8494
  • Roanoke, TX
  • Liked: 2416
  • Likes Given: 2103
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #331 on: 05/11/2018 08:44 pm »
T+30 minutes.

Altitude 370 kilometers, velocity 34,640 kilometers an hour.
Liftoff for St. Jude's! Go Dragon, Go Falcon, Godspeed Inspiration4!

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 50695
  • UK
    • Plan 28
  • Liked: 85214
  • Likes Given: 38176
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #332 on: 05/11/2018 08:44 pm »
Some launch photos

Quote
Liftoff! The maiden flight of the #SpaceX Block 5 Falcon 9 has launched from Kennedy Space Center carrying Bangabandhu-1 to geostationary orbit...

Annnd the booster has landed on the Of Course I Still Love You droneship

https://twitter.com/nova_road/status/995036875848024064

Offline ChrisGebhardt

  • Assistant Managing Editor
  • Senior Member
  • *****
  • Posts: 7842
  • ad astra scientia
  • ~1 AU
  • Liked: 7877
  • Likes Given: 853
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #333 on: 05/11/2018 08:44 pm »
3mins to spacecraft sep.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 39463
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 33125
  • Likes Given: 8906
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #334 on: 05/11/2018 08:44 pm »
Engine cooling down.

T+30 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online ZachS09

  • Space Savant
  • Senior Member
  • *****
  • Posts: 8494
  • Roanoke, TX
  • Liked: 2416
  • Likes Given: 2103
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #335 on: 05/11/2018 08:45 pm »
The Hartebeesthoek tracking station should now have AOS of the vehicle.
Liftoff for St. Jude's! Go Dragon, Go Falcon, Godspeed Inspiration4!

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 39463
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 33125
  • Likes Given: 8906
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #336 on: 05/11/2018 08:45 pm »
Waiting for separation in about three minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online ZachS09

  • Space Savant
  • Senior Member
  • *****
  • Posts: 8494
  • Roanoke, TX
  • Liked: 2416
  • Likes Given: 2103
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #337 on: 05/11/2018 08:46 pm »
90 seconds to payload deployment.
Liftoff for St. Jude's! Go Dragon, Go Falcon, Godspeed Inspiration4!

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 39463
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 33125
  • Likes Given: 8906
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #338 on: 05/11/2018 08:47 pm »
One minute to separation.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online ZachS09

  • Space Savant
  • Senior Member
  • *****
  • Posts: 8494
  • Roanoke, TX
  • Liked: 2416
  • Likes Given: 2103
Re: SpaceX F9 : Bangabandhu-1 : KSC 39A : May 11, 2018 : Updates
« Reply #339 on: 05/11/2018 08:47 pm »
30 seconds away now.
Liftoff for St. Jude's! Go Dragon, Go Falcon, Godspeed Inspiration4!

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0