Author Topic: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)  (Read 26475 times)

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 3906
  • US
  • Liked: 3280
  • Likes Given: 1919
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #60 on: 10/09/2018 06:05 PM »
SpaceX got a 5-year LLO for Falcon 9 flights from Vandenberg on October 4.

LLO 18-111
Quote
(a) "Flight" shall mean the flight of a Falcon 9 launch
vehicle, commencing with ignition of the first stage from
SLC-4E at Vandenberg Air Force Base (VAFB) and transporting
communications, remote sensing, or navigation class
payloads to low Earth orbit. Flight includes flyback of
the first stage booster for landing at Landing Zone 4 at
VAFB, landing on a droneship, or splashdown in the ocean
as
described in the application.
...
Authorization: SpaceX is authorized to conduct flights of
launch vehicles:
(a) Using a Falcon 9 launch vehicle;
(b) From Space Launch Complex 4E at Vandenberg Air Force
Base, California;
(c) On a flight azimuth between 173 and 209 degrees;
(d) Transporting a communications, remote sensing, or
navigation class payloads to low Earth orbit
; and
(e) According to the launch vehicle, launch vehicle
systems, and safety management program represented in
the SpaceX application as of the date of this order,
and any amendments to the license application
approved by the FAA, in writing.
...
4. Liability Insurance: SpaceX shall maintain a policy or
policies of liability insurance (or otherwise demonstrate
financial responsibility) in accordance with 14 C.F.R.
§ 440.9(b) in the amount of:
(a) Fifty Million Dollars ($50,000,000) for covered claims
resulting from flight of the Falcon 9 launch vehicle
from Vandenberg Air Force Base (VAFB), and
(b) Nine Million Dollars ($9,000,000) for covered claims
resulting from pre-flight operations performed at VAFB.
5. Government Property Insurance: SpaceX shall maintain a
policy or policies of insurance (or otherwise demonstrate
financial responsibility) in accordance with .14 C.F.R
§ 440.9(d) in the amount of:
(a) One Hundred Million Dollars ($100,000,000) for covered
claims resulting from flight of the Falcon 9 la-unch
vehicle from VAFB, and
(b) Two Million Dollars ($2,000,000) for covered claims
resulting from pre-flight operations performed at VAFB.


Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 3906
  • US
  • Liked: 3280
  • Likes Given: 1919
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #61 on: 10/15/2018 10:18 PM »
Mission 1376 from SLC-40 NET Dec. 8, 2018

That's the right time for GPS-III, which theoretically might not need these permits.

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 3906
  • US
  • Liked: 3280
  • Likes Given: 1919
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #62 on: 10/25/2018 04:28 AM »
PSN VI?  Is this DM-1?

1829-EX-ST-2018 Launch from 39A NET Dec. 10, 2018

1831-EX-ST-2018 ASDS Landing
North  31  43  23   West  76  58  47

Based on all of the other info we've seen recently on the SpaceX schedule I wouldn't expect this to actually launch in December.
« Last Edit: 10/25/2018 04:35 AM by gongora »

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17302
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 5721
  • Likes Given: 727
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #63 on: 10/25/2018 07:12 AM »
Maybe this is SpX-16. DM-1 has been delayed to January next year.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 3906
  • US
  • Liked: 3280
  • Likes Given: 1919
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #64 on: 10/25/2018 12:02 PM »
Maybe this is SpX-16. DM-1 has been delayed to January next year.

It's a NET date.

Offline NX-0

  • Full Member
  • *
  • Posts: 121
  • USA
  • Liked: 130
  • Likes Given: 192
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #65 on: 10/25/2018 12:14 PM »
Maybe this is SpX-16. DM-1 has been delayed to January next year.

Isn't SpX-16 going from 40?

Online Michael Baylor

  • Full Member
  • ****
  • Posts: 523
  • Liked: 1016
  • Likes Given: 539
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #66 on: 10/25/2018 02:27 PM »
Maybe this is SpX-16. DM-1 has been delayed to January next year.

Isn't SpX-16 going from 40?
And they already filed the CRS-16 paperwork. CRS-16 is an RTLS too as you would expect. Maybe for the crewed launches they need extra margin for abort and anomaly scenarios.
« Last Edit: 10/25/2018 02:30 PM by Michael Baylor »

Offline Raul

  • Full Member
  • **
  • Posts: 226
  • Ústí nad Orlicí, CZECH
  • Liked: 477
  • Likes Given: 33
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #67 on: 10/25/2018 06:49 PM »
Crew launches need especially flat trajectory, because of less G's on the crew during an eventual abort.
492km downrange distance for ASDS landing looks like flatter profile for LEO. Agree with DM-1.
« Last Edit: 10/25/2018 06:53 PM by Raul »

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 3906
  • US
  • Liked: 3280
  • Likes Given: 1919
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #68 on: 10/26/2018 07:12 PM »
PSN VI?  1844-EX-ST-2018
Quote
This STA is intended to cover pre-launch testing for a commercial payload on mission 1384. Tests involve fairing re-rad operations at pad 40 at Cape Canaveral AFS. This STA is not for flight.

Operation Start Date:   12/12/2018

Offline russianhalo117

  • Senior Member
  • *****
  • Posts: 4769
  • AR USA / Berlin, DE / Moscow, RF
  • Liked: 1223
  • Likes Given: 598
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #69 on: 10/26/2018 09:58 PM »
PSN VI?  1844-EX-ST-2018
Quote
This STA is intended to cover pre-launch testing for a commercial payload on mission 1384. Tests involve fairing re-rad operations at pad 40 at Cape Canaveral AFS. This STA is not for flight.

Operation Start Date:   12/12/2018
Re rad rings a bell regarding PSN VI and Es,hail as both have to re rad per FCC request.

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 3906
  • US
  • Liked: 3280
  • Likes Given: 1919
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #70 on: 11/02/2018 01:44 AM »
1877-EX-ST-2018
Iridium 8, there is also an ASDS recovery permit
« Last Edit: 11/02/2018 01:47 AM by gongora »

Offline Alexphysics

  • Full Member
  • **
  • Posts: 238
  • Spain
  • Liked: 168
  • Likes Given: 142
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #71 on: 11/06/2018 02:16 PM »
PSN VI?  1844-EX-ST-2018
Quote
This STA is intended to cover pre-launch testing for a commercial payload on mission 1384. Tests involve fairing re-rad operations at pad 40 at Cape Canaveral AFS. This STA is not for flight.

Operation Start Date:   12/12/2018

Looking at the correspondence, they talk about the SpaceIL lunar lander so yes, it seems this is for PSN VI

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 3906
  • US
  • Liked: 3280
  • Likes Given: 1919
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #72 on: 11/08/2018 02:02 AM »
ASDS landing NET Nov. 19 from Vandenberg.  I would guess SSO-A.
1907-EX-ST-2018
North  34  37  59   West  120  36  56

Offline lucas071200

  • Member
  • Posts: 15
  • Germany
  • Liked: 7
  • Likes Given: 26
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #73 on: 11/08/2018 04:57 AM »
How far will this be of the coast?

Gesendet von meinem Aquaris X2 mit Tapatalk


Offline Raul

  • Full Member
  • **
  • Posts: 226
  • Ústí nad Orlicí, CZECH
  • Liked: 477
  • Likes Given: 33
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #74 on: 11/08/2018 05:37 AM »
How far will this be of the coast?
Landing position is unfortunately unknown. ASDS coordinates point to LZ4 position, which is obviously another error in the FCC request.

Online Michael Baylor

  • Full Member
  • ****
  • Posts: 523
  • Liked: 1016
  • Likes Given: 539
« Last Edit: 11/08/2018 11:15 PM by Michael Baylor »

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 3906
  • US
  • Liked: 3280
  • Likes Given: 1919
Re: SpaceX Mission Paperwork (FCC/FAA/etc. permits/licenses)
« Reply #76 on: 11/20/2018 11:00 PM »
This isn't actually mission paperwork, but here are FCC updates/renewals for some of the SpaceX permits:

0248-EX-CM-2018 adds Boca Chica to the list of SpaceX launch related sites with transmitters
Boca Chica   Texas   North  25  29  27   West  97  10  55      1 Rocket Rd

1956-EX-ST-2018 renewal of McGregor testing permit for Falcon vehicles

Tags: