#100
by
Chris Bergin
on 09 Nov, 2006 16:02
-
STS 117 / OV104 / OPF 1
Orbiter power system testing in work
Lock bolt R&R in work
Chin panel fit check complete to date
Baseline Y inspections in work
WSB checkout and servicing in work
Integrated drag chute installation in work
NH3 servicing preps in work
Tile operations in work
Fuel cell 1 R&R in work
Thruster R4R R&R preps in work
Weekend SCAPE
-
#101
by
mainengine
on 09 Nov, 2006 17:45
-
shuttlefan - 8/11/2006 7:04 PM
Hi, Chris!! Have they installed the SSMEs on Atlantis yet ...
Hi Shuttlefan,
Installation of the SSMEs is planned to take place on December 5th.
-
#102
by
shuttlefan
on 09 Nov, 2006 17:50
-
mainengine - 9/11/2006 12:28 PM
shuttlefan - 8/11/2006 7:04 PM
Hi, Chris!! Have they installed the SSMEs on Atlantis yet ...
Hi Shuttlefan,
Installation of the SSMEs is planned to take place on December 5th.
Thanks Mainengine!!
-
#103
by
Shuttle Man
on 09 Nov, 2006 18:00
-
Might be slightly later.
-
#104
by
Chris Bergin
on 10 Nov, 2006 02:56
-
STS 117 / OV104 / OPF 1
Power is up through Sunday 1st shift
V5DO9 manifold drain and thruster removal and replacement preps in work
Ammonia servicing in work.
-
#105
by
Chris Bergin
on 13 Nov, 2006 23:08
-
STS 117 / OV104 / OPF 1
Orbiter power system testing in work
Lock bolt R&R in work
Chin panel fit check in work
Baseline Y inspections in work
WSB checkout and servicing in work
Integrated drag chute installation in work
NH3 servicing preps in work
Tiler operations in work
Fuel cell 1 installation complete
Mates in work
Thruster R&R R4R is complete to date. May continue today.
-
#106
by
Chris Bergin
on 15 Nov, 2006 01:24
-
STS 117 / OV104 / OPF 1
Power is up
Power up Wednesday 08:00
V5D09 APU ops in work
Fuel cell # 1 ops in work
-
#107
by
Chris Bergin
on 17 Nov, 2006 08:05
-
STS 117 / OV104 / OPF 1
Power is up
V1093 Single cell voltage test call to stations scheduled for 23:30
-
#108
by
Chris Bergin
on 17 Nov, 2006 21:04
-
STS 117 / OV104 / OPF 1
Orbiter powered up through second
Next power Monday 08:00
Manifold backfill operations in work
-
#109
by
nathan.moeller
on 20 Nov, 2006 16:33
-
Any reason a crawler is sitting outside the VAB? Is it just parked or is there something going on?
-
#110
by
nathan.moeller
on 20 Nov, 2006 16:33
-
Any reason a crawler is sitting outside the pad gate? Is it just parked or is there something going on?
EDIT: Sorry about the double post
-
#111
by
Jim
on 20 Nov, 2006 16:52
-
It always stays outside the of pad until it gets closer to launch
-
#112
by
nathan.moeller
on 20 Nov, 2006 16:52
-
Jim - 20/11/2006 11:35 AM
It always stays outside the of pad until it gets closer to launch
Good to know

Thanks Jim.
-
#113
by
shuttlefan
on 20 Nov, 2006 16:54
-
Anyone know when SRB stacking begins for 117?
-
#114
by
nathan.moeller
on 20 Nov, 2006 16:55
-
shuttlefan - 20/11/2006 11:37 AM
Anyone know when SRB stacking begins for 117? 
I heard it's already started.
-
#115
by
Chris Bergin
on 20 Nov, 2006 17:26
-
STS 117 / OV104 / OPF 1
Orbiter power system testing in work
Lockbolt R&R in work
Chin panel fit check in work benchwork
Baseline Y inspections in work
WSB checkout and servicing in work
Tile operations in work
Manifold backfill preps in work
Fuel cell single cell voltage test complete
PRSD system in work
MPS Delta P transducer removal preps in work
Star tracker R&R complete
-
#116
by
nathan.moeller
on 21 Nov, 2006 17:09
-
shuttlefan - 20/11/2006 11:37 AM
Anyone know when SRB stacking begins for 117? 
I was wrong. SRB stacking for STS-117 is scheduled to begin on December 4th. (More on L2)
-
#117
by
Chris Bergin
on 22 Nov, 2006 12:31
-
STS 117 / OV104 / OPF 1
Orbiter power system testing in work
Lockbolt R&R in work
Chin panel fit check in work
Baseline Y inspections in work
Tile operations in work
Manifold backfill in work
SCAPE
MPS Delta P transducer removal in work
-
#118
by
shuttlefan
on 22 Nov, 2006 12:47
-
nathan.moeller - 21/11/2006 11:52 AM
shuttlefan - 20/11/2006 11:37 AM
Anyone know when SRB stacking begins for 117? 
I was wrong. SRB stacking for STS-117 is scheduled to begin on December 4th. (More on L2)
thanks Nathan!!
-
#119
by
Chris Bergin
on 23 Nov, 2006 13:34
-
STS 117 / OV104 / OPF 1
Orbiter power system testing in work
OV104 scheduled to be powered down mid second shift tonight
Lockbolt R&R in work
Chin panel fit check in work
Baseline Y inspections in work
Tile operations in work
Manifold backfill SCAPE complete