Author Topic: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)  (Read 43662 times)

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19581
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7423
  • Likes Given: 993
Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #160 on: 09/22/2018 06:01 pm »
X+8 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19581
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7423
  • Likes Given: 993
Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #161 on: 09/22/2018 06:02 pm »
X+9 minutes. Stage is nominal.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19581
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7423
  • Likes Given: 993
Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #162 on: 09/22/2018 06:03 pm »
X+10 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19581
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7423
  • Likes Given: 993
Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #163 on: 09/22/2018 06:04 pm »
X+11 minutes. HTV-2 is on course.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19581
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7423
  • Likes Given: 993
Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #164 on: 09/22/2018 06:05 pm »
X+12 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19581
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7423
  • Likes Given: 993
Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #165 on: 09/22/2018 06:06 pm »
X+13 minutes. Guam now tracking the vehicle.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19581
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7423
  • Likes Given: 993
Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #166 on: 09/22/2018 06:07 pm »
X+14 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19581
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7423
  • Likes Given: 993
Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #167 on: 09/22/2018 06:08 pm »
SECO!
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19581
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7423
  • Likes Given: 993
Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #168 on: 09/22/2018 06:08 pm »
Separation!
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Chris Bergin

Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #169 on: 09/22/2018 06:08 pm »
S/C Sep!

S/C Sep for HTV-7 following launch on the Japanese H-IIB rocket! ISS crew sent phone notifications to say their delivery has been dispatched.

ARTICLE:
https://www.nasaspaceflight.com/2018/09/japan-cargo-space-station-test-new-recoverable-capsule/ - by Chris Gebhardt

Thanks to Steven and Blister for the updates!

Offline blister

Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #170 on: 09/22/2018 06:09 pm »
Separetion

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19581
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7423
  • Likes Given: 993
Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #171 on: 09/22/2018 06:09 pm »
Back to the launch pad.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline blister

Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #172 on: 09/22/2018 06:10 pm »
NVS Replay

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19581
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7423
  • Likes Given: 993
Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #173 on: 09/22/2018 06:11 pm »
Upcoming events.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19581
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7423
  • Likes Given: 993
Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #174 on: 09/22/2018 06:13 pm »
Interview with JAXA flight director.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline russianhalo117

  • Senior Member
  • *****
  • Posts: 5040
  • AR USA / Berlin, DE / Moscow, RF
  • Liked: 1384
  • Likes Given: 599
Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #175 on: 09/22/2018 06:13 pm »
2 more Standard HTV's and H-IIB's left before HTV-X and H-III take over ISS logistics duties.

Offline Chris Bergin

Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #176 on: 09/22/2018 06:13 pm »

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19581
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7423
  • Likes Given: 993
Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #177 on: 09/22/2018 06:15 pm »
Cool jacket!

Back to Tanegashima.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline blister

Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #178 on: 09/22/2018 06:16 pm »
NVS replay

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 19581
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 7423
  • Likes Given: 993
Re: H-IIB F-7 - HTV-7 - September 22, 2018 (17:52 UTC)
« Reply #179 on: 09/22/2018 06:17 pm »
On board footage.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Tags: