Author Topic: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)  (Read 45239 times)

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #200 on: 11/14/2018 10:37 AM »
T-2 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #201 on: 11/14/2018 10:38 AM »
T-1 minute.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #202 on: 11/14/2018 10:39 AM »
Liftoff!
« Last Edit: 11/14/2018 10:50 AM by Steven Pietrobon »
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.


Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #204 on: 11/14/2018 10:40 AM »
T+1 minute.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #205 on: 11/14/2018 10:41 AM »
T+2 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Chris Bergin

Booster sep.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #207 on: 11/14/2018 10:43 AM »
Booster separation.

T+3 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #208 on: 11/14/2018 10:43 AM »
Fairing separation.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #209 on: 11/14/2018 10:44 AM »
C25 ignition.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #210 on: 11/14/2018 10:46 AM »
T+7 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #211 on: 11/14/2018 10:47 AM »
T+8 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #212 on: 11/14/2018 10:48 AM »
T+9 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #213 on: 11/14/2018 10:49 AM »
T+10 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #214 on: 11/14/2018 10:50 AM »
T+11 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #215 on: 11/14/2018 10:51 AM »
T+12 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #216 on: 11/14/2018 10:52 AM »
T+13 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #217 on: 11/14/2018 10:53 AM »
T+14 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Chris Bergin

120 seconds to S/C Sep.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 17825
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 6077
  • Likes Given: 794
Re: GSLV MK-III D2 - GSAT-29 - November 14, 2018 (11:38 UTC)
« Reply #219 on: 11/14/2018 10:54 AM »
T+15 minutes. Performance nominal.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Tags: