Author Topic: SpaceX Manifest Updates Thread 5  (Read 808222 times)

Offline Jansen

  • Full Member
  • ****
  • Posts: 1997
  • Liked: 2234
  • Likes Given: 373
Re: SpaceX Manifest Updates Thread 5
« Reply #800 on: 11/19/2020 04:27 pm »
Updates:

Turksat 5B June 2021

NROL-85 NET June 2021 from SLC-40 to LEO

NROL-87 NET June 2021 VAFB to SSO

IM-1 mission/Nova-C lander scheduled October 11, 2021

IXPE scheduled launch date October 21, 2021.

New threads:

Starlink v1.0 L16
SXM-8
CRS-23
« Last Edit: 11/19/2020 11:36 pm by Jansen »

Offline Jansen

  • Full Member
  • ****
  • Posts: 1997
  • Liked: 2234
  • Likes Given: 373
Re: SpaceX Manifest Updates Thread 5
« Reply #801 on: 11/24/2020 06:18 pm »
Added CRS-24 & Transporter-3 threads
« Last Edit: 11/24/2020 06:31 pm by Jansen »

Offline Galactic Penguin SST

Re: SpaceX Manifest Updates Thread 5
« Reply #802 on: 11/26/2020 05:56 am »
SFN's article on Sentinel-6 mentions that F9 1st stage B1063 will be reserved for the launch of DART next July.
Astronomy & spaceflight geek penguin. In a relationship w/ Space Shuttle Discovery. Current Priority: Chasing the Chinese Spaceflight Wonder Egg & A Certain Chinese Mars Rover

Offline PM3

  • Full Member
  • ****
  • Posts: 1313
  • Germany
  • Liked: 1652
  • Likes Given: 1088
Re: SpaceX Manifest Updates Thread 5
« Reply #803 on: 12/01/2020 08:25 am »
Quote
2022-Q4   H   .   .   USSF-67   .   .   .   .

Q4 fiscal year 2022 = Q3 2022

https://arstechnica.com/science/2020/08/the-air-force-selects-ula-and-spacex-for-mid-2020s-launches/
"Never, never be afraid of the truth." -- Jim Bridenstine

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31138
  • UK
    • Plan 28
  • Liked: 55569
  • Likes Given: 25094
Re: SpaceX Manifest Updates Thread 5
« Reply #804 on: 12/06/2020 07:14 pm »
https://twitter.com/stephenclark1/status/1335678224253263876

Quote
NASA says SpaceX is now on the hook for nine CRS-2 missions, three more than the guaranteed minimum of six.

Offline Elthiryel

  • Full Member
  • ****
  • Posts: 409
  • Kraków, Poland
  • Liked: 936
  • Likes Given: 10784
Re: SpaceX Manifest Updates Thread 5
« Reply #805 on: 12/29/2020 12:07 pm »
According to the Ben Cooper’s website, SpaceX is now planning two Starlink missions for January and at least one for February. There is no indication if or how any of them may correspond to these “Starlink RF” missions, Ben just calls them “seventeenth”, “eighteenth” and “nineteenth”, respectively.
GO for launch, GO for age of reflight

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 9196
  • US
  • Liked: 11571
  • Likes Given: 5175
Re: SpaceX Manifest Updates Thread 5
« Reply #806 on: 12/30/2020 10:34 pm »
Year end snapshot
SpaceX manifest updates. The best guess at the current manifest is in this post.
There is a corresponding Discussion Thread to talk about the manifest.

The first four posts in this thread are maintained
1 - Current manifest and some links
2 - Past launches
3 - Smoliarm's graphical manifest
4 - links

Discussion of the table format should be done here: SpaceX Manifest Table Format Discussion
Prior thread: SpaceX Manifest Updates and Discussion Thread 4

Date: *=Local date differs from UTC date  ~=Date has some uncertainty
Return: L=Land,S=Sea,X=Expendable,N/A=Not Applicable
Launch Vehicle: F9=Falcon 9, H=Falcon Heavy, F=Falcon 9 or Heavy, SS=Starship
Core: *=FH core numbers in footnotes, N=New, R=Reused
Payload(s): (R) = Rideshare
Mission: Blue number indicates additional information in footnotes.
Colors: Successful / Unsuccessful / Mars / Moon / Footnotes / Launch success/payload failure

Sites:
      C=Cape Canaveral Spaceport (KSC/CCAFS) (UTC-4 EDT,UTC-5 EST)
            CCAFS SLC-40: Active for Falcon 9
            KSC LC-39A: Active for Falcon 9 and Falcon Heavy
      V=Vandenberg (UTC-7 PDT,UTC-8 PST)
            SLC-4E: Active for Falcon 9
      B=Boca Chica (UTC-5 CDT,UTC-6 CST)
            Site preparation work underway

U.S. daylight saving time starts second Sunday in March, ends first Sunday in November, time changes at 2:00 a.m. local time

Note on F9 Mission numbers:  I counted AMOS-6 (lost in pre-launch testing) and did not count IFA (suborbital test flight).

       Local        LV  Core   Ret- .                             .    Mass   .     Mis-
Est. Date,  Time/UTC.   S/N    urn  Payload(s)                    Orb  (kg)   Site sion
------------------- .--- ------ .---  ----------------------------  --- .-----  -----  ----
2020-01-06*2119/-5F91049.4SStarlink v1.0 L2LEO~16kC-4079
2020-01-19  1030/-5F91046.4XCCiCap In-Flight Abort TestSUB.C-39AN/A
2020-01-29  0906/-5F91051.3SStarlink v1.0 L3LEO~16kC-4080
2020-02-17  1005/-5F91056.4SStarlink v1.0 L4LEO~16kC-4081
2020-03-06*2350/-5F91059.2LCRS SpX-20LEO~10kC-4082
2020-03-18  0816/-4F91048.5SStarlink v1.0 L5LEO~16kC-39A83
2020-04-22  1530/-4F91051.4SStarlink v1.0 L6LEO~16kC-39A84
2020-05-30  1522/-4F91058SCCtCap DM2 (Crew)LEO.C-39A85
2020-06-03*2125/-4F91049.5SStarlink v1.0 L7LEO~16kC-4086
2020-06-13  0521/-4F91059.3SStarlink v1.0 L8 (R)LEO~16kC-4087
2020-06-30  1610/-4F91060SGPS III-3MEO4311C-4088
2020-07-20  1730/-4F91058.2SANASIS-IIGTO.C-4089
2020-08-07  0112/-4F91051.5SStarlink v1.0 L9 (R)LEO~16kC-39A90
2020-08-18  1031/-4F91049.6SStarlink v1.0 L10 (R)LEO~16kC-4091
2020-08-30  1919/-4F91059.4LSAOCOM 1B (R)SSO3k+?C-4092
2020-09-03  0846/-4F91060.2SStarlink v1.0 L11LEO~16kC-39A93
2020-10-06  0729/-4F91058.3SStarlink v1.0 L12LEO~16kC-39A94
2020-10-18  0825/-4F91051.6SStarlink v1.0 L13LEO~16kC-39A95
2020-10-24  1131/-4F91060.3SStarlink v1.0 L14LEO~16kC-4096
2020-11-05  1824/-5F91062SGPS III-4MEO4400C-4097
2020-11-15*1927/-5F91061SCCtCap Crew-1LEO.C-39A98
2020-11-21  0917/-8F91063LSentinel-6 Michael FreilichLEO1440V-4E99
2020-11-24*2113/-5F91049.7SStarlink v1.0 L15LEO~16kC-40100
2020-12-06  1117/-5F91058.4SCRS2 SpX-21LEO~10kC-39A101
2020-12-13  1230/-5F91051.7SSiriusXM SXM-7GTO~7kC-40.
2020-12-19  0900/-5F91059.5LNROL-108LEO.C-39A.
------------------- --- ------ ---  ----------------------------  ---  -----  ----- ----
2021-01-04*2027/-5F91060.4STürksat 5AGTO3500C-40.
2021-01-14 (NET)F9.SSpaceX Transporter-1SSO.C .
2021-01F9.SStarlink v1.0 L16LEO~16kC.
2021-01 (NET)F9.SStarlink v1.0 L17LEO~16kC.
2021-02F9.SStarlink v1.0 L18LEO~16kC.
2021F9.SStarlink v1.0 L19LEO~16kC.
2021F9.SStarlink v1.0 L20LEO~16kC.
2021F9.SStarlink v1.0 L21LEO~16kC.
2021-Q1F9.SSiriusXM SXM-8GTO>5400C.
2021-03-30 (NET)F91061.2SCCtCap Crew-2LEO.C-39A.
2021F9..SARah 1SSO~2200V-4E.
2021 late springHNNN?X?USSF-44GEO.C-39A(H4)
2021-05F9.SCRS2 SpX-22LEO.C.
2021-06F9.STürksat 5BGTO4500C.
2021-06F9..SpaceX Transporter-2SSO.C/V .
2021HN.USSF-52GTO.C-39A(H5)
2021-Q3F9..O3B mPOWER 1-3MEO~5kC(130)
2021F9..SARah 2/3SSO~3600V-4E .
2021-07F91062.2SGPS III-5MEO4400C
2021-07-21F9R.DARTESC~500V-4E.
2021-09F9..CRS2 SpX-23LEO.C.
2021-H2F9N.NROL-85LEO?C .
2021-09F9R.WorldView Legion flight 1LEO.V.
2021-09F910xx.xSCCtCap Crew-3LEO.C-39A.
2021-H2F9N.NROL-87SSO?V-4E .
2021-10F9..Intuitive Machines (R).?C-39A .
2021-11-20 (NET)F9R.IXPELEO337C-39A.
2021-11F9..CRS2 SpX-24LEO.C.
2021-12F9..SpaceX Transporter-3SSO.C/V .
2021-late (NET)F9R.WorldView Legion flight 2LEO.C.
2021-late (NET)F9..Axiom AX-1 (crewed)LEO.C-39A.
2021-late (NET)F9.SSpace Adventures DragonLEO.C-39A.
2021F9RSGPS III-6MEO4400C
2022-earlyF9..Nilesat-301GTO4100C-40.
2022-Q1F9..O3B mPOWER 4-6MEO~7kC(130)
2022-03F9..SWOTLEO2000V-4E.
2022-04F9..CRS2 SpX-25LEO.C.
2022F9..SES-18 / SES-19GTO.C.
2022-Q3F9..Galaxy 31/32GTO.C.
2022-Q3F9..Galaxy 33/34GTO.C.
2022-Q3F9R.Intelsat 40e with TEMPOGTO.C.
2022-07 (NET)HN.PsycheESC.C-39A(H7)
2022-09F9..CRS2 SpX-26LEO.C.
2022-Q3H..USSF-67....
2022-H2F9..O3B mPOWER 7-9MEO~7kC(130)
2022-lateF9..Space NorwayHEO4kV .
2022-08F9..Korea Pathfinder Lunar Orbiter?678C(150)
2022-12...Masten MM1 (R?)?.C.
2023-04F9R.PACESSO1700C-40.
2023-Q4F9..SatriaGTO.C.
2023 (NET)SS..#dearMoonTLI.?.
2024SS..MarsTMI.?.
2024-H2F9..O3B mPOWER 10-11MEO~7kC(130)
2025-02F9..IMAPESC~500C-40.
TBD (2020-2024)F9..Commercial Crew (5 flights)LEO.C-39A.
2020F9..Starlink Deployment (up to 24)LEO.C.
2021+...Starlink Deployment (many)LEO.C/V.
2020+F9..SSO Rideshares (several/year)SSO.V.
TBD (2021-2024)F9..CRS-2 (4+ flights)LEO.C.
TBD (2021-2022)H..one of the ViaSat 3 satsGEO6400C-39A(H6)

NOTES:
(H4) USSF-44 - Serial Numbers:  Side1:10xx.1  Center:10xx.1  Side2: 10xx.1
(H5) USSF-52 - Serial Numbers:  Side1:10xx.1  Center:10xx.1  Side2: 10xx.1
(H6) Viasat 3 - Serial Numbers:  Side1:10xx.1  Center:10xx.1  Side2: 10xx.1
(H7) Psyche - Serial Numbers:  Side1:10xx.1  Center:10xx.1  Side2: 10xx.1
(120) Intersputnik NationSat & co-passenger NET 2020
(130) 2 flights for O3B mPOWER in 2021
(150) Korea Pathfinder Lunar Orbiter : Post

Companies that appear to have launch contracts for unspecified payloads:
Eutelsat, Inmarsat, Bigelow

Rideshare Program Thread
Rideshare payloads (which flight it's on may not be known yet)
       Local        LV  .                             .    Mass   .     
Est. Date,  Time/UTC.   Payload(s)                    Orb  (kg)   Site
-------------------  --- .----------------------------  --- .-----  ----- 
2020-Q4F9Kepler (2 flights)SSO?..
2020-12F9ELaNa 35 (on Transporter 1)LEO.C
2020-lateF9NanoRacks (8x Lemur-2 + Mfg Demo)...
2020-12F9Momentus/AuroraSSO..
2021-02F9Feb Apr? 2021 RideshareLEO..
2021F9Astranis 2021-midGTO..
2022F9ispace HAKUTO-R...


Possible future payloads:

Competitions for future payloads:
Air Force

Canceled payloads: ABS-8, AMOS-8, GiSat-1, PTScientists, Ovzon-3, Bigelow Tourism to ISS

L2 notes on manifest:

Upcoming Mars Launch Windows: 2020-06, 2022-08, 2024-09, 2026-11, 2029-01

SpaceX Mission Paperwork / Raul's Map
Starlink Index Thread / Commercial Space Index Thread
L2 SpaceX CRS External Cargo
L2 Level SpaceX Falcon 9 Stage Watch / Public Core Spotting
SpaceX Launch Log (past launches) / Wikipedia Falcon Launches
Viewing flights from Vandenberg / Ben Cooper's Viewing Guide for Cape Canaveral / Viewing Flights from KSC/CCAFS
Upcoming SpaceX Talks / General Industry Talks
SpaceX Falcon Mission Simulations
SpaceX Eastern Range Landing Facilities
NSF Manifest Threads: U.S. / Russian / Arianespace / Japanese / Chinese / Indian / Rocket Lab / Consolidated

Recent Edits:
Nov 30  Moved IMAP from Oct 2024 to early 2025
Nov 5  Worldview Legion delayed until September 2021
Sep 25 Added IMAP.  Moved GPS III-5 to July 2021.  Added GPS III-6.
Sep 17  Added Galaxy 31/32, Galaxy 33/34 in Q3 2022
Sep 8  Moved USSF-44 to Feb 2021.  Added Crew-3 Sep 2021
Sep 6  Moved SpX-21 to Nov 15
Sep 3  Added Satria in 2023
Aug 20  Added O3B mPOWER 7-9 and O3B mPOWER 10-11 flights
Aug 7  Added USSF-67 (details unknown) in Q4-2022
Aug 5  Added SES-18/SES-19 in 2022
Jul 21  Removed NationSat, I'm not sure if that's actually on contract
Jul 2  Moved IXPE to 2021-H2
May 19  Moved IXPE to 2021-05, SWOT to 2022-03
May 13  Moved KPLO to Dec. 2022 (slide at NAC HEO meeting)
May 7  Removed PPE, that does not seem to be a firm contract
May 1  Added PPE, Moved SXM-7 to early August
Mar 17  Added Intelsat 40e
Mar 5  Added Axiom Crewed Flight NET H2-2021
Feb 28  Added Psyche in 2022
Feb 18  Added Space Adventures Dragon flight
Feb 4  Added PACE
Jan 23 2020  Added Nilesat-301
December  Added rideshare payload table.  Added Capella, SkySat, Kepler rideshare payloads.  Removed Bigelow tourism flights.  Slipped dates for NationSat, GPS launches.
Nov 5  Moved SXM-7 to mid 2020, SXM-8 to Q3 2020
October 9  Added Intersputnik NationSat & co-passenger NET 2020.  Changed SAOCOM-1B from Vandenberg to Florida launch site.


All comments and updates are welcomed!  Thank you to all contributors!

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 9196
  • US
  • Liked: 11571
  • Likes Given: 5175
Re: SpaceX Manifest Updates Thread 5
« Reply #807 on: 12/31/2020 10:11 pm »
SPACE DEVELOPMENT AGENCY

Space Exploration Technologies Inc. (SpaceX), Hawthorne, California, has been awarded a $150,450,000 firm-fixed-price contract for launch services from Vandenberg Air Force Base for the Space Development Agency's Tranche 0 Transport and Tracking Layer space vehicles. This award was made based on the Tranche 0 Launch request for proposal (HQ085021R0001) released Oct. 6, 2020, to which responses were due Nov. 9, 2020. SpaceX will provide standalone launch services via two launches, with the first launch occurring in September 2022, and the entire constellation on orbit no later than March 31, 2023. Work will be performed in Hawthorne, California; Vandenberg AFB, California; and McGregor, Texas. Fiscal 2020 and 2021 defense-wide research, development, test and evaluation funds will be obligated at the time of award. The Space Development Agency, Washington, D.C., is the contracting activity (HQ085021C0005).

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31138
  • UK
    • Plan 28
  • Liked: 55569
  • Likes Given: 25094
Re: SpaceX Manifest Updates Thread 5
« Reply #808 on: 01/13/2021 01:33 pm »
https://twitter.com/sciguyspace/status/1349361110135222272

Quote
The Environmental Defense Fund says its Earth observing MethaneSat will launch on a Falcon 9 rocket in October, 2022. The satellite and its launch will largely be paid for by a $100 million grant from the Bezos Earth Fund.

Online Rekt1971

  • Full Member
  • *
  • Posts: 116
  • Liked: 304
  • Likes Given: 1157
Re: SpaceX Manifest Updates Thread 5
« Reply #809 on: 01/13/2021 02:32 pm »
Quote
We have selected SpaceX Falcon 9 Rocket for our second Moon mission launching no earlier than 2022.

https://twitter.com/Int_Machines/status/1349365427605016578

Offline Elthiryel

  • Full Member
  • ****
  • Posts: 409
  • Kraków, Poland
  • Liked: 936
  • Likes Given: 10784
Re: SpaceX Manifest Updates Thread 5
« Reply #810 on: 01/13/2021 10:48 pm »
Ben Cooper has updated his website:
Quote
(...) A Falcon 9 will launch the eighteenth Starlink batch on January TBD. Other upcoming launches include multiple Starlink missions in a row through January and February.

This isn't totally unexpected, as there are no other missions from Florida planned at least until March (SXM-8 and Crew-2), but it seems like we can really see a lot of Starlink missions in a row.
« Last Edit: 01/13/2021 10:48 pm by Elthiryel »
GO for launch, GO for age of reflight

Offline GWR64

  • Full Member
  • ****
  • Posts: 1444
  • Germany
  • Liked: 1219
  • Likes Given: 779
Re: SpaceX Manifest Updates Thread 5
« Reply #811 on: 01/14/2021 08:36 pm »
Quote
Name                      Manufacturer                            Launch Company and Planned Date*

I-6 F1** (GX6A)      Airbus Defence & Space             Mitsubishi Heavy Industries (MHI) / 2021

I-6 F2** (GX6B)     Airbus Defence & Space            SpaceX / 2022

https://www.inmarsat.com/en/news/latest-news/corporate/2021/inmarsat-marks-five-years-of-global-xpress-worldwide-service-and.html

Offline Norm38

  • Full Member
  • ****
  • Posts: 1679
  • Liked: 1257
  • Likes Given: 2282

Offline vaporcobra

  • Senior Member
  • *****
  • Posts: 2433
  • Tacoma, WA
  • Liked: 7560
  • Likes Given: 8702
Re: SpaceX Manifest Updates Thread 5
« Reply #813 on: 01/20/2021 08:55 pm »
Worth noting that Ben Cooper's schedule now shows Starlink-18 as firmly NET February, whereas previously it was January or February.

http://www.launchphotography.com/Delta_4_Atlas_5_Falcon_9_Launch_Viewing.html

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31138
  • UK
    • Plan 28
  • Liked: 55569
  • Likes Given: 25094
Re: SpaceX Manifest Updates Thread 5
« Reply #814 on: 02/01/2021 08:09 pm »
https://twitter.com/sciguyspace/status/1356348663921074179

Quote
Per an NBC news release, SpaceX is about to announce that tech entrepreneur Jared Isaacman will lead the first all-civilian space mission. This four person mission on Crew Dragon will be named  Inspiration4.

Edit to add:

https://twitter.com/nasaspaceflight/status/1356348723010396161

Started specific thread now press release is out:

https://forum.nasaspaceflight.com/index.php?topic=52958.0
« Last Edit: 02/01/2021 08:17 pm by FutureSpaceTourist »

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31138
  • UK
    • Plan 28
  • Liked: 55569
  • Likes Given: 25094
Re: SpaceX Manifest Updates Thread 5
« Reply #815 on: 02/09/2021 04:23 pm »
https://twitter.com/thesheetztweetz/status/1359190791546171394

Quote
In a SmallSat Symposium session, Jarrod McLachlan of SpaceX says they have two more dedicated rideshare launches, Transporter-2 and -3, scheduled for later this year. No estimate on # of satellites on each, but he said demand is “strong and growing.”

Offline Eagandale4114

  • Full Member
  • **
  • Posts: 274
  • Liked: 478
  • Likes Given: 454
Re: SpaceX Manifest Updates Thread 5
« Reply #816 on: 02/09/2021 08:53 pm »
Falcon Heavy will launch the Power and Propulsion Element and Habitation and Logistics outpost for the lunar gateway in 2024 in a single launch.

https://www.nasa.gov/press-release/nasa-awards-contract-to-launch-initial-elements-for-lunar-outpost
« Last Edit: 02/09/2021 08:55 pm by Eagandale4114 »

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31138
  • UK
    • Plan 28
  • Liked: 55569
  • Likes Given: 25094
Re: SpaceX Manifest Updates Thread 5
« Reply #817 on: 02/17/2021 12:27 am »
twitter.com/nextspaceflight/status/1361848375713296385

Quote
Commercial Crew tentative schedule, per latest NASA planning document. Note that these schedules are fairly fluid.

2021:
- OFT 2 - 3/25
- Crew 2 - 4/20
- Crew 1 Return - 5/1
- Crew 3 - 9/13
- Crew 2 Return - 9/27
- CFT - September

https://sma.nasa.gov/docs/default-source/sma-disciplines-and-programs/smsr/smsr-intergrated-master-schedule_24feb2020aab4a269d2a865b9a1a0ff0f003ca228.pdf?sfvrsn=8290faf8_18

https://twitter.com/nextspaceflight/status/1361848376568868868

Quote
2022:
- Crew 4 - 2/4
- Starliner 1 - 2/24 (Obviously, only Crew-4 or Starliner-1 will happen in this timeframe)
- Starliner-2 - 4/21
- Crew 5 - 8/15
- Starliner 3 - 12/14

2023:
- Crew 6 - 2/1

The schedule ends here, but more Starliner launches likely in 2023.

Offline PM3

  • Full Member
  • ****
  • Posts: 1313
  • Germany
  • Liked: 1652
  • Likes Given: 1088
Re: SpaceX Manifest Updates Thread 5
« Reply #818 on: 02/26/2021 09:37 am »
New dates from Glenn Research Center:

SpX-22 slips from May to June 2021
SpX-24 slips from November to December 2021
SpX-25 slips from March to April 2022

The new date for SpX-24 was already published some weeks ago.

https://www1.grc.nasa.gov/space/iss-research/microgravity-research-flights/
"Never, never be afraid of the truth." -- Jim Bridenstine

Offline soltasto

  • Full Member
  • ****
  • Posts: 575
  • Italy, Earth
  • Liked: 938
  • Likes Given: 40
Re: SpaceX Manifest Updates Thread 5
« Reply #819 on: 03/09/2021 09:28 pm »
https://www.defense.gov/Newsroom/Contracts/Contract/Article/2530911/
Quote
Space Exploration Technologies Corp., Hawthorne, California, has been awarded two individual firm-fixed-price task orders totaling $159,721,445 under the National Security Space Launch Phase 2 contract.  These task orders provide the basic launch services and mission integration for USSF-36 and NROL-69.  Work will be performed in Hawthorne, California; Vandenberg Air Force Base, California; and Cape Canaveral Air Force Station, Florida, and is expected to be completed by the fourth quarter of fiscal 2023. Fiscal 2021 missile and space procurement funds in the full amount are being obligated at the time of award.  The Space and Missile Systems Center, Los Angeles Air Force Base, California, is the contracting activity (FA8811-21-F-0009 and FA8811-21-F-0010).

Tags:
 

Advertisement NovaTech
Advertisement SkyTale Software GmbH
Advertisement Northrop Grumman
Advertisement
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1