-
#160
by
ChrisGebhardt
on 04 Jul, 2017 00:15
-
All RP-1 and LOX load parameters continue to perform per the auto sequence script.
-
#161
by
Steven Pietrobon
on 04 Jul, 2017 00:15
-
T-20 minutes. Can also just see venting from the top of the second stage.
-
#162
by
ChrisGebhardt
on 04 Jul, 2017 00:18
-
Stage 1 LOX load in programmed "hold" ahead of final fill sequence in the final minutes of the count.
-
#163
by
Steven Pietrobon
on 04 Jul, 2017 00:20
-
-
#164
by
cppetrie
on 04 Jul, 2017 00:21
-
Go for funky music!
-
#165
by
Steven Pietrobon
on 04 Jul, 2017 00:21
-
Some mellow funky music to start the day.
-
#166
by
docmordrid
on 04 Jul, 2017 00:25
-
Go for webcast
-
#167
by
ChrisGebhardt
on 04 Jul, 2017 00:25
-
T-10mins and COUNTING.
All proceeding well.
-
#168
by
Steven Pietrobon
on 04 Jul, 2017 00:26
-
-
#169
by
Steven Pietrobon
on 04 Jul, 2017 00:26
-
T-8 minutes 58 seconds. Dragon has landed.
-
#170
by
ChrisGebhardt
on 04 Jul, 2017 00:27
-
MVac and M1D pressures stepping up.
-
#171
by
Steven Pietrobon
on 04 Jul, 2017 00:27
-
-
#172
by
ChrisGebhardt
on 04 Jul, 2017 00:28
-
LD loop: Stage 1 fueling prepping for closeout topping.
-
#173
by
ChrisGebhardt
on 04 Jul, 2017 00:28
-
MVac and M1D in chill down.
-
#174
by
Craftyatom
on 04 Jul, 2017 00:28
-
Webcast footage wide enough to have the VAB in the background.
-
#175
by
Steven Pietrobon
on 04 Jul, 2017 00:28
-
-
#176
by
ChrisGebhardt
on 04 Jul, 2017 00:28
-
MVac and M1D hydraulics at full pressure.
-
#177
by
ChrisGebhardt
on 04 Jul, 2017 00:28
-
Stage 1 fuel secured.
-
#178
by
Chris Bergin
on 04 Jul, 2017 00:29
-
Auto abort yesterday was out of family guidance data. Was actually OK, it was a ground system which has since been corrected.
-
#179
by
ChrisGebhardt
on 04 Jul, 2017 00:29
-
Vehicle is in self-align