-
#140
by
ChrisGebhardt
on 03 Jul, 2017 23:35
-
RP-1 fueling has started.
Launch auto sequence has started.
-
#141
by
Steven Pietrobon
on 03 Jul, 2017 23:35
-
T-1 hour. Fueling should be starting now.
-
#142
by
ChrisGebhardt
on 03 Jul, 2017 23:44
-
10mins into prop load. All is quiet on the LD loop.
-
#143
by
Steven Pietrobon
on 03 Jul, 2017 23:45
-
T-50 minutes. Haven't seen any small vents like we did yesterday.
-
#144
by
Steven Pietrobon
on 03 Jul, 2017 23:49
-
Sun's out and helicopter flying by.
-
#145
by
ChrisGebhardt
on 03 Jul, 2017 23:50
-
RP-1 fueling is progressing per the timeline and auto sequence script.
10mins to start of LOX load.
-
#146
by
Scotty
on 03 Jul, 2017 23:51
-
Weather in the area is clearing, with no rain on Merritt Island at this time.
Things are looking better.
-
#147
by
ChrisGebhardt
on 03 Jul, 2017 23:54
-
Sat is switching to internal power at this time.
-
#148
by
ChrisGebhardt
on 03 Jul, 2017 23:55
-
5mins to start of LOX load.
-
#149
by
Steven Pietrobon
on 03 Jul, 2017 23:56
-
T-40 minutes. SpaceflightNow reports that the spacecraft is being switched to internal power.
-
#150
by
ChrisGebhardt
on 03 Jul, 2017 23:58
-
LD is asking his team for any issues that would constrain the start of LOX load.
-
#151
by
ChrisGebhardt
on 03 Jul, 2017 23:59
-
LD is asking his team for any issues that would constrain the start of LOX load.
There are none reported.
-
#152
by
ChrisGebhardt
on 04 Jul, 2017 00:00
-
LOX load has started!
-
#153
by
ChrisGebhardt
on 04 Jul, 2017 00:00
-
IntelSat 35e verified to be on internal.
-
#154
by
Steven Pietrobon
on 04 Jul, 2017 00:00
-
T-35 minutes. LOX loading should be starting now.
-
#155
by
Steven Pietrobon
on 04 Jul, 2017 00:05
-
-
#156
by
ChrisGebhardt
on 04 Jul, 2017 00:07
-
LOX load and RP-1 load are both progressing nominally per the timeline and the auto sequence script.
-
#157
by
Steven Pietrobon
on 04 Jul, 2017 00:10
-
-
#158
by
Steven Pietrobon
on 04 Jul, 2017 00:14
-
-
#159
by
bsegal
on 04 Jul, 2017 00:14
-
Big venting now visible