-
#160
by
Olaf
on 09 Jun, 2017 14:40
-
https://blogs.nasa.gov/stationreport/2017/06/08/Yesterday and overnight, Robotic Ground Controllers powered up the MSS cameras and lights and walked the Space Station Remote Manipulator System (SSRMS) off the Node2 Power Data Grapple Fixture (PDGF) onto Mobile Base System (MBS) PDGF1. They then translated the Mobile Transporter (MT) from Worksite 6 (WS6) to WS2. Finally the Robotics Ground Controllers unstowed the Special Purpose Dexterous Manipulator (SPDM) from MBS PDGF2. The SPDM is holding the Multiple User System for Earth Sensing (MUSES) payload on the Enhanced Orbital Replacement Unit (ORU) Temporary Platform (EOTP) which will be installed later today on Express Logistic Carrier 4 (ELC4).
-
#161
by
centaurinasa
on 09 Jun, 2017 16:55
-
-
#162
by
Olaf
on 10 Jun, 2017 15:20
-
https://twitter.com/ISS101/status/873534732402864128The Space Station's robots have been quite busy lately, here's them installing the MUSES Earth-Sensing Platform
Dragon SpX-11 Robotics Part 1 - MUSES Installation
Time lapse of robotic work completed June 6 through June 10 outside the International Space Station to extract the Multi-User System for Earth Sensing (MUSES...
youtube.com
-
#163
by
centaurinasa
on 11 Jun, 2017 08:02
-
... Dragon SpX-11 Robotics Part 1 - MUSES Installation
Time lapse of robotic work completed June 6 through June 10 outside the International Space Station to extract the Multi-User System for Earth Sensing (MUSES...
youtube.com
-
#164
by
Olaf
on 11 Jun, 2017 09:30
-
https://www.nasa.gov/nicerNICER Post-Launch Timeline
June 11, 2017: NICER is extracted from the SpaceX Dragon spacecraft trunk.
June 12-13: NICER is installed on the International Space Station at ELC2.
June 14: NICER is powered up and deployed. NICER’s range of motion is verified by robotic camera.
June 15: NICER executes initial pointing control test and detector initial checkout.
June 17: NICER uses raster scan of Serpens X-1 to determine X-ray instrument and star tracker alignment.
June 21-July 12: Initial calibration and hardware commissioning.
July 13: Begin NICER science program.
-
#165
by
centaurinasa
on 11 Jun, 2017 09:42
-
https://www.nasa.gov/nicer
NICER Post-Launch Timeline
...June 12-13: NICER is installed on the International Space Station at ELC2...
-
#166
by
centaurinasa
on 11 Jun, 2017 22:56
-
-
#167
by
centaurinasa
on 11 Jun, 2017 23:13
-
-
#168
by
centaurinasa
on 11 Jun, 2017 23:24
-
-
#169
by
centaurinasa
on 11 Jun, 2017 23:45
-
-
#170
by
Olaf
on 12 Jun, 2017 10:08
-
-
#171
by
centaurinasa
on 12 Jun, 2017 10:09
-
-
#172
by
centaurinasa
on 12 Jun, 2017 10:10
-
-
#173
by
centaurinasa
on 12 Jun, 2017 10:14
-
-
#174
by
centaurinasa
on 12 Jun, 2017 10:28
-
NICER on EOTP ("Enhanced ORU Temporary Platform")
-
#175
by
centaurinasa
on 12 Jun, 2017 10:28
-
-
#176
by
centaurinasa
on 12 Jun, 2017 10:33
-
NICER installed on MBS...
-
#177
by
centaurinasa
on 12 Jun, 2017 11:16
-
-
#178
by
centaurinasa
on 12 Jun, 2017 11:30
-
-
#179
by
centaurinasa
on 12 Jun, 2017 21:24
-