Peggy: "leak check complete"
-
#121
by
centaurinasa
on 05 Jun, 2017 19:01
-
Capcom: "Go for ingress procedure"
-
#122
by
centaurinasa
on 05 Jun, 2017 19:23
-
Here a summary of the ingress procedure:
Once the Harmony Hatch is open:
- Vestibule Outfitting: Installation of air ducts and removal of equipment needed to bolt Dragon in Place.
- Removing MLI ("multi-layer insulation") from the hatchway and 2fish and set up of the tools for the procedure.
- Before openning Dragon's Hatch ,the 4 CPA ("Control Panel Assemblies") are removed and Dragon is connected to ISS Data and Power Systems via redundant jumpers.
- Once the two Hatches are open, wearing protective mask and glasses, the crew perform Air Sampling as part of initial ingress operations and they inspect the interior of the capsule for any damage or FOD ("Foreign Object Debris").
- Then, the air inside Dragon is assessed, before MCC-H gives a GO for Dragon ingress.
-
#123
by
centaurinasa
on 05 Jun, 2017 19:32
-
-
#124
by
centaurinasa
on 05 Jun, 2017 19:36
-
Comparison of Hatch Sizes between russian model (left) and CBM (right)
-
#125
by
centaurinasa
on 05 Jun, 2017 19:49
-
Jumper installation complete and GO for CPA removal...
-
#126
by
Wolfram66
on 05 Jun, 2017 19:52
-
Comparison of Hatch Sizes between russian model (left) and CBM (right)
What is the comparison with the opening to be used with PDA-2/3 moved to accommodate Crewed Commercial capsules? how will that effect CRS-2 cargo shipments?
-
#127
by
centaurinasa
on 05 Jun, 2017 20:10
-
Peggy: "CPAs are removed"
-
#128
by
centaurinasa
on 05 Jun, 2017 20:35
-
What is the comparison with the opening to be used with PMA-2/3 moved to accommodate Crewed Commercial capsules?
...
It seems (To check ...) that the internal passageway diameter of IDA is the same of russian: 0.80 meter (31 inches)
-
#129
by
centaurinasa
on 05 Jun, 2017 20:38
-
Capcom: "GO for step 5: vestibule config for ingress"
-
#130
by
centaurinasa
on 05 Jun, 2017 21:07
-
Waiting for Dragon's Hatch openning.....
(image from previous flight...)
-
#131
by
centaurinasa
on 05 Jun, 2017 21:28
-
very quiet on the loop...
-
#132
by
centaurinasa
on 05 Jun, 2017 21:35
-
MCC-H: "go for donning goggles and mask "
-
#133
by
centaurinasa
on 05 Jun, 2017 21:41
-
DRAGON's Hatch is OPEN !
-
#134
by
centaurinasa
on 05 Jun, 2017 21:41
-
some congrats from MCC...
-
#135
by
centaurinasa
on 05 Jun, 2017 21:44
-
As Rob Navias say: "That conclude the event !"
-
#136
by
centaurinasa
on 05 Jun, 2017 21:46
-
Peggy report no FOD and temperature condition is perfect !
-
#137
by
centaurinasa
on 05 Jun, 2017 21:48
-
Air Sampling ...
-
#138
by
Chris Bergin
on 05 Jun, 2017 21:58
-
Great work centaurinasa!
And a Jack photo from today:
-
#139
by
Kansan52
on 05 Jun, 2017 22:07
-
how will that effect CRS-2 cargo shipments?
Based on other posts, the refurb Cargo Dragons will continue to deliver supplies and be berthed. Crew Dragons will be mostly crew and some cargo that will fit and will dock.
Crew Dragons may be refurbed if NASA and SX decide there is a need.