-
#100
by
centaurinasa
on 05 Jun, 2017 15:57
-
-
#101
by
centaurinasa
on 05 Jun, 2017 15:58
-
Alignment: all 4 RTL "Ready-To-Latch-Indicators" switched to Green (indicating that Dragon was in the proper position for installation)
-
#102
by
centaurinasa
on 05 Jun, 2017 16:05
-
-
#103
by
centaurinasa
on 05 Jun, 2017 16:15
-
No conversations on audio loop....
-
#104
by
FutureSpaceTourist
on 05 Jun, 2017 16:17
-
-
#105
by
centaurinasa
on 05 Jun, 2017 16:17
-
The two last step for berthing:
- "1st stage capture": crew closed four latches and started driving bolts (SSRMS in limp-mode)-
- "2nd Stage Capture": four sets of four bolts were driven to secure Dragon in place
-
#106
by
centaurinasa
on 05 Jun, 2017 16:20
-
-
#107
by
centaurinasa
on 05 Jun, 2017 16:23
-
Capcom: "Exercice constraint has been lifted"
-
#108
by
centaurinasa
on 05 Jun, 2017 16:26
-
-
#109
by
centaurinasa
on 05 Jun, 2017 16:27
-
-
#110
by
centaurinasa
on 05 Jun, 2017 16:30
-
I heard before, that opening of the hatch would take place today...
-
#111
by
centaurinasa
on 05 Jun, 2017 16:52
-
First sunrise, with Dragon CSR-11 attached to the ISS
-
#112
by
centaurinasa
on 05 Jun, 2017 17:22
-
Over the Atlantic...
-
#113
by
centaurinasa
on 05 Jun, 2017 17:41
-
-
#114
by
centaurinasa
on 05 Jun, 2017 17:41
-
2fish working on pressurisation and leak check of the vestibule between Node-2 and Dragon
-
#115
by
centaurinasa
on 05 Jun, 2017 18:20
-
2fish still on pressurisation leak check....
-
#116
by
centaurinasa
on 05 Jun, 2017 18:33
-
some trouble with the press probe, seems good but MCC ask to try with another probe...
-
#117
by
centaurinasa
on 05 Jun, 2017 18:51
-
Fyodor talking about some Ice cream in Dragon at the end of the DPC ("Daily Planning Conference") ...
-
#118
by
centaurinasa
on 05 Jun, 2017 18:55
-
2fish proceed with the new probe
-
#119
by
centaurinasa
on 05 Jun, 2017 18:56
-
Capcom: "You are GO to complete the procedure !"