-
#60
by
psloss
on 12 Sep, 2006 10:53
-
Tanner has all four linkages on the aft wing latched now.
-
#61
by
eeergo
on 12 Sep, 2006 10:57
-
The night has fallen... and by the way, the helmetcams seem to have some problem, all we get are stills...
-
#62
by
eeergo
on 12 Sep, 2006 10:59
-
45 minutes ahead of schedule! wow, that's fast
-
#63
by
eeergo
on 12 Sep, 2006 10:59
-
45 minutes ahead of schedule! wow, that's fast
-
#64
by
triddirt
on 12 Sep, 2006 11:00
-
Just reported ~45minutes ahead of timeline
-
#65
by
chksix
on 12 Sep, 2006 11:00
-
I heard 25 mins but the sound quality here isn't very good.
-
#66
by
psloss
on 12 Sep, 2006 11:01
-
eeergo - 12/9/2006 6:44 AM
The night has fallen... and by the way, the helmetcams seem to have some problem, all we get are stills...
That could just be orbiter Ku blockage. It's only a problem for us that we're only getting sequence stills from the orbiter...the IV has been referring to the helmet cams in the air-to-ground...
-
#67
by
eeergo
on 12 Sep, 2006 11:07
-
-
#68
by
jacqmans
on 12 Sep, 2006 11:09
-
-
#69
by
eeergo
on 12 Sep, 2006 11:15
-
Oh no! She's holding a galactic plasma gun!

Beautiful screwdriver!
-
#70
by
psloss
on 12 Sep, 2006 11:22
-
Stefanyshyn-Piper getting ready to swing the forward wing out...
-
#71
by
eeergo
on 12 Sep, 2006 11:24
-
-
#72
by
psloss
on 12 Sep, 2006 11:25
-
Looks like we're getting some orbiter TV approaching sunrise...
-
#73
by
eeergo
on 12 Sep, 2006 11:28
-
SARJ preparation underway... first task: to release a shroud and cover fasteners.
And look at that... P4 is stretching its arms!
-
#74
by
psloss
on 12 Sep, 2006 11:29
-
Stefanyshyn-Piper working on manually deploying four-bar linkage...it's moving...
Edit: this one (the forward one) sounds like it's a little harder to deploy...
-
#75
by
chksix
on 12 Sep, 2006 11:31
-
Will they test SARJ motion before unfolding the panels?
-
#76
by
psloss
on 12 Sep, 2006 11:33
-
chksix - 12/9/2006 7:18 AM
Will they test SARJ motion before unfolding the panels?
Yes.
Sounds like Tanner is being asked to help with the forward four-bar linkage deploy.
-
#77
by
psloss
on 12 Sep, 2006 11:34
-
Swung all the way out now, checking the latches...
Edit: ...sounds like it's locked down...
-
#78
by
Stardust9906
on 12 Sep, 2006 11:38
-
-
#79
by
eeergo
on 12 Sep, 2006 11:40
-
Great view... and all solar arraw masts are deployed!