They've reached the new piece of the station...it's nice to know when sunrise is, because they'll probably want to put down the sun visors on the helmets -- the lighting change is pretty fast.
-
#42
by
eeergo
on 12 Sep, 2006 09:57
-
Look at them... so cute crawling on the truss

Edit: Yeah, helmetcam!
-
#43
by
psloss
on 12 Sep, 2006 09:58
-
eeergo - 12/9/2006 5:38 AM
How's this truss addition going to affect station's attitude? Obviously the CM is shifting quite a lot, so how are they going to compensate it?
There was a note in one of the ISS status reports just before the launch campaign started (late August)...have to go look for that, but it might be a good question to throw over to the ISS forum.
-
#44
by
Chris Bergin
on 12 Sep, 2006 09:59
-
Anyone who is on L2 are welcome to copy some useful pages out of the STS-115: Full EVA overview and images (326 pages, 56 meg) document into here.
-
#45
by
psloss
on 12 Sep, 2006 10:01
-
There's a timeline in today's execute package, too...Joe Tanner got a go for beginning the P3 lower tray work...
-
#46
by
MKremer
on 12 Sep, 2006 10:01
-
eeergo - 12/9/2006 4:38 AM
How's this truss addition going to affect station's attitude? Obviously the CM is shifting quite a lot, so how are they going to compensate it?
CMGs shouldn't have a problem for normal attitude control. Orbit boosts will have to compensate for the mass change until S3/S4.
-
#47
by
psloss
on 12 Sep, 2006 10:05
-
FWIW, the 24 August status report waves "good-bye" to the XPOP attitude. That's on L2.
-
#48
by
jacqmans
on 12 Sep, 2006 10:11
-
-
#49
by
psloss
on 12 Sep, 2006 10:14
-
Finally got the cameras repointed...Stefanyshyn-Piper out on P4 (left) and Tanner on the right working on the P3/P1 lower tray hookups.
-
#50
by
psloss
on 12 Sep, 2006 10:25
-
Lower tray utility connections complete 51 minutes into EVA.
-
#51
by
psloss
on 12 Sep, 2006 10:31
-
There's the CID-7 call from the summary timeline. Next step for Tanner is releasing the aft (4A) beta gimbal assembly (BGA) restraints. Stefanyshyn-Piper is working on the aft solar array blanket box (SABB) restraints.
-
#52
by
psloss
on 12 Sep, 2006 10:32
-
Crew just now called that focused TPS inspections not needed...
-
#53
by
Chris Bergin
on 12 Sep, 2006 10:33
-
No FI required. They surely must believe the Gap Filler (the main one) will fall out during re-entry.
-
#54
by
psloss
on 12 Sep, 2006 10:35
-
Stefanyshyn-Piper has finished releasing the aft solar array blanket box (SABB) restraints, now moving to do the same for the forward (2A) SABB.
-
#55
by
chksix
on 12 Sep, 2006 10:36
-
They should have the EV-1 and 2 stripes on the top of the gloves too to make it easier to see who's helmet cam we are looking through.
-
#56
by
psloss
on 12 Sep, 2006 10:39
-
-
#57
by
jacqmans
on 12 Sep, 2006 10:41
-
-
#58
by
psloss
on 12 Sep, 2006 10:50
-
Looks like the four-bar linkage is swinging out on the aft wing...
-
#59
by
jacqmans
on 12 Sep, 2006 10:51
-