-
LIVE: STS-115 Flight Day 4 (EVA-1)
by
jacqmans
on 12 Sep, 2006 03:31
-
-
#1
by
astrobrian
on 12 Sep, 2006 04:00
-
Highlight day for the mission and ISS program as a whole. Truss attatchment and solar array deployment
-
#2
by
nathan.moeller
on 12 Sep, 2006 04:38
-
Haven't heard a response from the crew after the wake up call. What gives?
-
#3
by
nathan.moeller
on 12 Sep, 2006 04:41
-
Nevermind there they are. Configuring for cryocooling. What's the scheduled duration for this EVA today? Good luck Tanner and Piper!
-
#4
by
MKremer
on 12 Sep, 2006 05:00
-
EVA scheduled for about 6.5 hrs, can go 7 if needed.
-
#5
by
Chris Bergin
on 12 Sep, 2006 05:03
-
Big day, for more than one reason.
Attached are two overview screenshots of FD4 on the 207 page STS-115 Final Flight Plan on L2.
-
#6
by
jacqmans
on 12 Sep, 2006 05:11
-
-
#7
by
jacqmans
on 12 Sep, 2006 07:17
-
-
#8
by
Stardust9906
on 12 Sep, 2006 07:35
-
-
#9
by
jacqmans
on 12 Sep, 2006 07:39
-
-
#10
by
Spirit
on 12 Sep, 2006 07:45
-
P3/4 ready to latch.
-
#11
by
jacqmans
on 12 Sep, 2006 07:45
-
-
#12
by
Stardust9906
on 12 Sep, 2006 07:45
-
-
#13
by
jacqmans
on 12 Sep, 2006 07:47
-
-
#14
by
Stardust9906
on 12 Sep, 2006 07:58
-
First stage of capture complete. SSRMS in limp mode.
-
#15
by
Stardust9906
on 12 Sep, 2006 08:02
-
Second and third stages of capture now complete.
-
#16
by
jacqmans
on 12 Sep, 2006 08:39
-
-
#17
by
psloss
on 12 Sep, 2006 08:41
-
Two of four bolts now complete. One more and the EVA will pick up...the third bolt is being driven now...takes about 8-10 minutes.
-
#18
by
Oli4
on 12 Sep, 2006 08:41
-
@ astrobrian: the deployement of the solar arrays isn't planned for today. The arrays wil be deployed after EVA 2...
-
#19
by
psloss
on 12 Sep, 2006 08:43
-
Airlock depress scheduled for about 15 minutes from now.