This STA is necessary to authorize launch vehicle communications for SpaceX Mission 1346, Complex 39a, Kennedy Space Center. Application includes three sub-orbital first stage boosters, and an orbital second stage. Trajectory data will be provided directly to NTIA, USAF, and NASA. All downrange Earth stations are receive-only. The launch licensing authority is FAA Office of Commercial Space Transportation.
spacex Falcon Heavy’s three first stage cores have all completed testing at our rocket development facility in McGregor, Texas. This side booster previously launched SpaceX’s ninth resupply mission to the @ISS.
This STA uses information from previous application 0739-EX-ST-2017, and covers three experimental first-stage recovery operations following a Falcon 9 launch from Cape Canaveral. This request for authority is limited to two functions: 1) pre-launch checkout test of the TC uplink from an onshore station at CCAFS (less than five minutes in duration) 2) experimental uplink testing from the an onshore station at CCAFS during first-stage descent (less than five minutes in duration) Both operations are pre-coordinated with the launch Range. Launch vehicle flight communications for this mission are covered by a separate STA.
FCC Permit Application for FH Demo Stage RecoveryQuoteThis STA uses information from previous application 0739-EX-ST-2017, and covers three experimental first-stage recovery operations following a Falcon 9 launch from Cape Canaveral. This request for authority is limited to two functions: 1) pre-launch checkout test of the TC uplink from an onshore station at CCAFS (less than five minutes in duration) 2) experimental uplink testing from the an onshore station at CCAFS during first-stage descent (less than five minutes in duration) Both operations are pre-coordinated with the launch Range. Launch vehicle flight communications for this mission are covered by a separate STA. The ASDS is closer to shore for this mission than it is normally stationed for GTO flights:North 29 0 20 West 77 7 55
Anyone know why the ASDS might be closer to shore? The center core, all things being equal, would have a higher speed at MECO than a F9 ist stage. My SWAG would be far greater margins for this mission (so, a bit of a boostback) or, lofted trajectory.
Has there been any movement on the date, since the tentative date of 11/28. I am going to be in Orlando around then and I will change all plans to go see this.
I would be happy to drive by and see it on the stand, maybe there is still a chance that will happen by 28 Nov. I imagine they will have it up a few times before lighting up the candle(s).
What to watch for:1. TE/L tests at LC402. Fit checks at both3. WDR FH4. F9 launch from LC405. Payload for FH 6. FH hotfire(s)...Launch!My "cup of coffee" bet is launch before February, assuming November for 1. Redeemable only in Lompoc after a Falcon/Atlas launch.
LC39A still has significant chunks of the RSS as well, and my understanding is that needs to be down before FH can launch. If the issue is vibration, probably needs to be down before FH static test.