Home
Forums
L2 Sign Up
ISS
Commercial
Shuttle
SLS/Orion
Russian
European
Chinese
Unmanned
Other
Home
Help
Tags
Calendar
Login
Register
NASASpaceFlight.com Forum
»
International Space Flight (ESA, Russia, China and others)
»
Indian Launchers
»
FAILURE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
31
Likes
Print
Pages:
1
2
3
[
4
]
5
6
...
10
Next
All
Go Down
Author
Topic: FAILURE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC) (Read 53379 times)
Steven Pietrobon
Member
Senior Member
Posts: 14872
Adelaide, Australia
Liked: 4266
Likes Given: 578
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #60 on:
08/31/2017 01:31 PM »
Liftoff!
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 116594
Liked: 35741
Likes Given: 11579
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #61 on:
08/31/2017 01:31 PM »
LAUNCH!
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
Steven Pietrobon
Member
Senior Member
Posts: 14872
Adelaide, Australia
Liked: 4266
Likes Given: 578
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #62 on:
08/31/2017 01:32 PM »
T+1 minute.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Steven Pietrobon
Member
Senior Member
Posts: 14872
Adelaide, Australia
Liked: 4266
Likes Given: 578
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #63 on:
08/31/2017 01:32 PM »
T+2 minutes. First stage separation.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 116594
Liked: 35741
Likes Given: 11579
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #64 on:
08/31/2017 01:32 PM »
Solids jettisoned.
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
Steven Pietrobon
Member
Senior Member
Posts: 14872
Adelaide, Australia
Liked: 4266
Likes Given: 578
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #65 on:
08/31/2017 01:34 PM »
T+3 minutes. Second stage performance nominal.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Steven Pietrobon
Member
Senior Member
Posts: 14872
Adelaide, Australia
Liked: 4266
Likes Given: 578
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #66 on:
08/31/2017 01:35 PM »
T+4 minutes.
Third stage ignition.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 116594
Liked: 35741
Likes Given: 11579
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #67 on:
08/31/2017 01:35 PM »
Good third stage performance.
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
Steven Pietrobon
Member
Senior Member
Posts: 14872
Adelaide, Australia
Liked: 4266
Likes Given: 578
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #68 on:
08/31/2017 01:36 PM »
T+5 minutes. Third stage performance normal.
«
Last Edit: 08/31/2017 01:39 PM by Steven Pietrobon
»
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Galactic Penguin SST
Geek Penguin in GTO
Global Moderator
Senior Member
Posts: 7236
Hong Kong
Liked: 1938
Likes Given: 1691
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #69 on:
08/31/2017 01:36 PM »
Hmm......have the fairing halves separated at all?
Logged
Chinese spaceflight is a cosmic riddle wrapped in a galactic mystery inside an orbital enigma... - (not) Winston Churchill
Steven Pietrobon
Member
Senior Member
Posts: 14872
Adelaide, Australia
Liked: 4266
Likes Given: 578
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #70 on:
08/31/2017 01:37 PM »
T+6 minutes.
Third stage burnout.
«
Last Edit: 08/31/2017 01:39 PM by Steven Pietrobon
»
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Steven Pietrobon
Member
Senior Member
Posts: 14872
Adelaide, Australia
Liked: 4266
Likes Given: 578
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #71 on:
08/31/2017 01:38 PM »
T+7 minutes. Velocity is a little low.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Steven Pietrobon
Member
Senior Member
Posts: 14872
Adelaide, Australia
Liked: 4266
Likes Given: 578
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #72 on:
08/31/2017 01:39 PM »
T+8 minutes.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Steven Pietrobon
Member
Senior Member
Posts: 14872
Adelaide, Australia
Liked: 4266
Likes Given: 578
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #73 on:
08/31/2017 01:40 PM »
T+9 minutes. PS4 ignition.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
eeergo
Phystronaut
Global Moderator
Senior Member
Posts: 4903
Milan, Italy; Spain; Japan
Liked: 607
Likes Given: 426
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #74 on:
08/31/2017 01:40 PM »
No, looks like it's falling in altitude?
«
Last Edit: 08/31/2017 01:42 PM by eeergo
»
Logged
-DaviD-
Steven Pietrobon
Member
Senior Member
Posts: 14872
Adelaide, Australia
Liked: 4266
Likes Given: 578
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #75 on:
08/31/2017 01:41 PM »
T+10 minutes.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Steven Pietrobon
Member
Senior Member
Posts: 14872
Adelaide, Australia
Liked: 4266
Likes Given: 578
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #76 on:
08/31/2017 01:42 PM »
T+11 minutes.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
AJA
Full Member
Posts: 856
Per Aspera Ad Ares, Per Aspera Ad Astra
India
Liked: 135
Likes Given: 203
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #77 on:
08/31/2017 01:42 PM »
Quote from: Galactic Penguin SST on 08/31/2017 01:36 PM
Hmm......have the fairing halves separated at all?
I was looking at that too. On one of the other camera angles, you can see a monitor in the Flight Control Room that shows the satellite, and the fairing. And that doesn't look like it's separated.
It'd make sense for the under-performance. (Added fairing weight, even with nominal stage burn)
Haven't wanted to be wrong in a while now, but I am.
«
Last Edit: 08/31/2017 01:43 PM by AJA
»
Logged
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 116594
Liked: 35741
Likes Given: 11579
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #78 on:
08/31/2017 01:42 PM »
The overlaps seem off?
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
Steven Pietrobon
Member
Senior Member
Posts: 14872
Adelaide, Australia
Liked: 4266
Likes Given: 578
Re: LIVE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)
«
Reply #79 on:
08/31/2017 01:43 PM »
T+12 minutes.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Print
Pages:
1
2
3
[
4
]
5
6
...
10
Next
All
Go Up
Tags:
NASASpaceFlight.com Forum
»
International Space Flight (ESA, Russia, China and others)
»
Indian Launchers
»
FAILURE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)