Re: Reusability effect on costs
« Reply #780 on: 11/16/2017 08:06 am »
Quote
[Karim Michel] Sabbagh [SES]: have seen launch costs for a 3.5-ton satellite go from more than $100M to closer to $60M now, and expect to drop to half that. #NewSpaceEurope

https://twitter.com/jeff_foust/status/931079161573146625

Online FutureSpaceTourist

  • Senior Member
  • *****
  • Posts: 7548
  • UK
    • Plan 28
  • Liked: 8444
  • Likes Given: 2870
Re: Reusability effect on costs
« Reply #781 on: 11/27/2017 10:55 pm »
Quote
EU governments’ indecision on SpaceX challenge seen as threat to Ariane system’s survival
by Peter B. de Selding | Nov 27, 2017

https://www.spaceintelreport.com/eu-governments-indecision-spacex-challenge-seen-threat-ariane-systems-survival/

Article includes:

Quote
United Launch Alliance thinks SpaceX’s reuse of the Falcon 9 first stage makes no economic sense unless each stage is used at least 10 times. Germany’s DLR disagrees, and says SpaceX’s new launch cadence puts it within reach of making reusability pay. [Attached slide Credit: ULA]

DLR’s analysis suggesting 20 - 25 flights per year are enough for significant savings.

Offline RedLineTrain

  • Full Member
  • ****
  • Posts: 863
  • Liked: 546
  • Likes Given: 830
Re: Reusability effect on costs
« Reply #782 on: 11/27/2017 11:38 pm »
DLR’s analysis suggesting 20 - 25 flights per year are enough for significant savings.

To be clear, the image is ULA's well-discussed Dr. Sowers analysis, not DLR's.
« Last Edit: 11/27/2017 11:39 pm by RedLineTrain »

Offline TrevorMonty

Re: Reusability effect on costs
« Reply #783 on: 12/01/2018 07:16 pm »
Lots of good stuff in this article on benefits of reuseability especially in regards to making more reliable LV.

spaceflightnow.com/2018/12/01/spacex-launch-sunday-will-signify-a-new-advance-in-reusing-rockets/

“There’s an additional benefit or side effect in addition to just the economics of reusability,” Koenigsmann said. “And that’s, basically, you look at the booster after the flight, and you can find things you wouldn’t see otherwise. You may see where stuff leaks or where heat comes through, or something like that. You might find loose joints that were tight before that you need to protect more. This kind of thing is actually incredibly valuable to make a more reliable rocket. You can actually inspect it.

“If you don’t know what’s happening you can just put a GoPro on the place and watch it during launch. That’s what we do, we just pull it out and watch it and go, OK, that seems to be OK, or we figure out this is something that needs to be reinforced. Telemetry is typically limited by bandwidth. We just log the telemetry locally, just in case, and we get all the high-speed data right there from a solid state basically on the vehicle, and use that to look at all the loads that the vehicle sees, all the data that are important to us, and try to improve the vehicle based on those data.


Offline john smith 19

  • Senior Member
  • *****
  • Posts: 7883
  • Everyplaceelse
  • Liked: 1334
  • Likes Given: 8916
Re: Reusability effect on costs
« Reply #784 on: 12/02/2018 08:48 am »
I've seen discussion about this spread around multiple topics. Please kill this topic if there is already one but I couldn't find it on my phone browser.

So there are various guesses but often vehicle price is guessed as 70% first stage, 30% upper stage. So initial impression is that flying reused booster can reduce launch cost by 70%. Of course that's not true, because there is refrubrishment cost, launch operation cost,  payload integration cost etc. Still it sounds like if reusing 1st stage could reduce cost by about 50%. And we still are not talking about price as it makes no sense for Space X to reduce their profit from service provided so it is about cost reduction which is different from price reduction.
Let's assume that this 50% cost price is good enough to include price of stage if split among multiple launches so it's 50% cost reduction for all launches.

Is that the case? No. Because building stage is only part of it's cost. There is also R&D cost per stage which is independent from if stage is build or not. There are for sure people here who know how  big part is this. But please keep in mind it's not development of Falcon9 cost. It's quite pernament cost of keeping engineering department in house. Which is used to improve technology continuesly. And I believe it's quite a cost. So Space X needs to earn enough by their services to pay for it. Since they are continuesly innovating this can be treated as kind of fixed cost indendent from if rockets are build or not. This cost could be reduced once tech is developed but nobody (except some imaginary investors and short sighted clients) really want Space X to be scalled down.

Finally there is keeping production line cost. Those are employees which are not hired by temporary work agency. Nobody want SpaceX to lose higly qualified work force.

So finally my reasoning is that reusing (in short term) saves very little. Some raw materials and outsorced parts, but those are not many.

What reusability allows is to use resurces currently engaged in building stages to be used for other purposes. If there is market increase  some of those can be transferred to build more second stages. Now for the same operational cost there can be more launches and there ara real savings.

But if launch rate doesn't grow enough or SpaceX doesn't  scale down there is only limited saving.

So assuming reusability is given and SpaceX won't scale down, which I believe are true assumtions, cost reduction allowed by this humongous achievement is dependent from demand side and can be very small if there is no increase in launch rate.

Space X has some backlog so some increase is possible. But how big is that?

And am I missing something? Maybe raw materials and outsorced parts are really costly? Or my reasoning is flawed?
Yes. It's called BFR.

Reuse let's they gain more profit from the same price to customers, which reduces their need for external investors. Cancelling work on US reuse (which has proved staggeringly difficult to make work economically) frees their R&D people to work on BFR. It also frees production workers to work on BFR.

Note reuse cuts down the booster mfg line. Every flight still needs an US which is thrown away. But once you've got 2 flights then you've halved the production rate, but beyond that the effects are rather less dramatic. You need to get 4 flights out of every booster (and all you customers have to be happy to fly reflown) before you can half that line again.
BFS. The worlds first Methane fueled FFORSC engined CFRP stainless steel structure A380 sized aerospaceplane tail sitter capable of flying in Earth and Mars atmospheres. BFR. The worlds biggest Methane fueled FFORSC engined CFRP stainless steel structure booster for BFS. First flight to Mars by end of 2022. Forward looking statements. T&C apply. Believe no one. Run your own numbers. So, you are going to Mars to start a better life? Picture it in your mind. Now say what it is out loud.

Offline PM3

  • Full Member
  • **
  • Posts: 212
  • Germany
  • Liked: 208
  • Likes Given: 119
Re: Reusability effect on costs
« Reply #785 on: 02/10/2019 11:49 pm »
From another thread:

Elon said that each drone recovery costs a couple of million dollars,

How can it be that expensive? An autonomous ship, a support ship and a tug ship operating for two (?) days; then lift the stage to land by two cranes - how does that add up to several million dollars?

Offline matthewkantar

  • Full Member
  • ****
  • Posts: 1034
  • Liked: 798
  • Likes Given: 858
Re: Reusability effect on costs
« Reply #786 on: 02/10/2019 11:55 pm »
They don't lease the barge for a day or two, they lease it for a year. There are dozen or so barge landings a year, so the barge cost per landing is approximately X/12. Then here are the chase boats, the tugs, the lease at dockside, the crane, the personnel, the fuel, etc etc. Seems like no problem to have it add up to millions per flight.

Matthew

Offline PM3

  • Full Member
  • **
  • Posts: 212
  • Germany
  • Liked: 208
  • Likes Given: 119
Re: Reusability effect on costs
« Reply #787 on: 02/11/2019 12:39 am »
Ok. The original discussion and my question was about the additional costs for additional landings, e.g. for Starlink launches. Could that be millions for each additional sea landing?

Maybe someone knows the context of that Elon quote or has a link to it? (Nomadd suggested to ask in the forum ...)

Offline PM3

  • Full Member
  • **
  • Posts: 212
  • Germany
  • Liked: 208
  • Likes Given: 119
Re: Reusability effect on costs
« Reply #788 on: 02/11/2019 01:11 am »
Found it: https://spacenews.com/spacex-targeting-24-hour-turnaround-in-2019-full-reusability-still-in-the-works/
11 May 2018

Quote
Musk said SpaceX lowered prices from “about $60 million to about $50 million for a reflown booster,” and expects “to see a steady reduction in prices” going forward. He cautioned though that SpaceX has lots of fixed costs, its future Starlink satellite internet constellation and development of the Big Falcon Rocket (BFR) that require revenue from launches, meaning prices can only go so low. Ocean recoveries, which require sending drone ships out to sea for landing Falcon 9 first stages, also cost “a few million dollars,” he said.

Speaking of "future Starlink", this seems to refer to today's launch frequency, i.e. confirms what matthewkantar wrote.

Offline Rondaz

  • Full Member
  • ****
  • Posts: 576
  • Liked: 230
  • Likes Given: 129
Re: Reusability effect on costs
« Reply #789 on: 02/12/2019 02:44 pm »
SpaceX rival’s answer to reusable Falcon 9 “too cautious”, says French auditor

By Eric Ralph  Posted on February 12, 2019

https://www.teslarati.com/spacex-competitor-arianespace-critique-unsustainable-falcon-9-response/?mc_cid=db8b0d5a12&mc_eid=60eb267dc3

Offline raketa

  • Full Member
  • **
  • Posts: 272
  • Liked: 52
  • Likes Given: 33
Re: Reusability effect on costs
« Reply #790 on: 02/20/2019 12:38 am »
Spacex reusability shaking launch market so much, that even if it will get all available launch opportunities, it will becoming just way to pay for bottom part of the company expenses.
Lowering launch price will not bring in short term new customers and even if Spacex to lower true cost with 10% markup, it will take time for new customers show and drain money for SS and SH development.
Article about Arianne give me such inside to dilemma that Boeing,Lockheed and other company dealing with, reusability mean lest rockets and less jobs for near future.
Spacex Starlink project is answer to go over this period(beside be revenue for future Mars base), before new customers show up because launch price is lowered.
I admire how thoughtful in long term Spacex is, seeing future issue 4 years ago and looking for solution and building new markets.

Online FutureSpaceTourist

  • Senior Member
  • *****
  • Posts: 7548
  • UK
    • Plan 28
  • Liked: 8444
  • Likes Given: 2870
Re: Reusability effect on costs
« Reply #791 on: 02/22/2019 02:44 am »
Elon’s view on number of re-uses per F9 booster:

Not expecting a B1048.5:

https://twitter.com/elonmusk/status/1098771535588777986

Quote
High probability of this particular rocket getting destroyed by Dragon supersonic abort test. Otherwise, at least 20 or 30 missions for Falcon 9. Starship will take over before the F9 fleet reaches end of life.

Online theinternetftw

  • Full Member
  • ***
  • Posts: 355
    • www.theinternetftw.com
  • Liked: 736
  • Likes Given: 373
Re: Reusability effect on costs
« Reply #792 on: 03/13/2019 10:48 pm »
On internal labor costs, schedule, and the possible ability to fast-track production.

Quote
If you want to look at the current Falcon Heavy as a strong bit of evidence, what I can say for sure is that the three new boosters (prob four, actually) went from nothing to completed and in FL in less than 12 months. Prob more like 6-9, given production of B1046-B1051 & B1054

Now that doesn't necessarily translate into "lead time" per se, but it gives a good idea. SpaceX is actually allowing production workforce to cut weeks to 40 hours (!!!) because they're finishing everything on Friday and have nothing to do on Sat.

Which is to say that Block 5's reusability has produced more than a little slack in the Falcon production system. Priority production could probably be expedited immediately with minimal impact to the launch business, much like the latest FH was effectively built all at once.

from: https://twitter.com/13ericralph31/status/1105951398842109952