Author Topic: LIVE: GSLV F05, INSAT 3DR, SLP, September 8, 2016 (11:20 UTC)  (Read 63205 times)

Offline ss1_3

  • Full Member
  • *
  • Posts: 158
  • Liked: 31
  • Likes Given: 10
Thread for the next GSLV MkII flight carrying INSAT 3DR- replacement for the INSAT 3D satellite (meteorological).

http://www.newindianexpress.com/states/kerala/Next-GSLV-Mission-in-July-2016-VSSC/2015/08/30/article3000786.ece

Quote
The next Geosynchronous Satellite Launch Vehicle launch will be the GSLV F09 mission and we plan to have it in July 2016
.
.
The GSLV F09 mission will have any one of the three satellites - GSAT-9, GSAT-7A or the INSAT 3DR - as payload, depending on the priority at the time

Relevant Links:

https://en.wikipedia.org/wiki/INSAT-3D
http://www.wmo-sat.info/oscar/satellites/view/194
http://space.skyrocket.de/doc_sdat/insat-3d.htm
« Last Edit: 09/08/2016 12:38 pm by Satori »

Offline ss1_3

  • Full Member
  • *
  • Posts: 158
  • Liked: 31
  • Likes Given: 10
Re: GSLV F09, INSAT 3DR, SLP, NET Jul 2016
« Reply #1 on: 12/17/2015 07:12 am »
INSAT- 3DR payload flagged off


 After Successful Test & Evaluation, INSAT-3DR Payload (Sounder & Imager) was delivered to ISITE/ISAC on November 19, 2015.


Offline m.prasad

  • Member
  • Posts: 91
  • Liked: 5
  • Likes Given: 0
Re: GSLV F09, INSAT 3DR, SLP, NET Jul 2016
« Reply #2 on: 12/17/2015 12:37 pm »
Why ISRO has selected INSAT-3DR over other satellites as already INSAT-3D in orbit with the same Imager & Sounder?

Does any one have idea on this?

Thx
~Prasad

Offline K210

  • Full Member
  • ****
  • Posts: 606
  • Liked: 284
  • Likes Given: 25
Re: GSLV F09, INSAT 3DR, SLP, NET Jul 2016
« Reply #3 on: 12/17/2015 12:40 pm »
Why ISRO has selected INSAT-3DR over other satellites as already INSAT-3D in orbit with the same Imager & Sounder?

Does any one have idea on this?

Thx
~Prasad

INSAT-3D had some technical issues shortly after launch leading to limited operation. Hopefully INSAT-3DR will not run into the same issues.

Offline K210

  • Full Member
  • ****
  • Posts: 606
  • Liked: 284
  • Likes Given: 25
Re: GSLV F09, INSAT 3DR, SLP, NET Jul 2016
« Reply #4 on: 12/17/2015 12:42 pm »
FYI this should be the first launch where the indigenous cryo is flown in uprated configuration. Thrust will be increased from 73.55kn to 93.1kn and propellent loading will be increased from 12.8 tons to 15 tons.

Offline Ohsin

  • Full Member
  • ****
  • Posts: 1469
  • Liked: 1453
  • Likes Given: 2379
Re: GSLV F09, INSAT 3DR, SLP, NET Jul 2016
« Reply #5 on: 12/17/2015 02:29 pm »
FYI this should be the first launch where the indigenous cryo is flown in uprated configuration. Thrust will be increased from 73.55kn to 93.1kn and propellent loading will be increased from 12.8 tons to 15 tons.

Can you point me to source on that :)

Also from http://www.isro.gov.in/update/03-sep-2015/gslv-saga

Quote
The next mission, designated as GSLV-F05, is targeted for launch in July 2016 and will carry the 2200 kg INSAT-3DR meteorological satellite.  GSLV-F09 is planned in May 2017 to launch the GSAT-9 satellite.
"Well, three cheers to Sharma, but our real baby is INSAT."

Offline Ohsin

  • Full Member
  • ****
  • Posts: 1469
  • Liked: 1453
  • Likes Given: 2379
Re: GSLV F09, INSAT 3DR, SLP, August 2016
« Reply #6 on: 03/31/2016 02:06 pm »
Quote
INSAT-3DR Communication Payload Flag off

After Successful Test & Evaluation, INSAT-3DR Payload was dispatched to ISITE/ISAC on March 16, 2016.

Attached PDF has some INSAT 3DR information
« Last Edit: 03/31/2016 02:20 pm by Ohsin »
"Well, three cheers to Sharma, but our real baby is INSAT."

Offline tehwkd

Re: GSLV F09, INSAT 3DR, SLP, August 2016
« Reply #7 on: 05/01/2016 05:41 am »
Article mentions dual payload with one being the INSAT-3DR, doesn't mention the name of the other

http://www.newindianexpress.com/cities/chennai/ISRO-to-Launch-Two-New-Meteorological-Satellites/2016/05/01/article3409349.ece
Custodian of NextLaunch & LaunchStuff |   Utilizer of Google

Offline vineethgk

  • Full Member
  • ****
  • Posts: 892
  • India
  • Liked: 187
  • Likes Given: 265
Re: GSLV F09, INSAT 3DR, SLP, August 2016
« Reply #8 on: 05/01/2016 05:55 am »
Article mentions dual payload with one being the INSAT-3DR, doesn't mention the name of the other

http://www.newindianexpress.com/cities/chennai/ISRO-to-Launch-Two-New-Meteorological-Satellites/2016/05/01/article3409349.ece
The second meteorological payload should be referring to SCATSAT, which is planned to be launched in a PSLV flight later this year.

Sent from my ASUS_Z010D using Tapatalk


Offline vyoma

  • Full Member
  • ****
  • Posts: 1878
  • India
  • Liked: 850
  • Likes Given: 127
Re: GSLV F09, INSAT 3DR, SLP, August 2016
« Reply #9 on: 05/27/2016 11:58 pm »
INSAT 3DR will be launched by GSLV-Mk2 F05 as per ISOR 2015-16 annual report.

Quote
The realisation of subsystems/stages for the next flight GSLV-F05 has commenced. GSLV-F05 carrying INSAT-3DR satellite, is targeted for launch during the third quarter of 2016.
« Last Edit: 05/27/2016 11:59 pm by vyoma »

Offline vyoma

  • Full Member
  • ****
  • Posts: 1878
  • India
  • Liked: 850
  • Likes Given: 127
Re: GSLV F09, INSAT 3DR, SLP, August 2016
« Reply #10 on: 07/23/2016 01:00 am »
http://gadgets.ndtv.com/science/news/isro-to-launch-insat-3dr-weather-satellite-in-august-864096

Quote
The Indian Space Research Organisation (Isro) will launch INSAT-3DR next month with its GSLV rocket, said Kiran Kumar at the Madras Institute of Technology Alumni Association meeting in Chennai.

Offline input~2

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 6804
  • Liked: 1536
  • Likes Given: 567
Re: GSLV F09, INSAT 3DR, SLP, mid September 2016
« Reply #11 on: 07/23/2016 07:37 am »
already slipped to 2nd week of September
http://www.andhrabhoomi.net/content/nation-829

Offline vineethgk

  • Full Member
  • ****
  • Posts: 892
  • India
  • Liked: 187
  • Likes Given: 265
Re: GSLV F05, INSAT 3DR, SLP, mid-September 2016
« Reply #12 on: 07/29/2016 12:46 pm »
Isro Looking to Launch INSAT-3DR Weather Satellite on August 28

Quote
Preparations for the launch of weather satellite INSAT-3DR with the geosynchronous satellite launch vehicle (GSLV-MkII) next month are progressing at Sriharikota, officials said on Friday.
"The weather satellite INSAT-3DR will be put into orbit by a GSLV rocket August end. Preparations for the launch are going on," P. Kunhi Krishnan, Director of the Satish Dhawan Space Centre (SDSC), told IANS.

It is learnt that the launch is tentatively slated for August 28.

Offline vineethgk

  • Full Member
  • ****
  • Posts: 892
  • India
  • Liked: 187
  • Likes Given: 265
Re: GSLV F05, INSAT 3DR, SLP, August 28 2016
« Reply #13 on: 08/04/2016 09:25 pm »
Indian GSLV will truly ‘arrive’ this month

Quote
Enters the all-Indian GSLV, finally, later this month. The GSLV-F05 flight coming up on August 28 or 29 will be its first regular, full-service or 'operational' one
Quote
GSLV-Mk2 however can put only satellites weighing up to 2,200 kg into geostationary space. At least four more of them are in the making now.
Quote
Another official said the plan is to do two GSLV launches a year from next year, apart from doubling the PSLV rate to ten or a dozen a year.

Offline input~2

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 6804
  • Liked: 1536
  • Likes Given: 567
Re: GSLV F05, INSAT 3DR, SLP, August 29 2016
« Reply #14 on: 08/07/2016 02:37 pm »
Launch now announced for August 29 at 11:00 UTC
Satellite launch mass: 2061 kg
source

Offline worldtimedate

  • Full Member
  • ****
  • Posts: 444
  • Liked: 40
  • Likes Given: 8
Re: GSLV F05, INSAT 3DR, SLP, August 29 2016
« Reply #15 on: 08/08/2016 06:50 am »
Launch now announced for August 29 at 11:00 UTC
Satellite launch mass: 2061 kg
source

INSAT 3DR weighing only 2061 seems to be little lighter than it should be. Last year GSLV launched a satellite GSAT-6 weighing 2117kg. GSLV Project Manager Umamaheshwaran said last year after the launch that his team would gradually increase the payload up to maximum 2.5 ton by tweaking cryogenic engine in the subsequent launches.

Bur right now, it seems that GSLV II can't go beyond 2.2 ton capacity.

Quote
GSLV-Mk2 however can put only satellites weighing up to 2,200 kg into geostationary space. At least four more of them are in the making now.
source

Source :
Indian GSLV will truly ‘arrive’ this month

--- [ --- ]
« Last Edit: 08/08/2016 07:02 am by worldtimedate »

Offline K210

  • Full Member
  • ****
  • Posts: 606
  • Liked: 284
  • Likes Given: 25
Re: GSLV F05, INSAT 3DR, SLP, August 29 2016
« Reply #16 on: 08/08/2016 12:14 pm »
I think it will be a few more flights before we see GSLV fly in a uprated configration. Chances are they are trying to build up the realiablity of the base model to attract customers. PSLV did not get its first major upgrades till its 7th launch.

Possible upgrade path for GSLV:

Upgraded upper stage C-15 : 2.5 ton GTO
4 metre heatshield : More payload room
Uprated liquid fuel boosters + upgraded solid core: 3 - 3.5 ton GTO

« Last Edit: 08/08/2016 12:15 pm by K210 »

Offline sportyfailure

  • Member
  • Posts: 18
  • India
  • Liked: 13
  • Likes Given: 7
Re: GSLV F05, INSAT 3DR, SLP, August 29 2016
« Reply #17 on: 08/11/2016 12:41 pm »
Article noticed By Ohsin and trasnslated by me

A pyrocutter in the solar panel deployment mechanism was found to be faulty and needs to be replaced. Launch may be delayed by 3 days or 1 week.


ఇన్సాట్‌-3డీఆర్‌ ఉపగ్రహంలో సాంకేతిక లోపం
జీఎస్‌ఎల్‌వీ ప్రయోగం వాయిదా పడే అవకాశం
శ్రీహరికోట, న్యూస్‌టుడే: శ్రీపొట్టి శ్రీరాములు నెల్లూరు జిల్లాలోని సతీశ్‌ ధవన్‌ అంతరిక్ష కేంద్రం షార్‌ (శ్రీహరికోట) నుంచి ఈ నెల 29న నింగిలోకి పంపాల్సిన జియోసింక్రనస్‌ శాటిలైట్‌ లాంచ్‌ వెహికల్‌ (జీఎస్‌ఎల్‌వీ) ప్రయోగం వాయిదా పడనుందని సమాచారం. జీఎస్‌ఎల్‌వీ ద్వారా 2,200 కిలోల బరువున్న ఇన్సాట్‌-3డీఆర్‌ ఉపగ్రహాన్ని నిర్ణీత కక్ష్యలోకి ప్రవేశ పెట్టాల్సి ఉంది. రాకెట్‌లో ఉపగ్రహాన్ని అనుసంధానం చేసే ముందు పరీక్షలు నిర్వహిస్తున్నారు. అయితే ఉపగ్రహంలోని సోలార్‌ ప్యానల్‌ పని చేసేందుకు అమర్చిన ‘పైరోకట్టర్‌’ పనితీరు అంచనాలను అందుకోలేదని తాజాగా గుర్తించినట్లు సమాచారం. దీంతో పైరోకట్టర్‌ను మార్చాలని శాస్త్రవేత్తలు నిర్ధారణకు వచ్చారు. పాత పైరోకట్టర్లు శాస్త్రవేత్తలకు అందుబాటులో ఉన్నాయి. వీటిలో ఒకదానిని సోలార్‌ ప్యానల్‌కు అమర్చితే సరిపోతుందా? లేక.. కొత్తదానిని తయారు చేసి అమర్చాలా.. అనే విషయంలో శాస్త్రవేత్తలు సందిగ్ధంలో ఉన్నారు. అందుబాటులో ఉన్న పైరోకట్టర్‌ను సోలార్‌ ప్యానల్‌కు అమర్చే నేపథ్యంలో జీఎస్‌ఎల్‌వీ ప్రయోగం మూడు రోజులు, కొత్తదానినే అమర్చాలంటే వారానికిపైగా వాయిదా పడే అవకాశం ఉంది.
ఎంఆర్‌ఆర్‌లో ఖరారు కాని ప్రయోగ తేదీ
షార్‌లోని బ్రహ్మప్రకాష్‌ హాలులో బుధవారం ఉదయం నుంచి సాయంత్రం వరకు జీఎస్‌ఎల్‌వీకి సంబంధించిన రాకెట్‌ సన్నద్ధత సమావేశం (ఎంఆర్‌ఆర్‌) జరిగింది. ఉపగ్రహంలోని సోలార్‌ ప్యానల్‌లో వచ్చిన లోపాలపై సుధీర్ఘంగా చర్చించారు. ఈ నేపథ్యంలో రాకెట్‌ ప్రయోగ తేదీని ఖరారు చేయలేదని తెలిసింది. ఈ విషయమై మళ్లీ గురువారం సమావేశం కావాలని శాస్త్రవేత్తలు నిర్ణయించారు
http://www.eenadu.net/news/news.aspx?item=ap-main-news&no=15
Translation by /u/standardengineer
INSAT-3DR satellite has a technical issue.
GSLV launch likely to be delayed.
SHAR: As per sources GSLV launch due for Aug 29 is likely to be delayed. Launcher-satellite integration tests are going on. A pyrocutter is used to deploy solar panels in the satellites. The pyrocutter on INSAT-3DR did not meet the standards. They have decided to replace the pyrocutter. Spares are available. Scientists are studying whether to use a spare or to make a new one. GSLV launch will be delayed by three days if they use a spare pyrocutter, it could be delayed by a week if they decide to use a new pyrocutter.
Launch date was not agreed upon in the MRR.
MRR occured at Wednesday evening. They discussed the problems noticed in the solar panels. For this reason launch date was not confirmed. another review meet will happen on thursday.
Tl;DR; A pyrocutter used to deploy solar panels was found to be faulty and will need to be replaced.

Offline input~2

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 6804
  • Liked: 1536
  • Likes Given: 567
Re: GSLV F05, INSAT 3DR, SLP, September 2016
« Reply #18 on: 08/11/2016 07:17 pm »
Also here an indication that Insat 3DR will now be launched in September
http://www.goinews.com/2016/08/08/isro-launch-2-new-meteorological-satellites-september/

Offline input~2

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 6804
  • Liked: 1536
  • Likes Given: 567
Re: GSLV F05, INSAT 3DR, SLP, NET September 8 2016
« Reply #19 on: 08/14/2016 02:29 pm »
Launch postponed 10 days, so NET September 8
source

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1