Preparations for the launch of OneWeb devices continue at Baikonur

09/08/2021 10:00

At the Baikonur cosmodrome, the preparation of the spacecraft continues under the OneWeb launch program. On Tuesday, September 7, 2021, a bundle of 34 OneWeb spacecraft, installed on the Fregat upper stage under the nose fairing, was reloaded from the workstation of the assembly and test building of site 112 to the railway unit and transported to site 31.

The work was carried out by specialists from the Yuzhny Space Center (a branch of the Center for Operation of Ground-Based Space Infrastructure Facilities) and the S.А. Lavochkin (part of the State Corporation "Roscosmos"). The next stage of preparation is the docking of the warhead with the third stage of the Soyuz-2.1b launch vehicle.

The launch of spacecraft of the satellite company OneWeb is scheduled for September 14, 2021 from the Vostok launch complex of the Baikonur cosmodrome.

https://www.roscosmos.ru/32487/

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
At the Baikonur cosmodrome, the preparation of the space warhead continues under the #OneWeb program . A bundle of 34 spacecraft, installed on the Fregat upper stage under the nose fairing, was overloaded from the workplace and transported to site No. 31

https://twitter.com/roscosmos/status/1435500839670587395

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
Completed assembly of the Soyuz-2.1b launch vehicle with 34 OneWeb spacecraft

09.09.2021 13:54

On September 9, 2021, specialists from the Yuzhny Space Center (a branch of the Center for Operation of Ground-Based Space Infrastructure Facilities) and a branch of the Progress Rocket and Space Center (both enterprises are part of the Roscosmos State Corporation) completed general assembly of the Soyuz-2.1b / Frigat / OneWeb space rocket as part of mission 36.

In accordance with the prelaunch work plan, the space warhead (the Russian upper stage "Fregat" and OneWeb vehicles under the fairing) was docked yesterday with the third stage of the Soyuz-2.1b rocket. Today, this assembly has been docked to the carrier "package" (consisting of the first and second stages). At the end of the operation, the electrical connections were assembled and the pipelines for temperature control were installed.

Currently, the space rocket Soyuz-2.1b / Fregat / OneWeb is installed on the transport and installation unit before being transported to the launch complex. There are currently no comments on the preparation of the component parts. On September 10, it is planned to hold a meeting of the State Commission on the readiness to transport the rocket to the launch complex.

Recall that the launch of the Soyuz-2.1b launch vehicle with the Fregat upper stage and 34 new OneWeb spacecraft is scheduled for September 14, 2021. It will take place as part of the contracts between Glavkosmos (a subsidiary of Roscosmos) and the European launch services provider Arianespace (operator of OneWeb spacecraft launches using the Soyuz-2 rocket) and Starsem.

OneWeb spacecraft are designed to create a space communications system that provides high-speed Internet access anywhere on Earth. Internet access via the OneWeb satellite system will be provided through 40 ground-based terminal stations that will be deployed on the surface of the Earth. The OneWeb terminals will be self-contained, self-sufficient and well protected from adverse environmental factors. Each of the terminals will be able to provide high-speed Internet access in its coverage area via Wi-Fi, LTE or 5G technologies. The licensed radio frequency range will be used or, where available, the publicly available Wi-Fi, LTE or 5G radio frequency range.

https://www.roscosmos.ru/32496/

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
General assembly completed, preparing for rollout

At the #Baikonur, the Soyuz-2.1b space rocket general assembly has been completed for the
@OneWeb
 company satellites launch.

A meeting of the Commission is planned tomorrow to clear the rocket for rollout to the launch pad

https://twitter.com/roscosmos/status/1435919943644635138

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
The State Commission at the #Baikonur Cosmodrome cleared the Soyuz-2.1b carrier rocket for rollout and installation at the launch pad on September 11.

The launch of another batch of 34 #OneWeb satellite company spacecraft is scheduled for September 14

https://twitter.com/roscosmos/status/1436304793652375578

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
The state commission at the # Baikonur cosmodrome made a decision to remove the Soyuz-2.1b carrier rocket and install it at the launch site on the morning of September 11.

Launch of 34 new #OneWeb spacecraft is scheduled for September 14

https://twitter.com/roscosmos/status/1436304787948060678

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
On September 11, the launch of the Soyuz-2.1b ILV will take place at Baikonur

09/10/2021 15:25

At the Baikonur cosmodrome, a meeting of the State Commission on flight tests of spacecraft launch vehicles was held on readiness to transport the Soyuz-2.1b carrier rocket to the launch complex as part of the 36th OneWeb mission. On the eve of the assembly and testing building, the general assembly of the Soyuz-2.1b / Fregat / OneWeb space rocket took place.

The State Commission decided to export a space rocket as part of the Soyuz-2.1b carrier rocket, the Fregat upper stage and 34 OneWeb spacecraft to the launch complex of site No. 31 on the morning of September 11, 2021. The start of the transportation works is scheduled at 05:30 Moscow time (07:30 local time), after which the specialists of the subsidiaries of the State Corporation Roscosmos will start work according to the schedule of the first launch day.

The launch of 34 new spacecraft from the satellite company OneWeb is scheduled for September 14, 2021. It will become the tenth one in the OneWeb program and the fourth completed from the Baikonur cosmodrome.

https://www.roscosmos.ru/32497/

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
At Baikonur, the first starting day of the OneWeb program No. 36

09/11/2021 07:54

On Saturday, September 11, 2021, the Soyuz-2.1b carrier rocket with the Fregat upper stage and 34 OneWeb spacecraft were removed from the assembly and test building of site No. 31. Currently, the space rocket is installed at the launch complex “ Vostok "of the Baikonur cosmodrome and is preparing for the launch, which is scheduled for September 14.

At present, the specialists of the State Corporation Roscosmos are performing technological operations according to the program of the first launch day. In particular, the assembly of circuits and autonomous tests of systems and assemblies of spacecraft, the upper stage and the launch vehicle are carried out, as well as the interaction of onboard equipment and ground equipment is being checked.

Pre-launch work is being carried out within the framework of the contracts between Glavkosmos (a subsidiary of Roscosmos State Corporation) with the European provider of launch services Arianespace (operator of the OneWeb spacecraft launch) and Starsem. These works are carried out by a joint calculation of representatives of foreign customers and subsidiaries of Roscosmos: RCC "Progress", NPO Lavochkina, TsENKI and Glavkosmos.

Now the constellation of OneWeb satellites in low Earth orbit has 288 spacecraft. The upcoming launch should bring the number of OneWeb satellites in low-earth orbit to 322. OneWeb low-orbit spacecraft are designed to provide terrestrial consumers with high-speed Internet.

***

The Soyuz-2 launch vehicle was developed on the basis of the Soyuz-U serial rocket. The lead developer is the Progress Rocket and Space Center (Samara, part of Roscosmos). The missiles of the Soyuz-2 family are equipped with improved propulsion systems and modern control and measurement systems, which improves technical and operational characteristics. Structurally "Soyuz-2", like all missiles of the "Soyuz" family, is made according to the scheme of longitudinal-transverse division of rocket stages. In combination with the Fregat upper stage, it is intended for launching spacecraft into low-earth orbits of various heights and inclinations, including geo-transfer and geostationary orbits, as well as departure trajectories.

https://www.roscosmos.ru/32498/

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
Soyuz-2.1b was installed at the Baikonur launch site.

Soyuz-2.1b has been installed at the Baikonur launch site and is being prepared for launch.

08:22 11.09.2021

MOSCOW, September 11 - RIA Novosti. The Soyuz-2.1b rocket is installed at the Vostok launch complex of the Baikonur cosmodrome and is preparing for launch on September 14, according to the Roscosmos website.

"On Saturday, September 11, 2021, the Soyuz-2.1b carrier rocket with the Fregat upper stage and 34 OneWeb spacecraft were removed from the assembly and test building of site No. 31. Currently, the space rocket is installed at the launch complex "Vostok" of the Baikonur cosmodrome is preparing for the launch, which is scheduled for September 14, "the message says.

It is noted that Roscosmos specialists are now performing technological operations according to the program of the first launch day. In particular, the assembly of circuits and autonomous tests of systems and assemblies of spacecraft, the upper stage and the launch vehicle are carried out, as well as the interaction of onboard equipment and ground equipment is being checked.

It is added that the pre-launch work is being carried out within the framework of the contracts of the Glavkosmos company with the European supplier of launch services Arianespace and the Starsem company. These works are carried out by a joint calculation of representatives of foreign customers and subsidiaries of "Roscosmos": RCC "Progress", NPO Lavochkina, TsENKI and "Glavkosmos".

https://ria.ru/20210911/soyuz-1749629234.html

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
Now the #Soyuz 2.1b w/#Fregat upper stage & 34 @OneWeb satellites is installed on the launch pad of #Baikonur_Cosmodrome. We are getting ready for the launch scheduled for Sept.14!

https://twitter.com/glavkosmosJSC/status/1436562399029563392

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
We are so excited to announce our 10th #OneWeb launch on 14th September, at 14:07PM EST/ 19:07PM BST!
We will be providing further information as we approach launch, so stay tuned on our Twitter for updates and links to our livestream.

https://twitter.com/OneWeb/status/1436377680807710734

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
Second starting day at Baikonur

09/12/2021 07:02

Today, September 12, 2021, the joint settlement of subsidiaries of Roscosmos State Corporation began work on the schedule of the second launch day within the framework of the OneWeb mission No. 36. In the morning, there are heads of enterprises producing space technology, representatives of the management of Roscosmos State Corporation, companies Glavkosmos "and OneWeb.

The day before, the Soyuz-2.1b space rocket was transported to the launch site of site No. 31 of the Baikonur cosmodrome. The specialists of the Roscosmos enterprises carried out the work according to the schedule of the first launch day. Today, the active phase of preparation for the launch, which is scheduled for September 14, continues.

At the Vostok launch complex, it is planned to carry out a test set for the start-up readiness of the Fregat upper stage, as well as work in the Technological pre-launching mode. In the afternoon, general tests will be held, during which the launch and flight of the launch vehicle will be simulated, then the telemetry information will be analyzed.

***

Upper stage "Fregat" produced by the Scientific and Production Association named after S.А. Lavochkin (part of the State Corporation "Roscosmos") ensures the effective implementation of all tasks to launch one or more spacecraft into working orbits or trajectories departing from the Earth. The entire process of launching is carried out autonomously, without interference from the Earth. The highest reliability, the possibility of launching from four cosmodromes and, practically, the ideal launching accuracy, give the upper stage an undeniable competitive advantage over world analogues.

The basis of the structural layout of the upper stage is a block of tanks, built according to a monoblock carrier scheme. It has a torispherical configuration, consisting of six spherical containers welded together, separated by spherical bottoms. Four of them are oxidizer and fuel tanks, two tanks are compartments for onboard instruments and equipment.

https://www.roscosmos.ru/32499/

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
Today the specialists of the # Baikonur cosmodrome have started work according to the schedule of the second launch day as part of the #OneWeb mission . At the Vostok launch complex, it is planned to carry out a control set for the launch readiness of the Fregat upper stage, as well as to undergo general tests.

https://twitter.com/roscosmos/status/1436929372649308161

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
Reserve day in preparation for the launch of the OneWeb spacecraft

09/13/2021 09:30

At the Baikonur cosmodrome, preparations are continuing for the launch of the Soyuz-2.1b launch vehicle with the Fregat upper stage and 34 new spacecraft from the OneWeb satellite company. On September 13, 2021, the joint settlement of the State Corporation Roscosmos began to perform reserve day operations.

The day before, work was carried out according to the schedule of the second launch day, which successfully ended with general tests - checking the functioning of the launch complex systems with imitation of the launch vehicle detachment and its flight. The main content of the work today and the first half of the day on September 14 is the thermostating of the naphthyl product in the 11G133 automobile refueling unit.

On Tuesday, a meeting of the State Commission will take place, following which decisions will be made on refueling the launch vehicle and launching it at the appointed time. The launch of the Soyuz-2.1b carrier rocket with the Fregat upper stage and 34 OneWeb spacecraft is scheduled for September 14, 2021 at 21:07 Moscow time.

https://www.roscosmos.ru/32538/

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
At Baikonur, preparations are underway for launch on September 14. Today at the cosmodrome - a reserve day: https: // roscosmos.ru/32538/ The

day before, work was carried out according to the schedule of the second launch day, which ended with general tests of the launch vehicle.

https://twitter.com/roscosmos/status/1437303083277684739

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
Our #OneWebLaunch10 mission patch - Ideas For The Next Generation!

Launch 10 celebrates our eye to the future and drive to continue working with mission partners towards a strong network, responsibly and sustainably benefiting everyone on Earth.

https://twitter.com/OneWeb/status/1437461076602494985

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
Who’s excited for our 10th #OneWebLaunch? We will be going LIVE today from 13:57PM EST/ 18:57PM BST, so tune in to see the launch in action.

https://twitter.com/OneWeb/status/1437732861663080449

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
#OneWeb : The State Commission made a decision to refuel the Soyuz-2.1b launch vehicle with propellants and launch, which is scheduled at 21:07:19 Moscow time on September 14.

At Baikonur, the weather is good and clear, which means the live broadcast will begin at 20:00 Moscow time. Do not miss!

https://twitter.com/roscosmos/status/1437781259804160009

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
#OneWeb: The State Commission confirmed the scheduled lift-off time of the Soyuz-2.1b launch vehicle (at 18:07:19 UTC) and gave the go-ahead to loading the launch vehicle with propellants The live broadcast will begin at 17:00 UTC. Don't miss it!

https://twitter.com/roscosmos/status/1437781296584052737

Offline Rondaz

  • Senior Member
  • *****
  • Posts: 27059
  • Liked: 5301
  • Likes Given: 169
The State Commission approved the launch time of the Soyuz-2.1b ILV from 34 spacecraft OneWeb

09/14/2021 17:13

At the Baikonur cosmodrome, a meeting of the State Commission took place, at which the issues of the readiness of the space rocket as part of the Soyuz-2.1b launch vehicle with the Fregat upper stage and 34 OneWeb vehicles within the framework of mission No. 36 were considered. Based on the test results, the commission made a decision to refuel the launch vehicle and launch at 21:07:19 Moscow time on September 14, 2021.

In accordance with the prelaunch work plan, the specialists of the State Corporation "Roscosmos" begin operations for refueling the rocket with propellant components: at 17:35 - refueling the "package" (1st and 2nd stages) with kerosene, 18:10 - refueling the product with liquid oxygen, 18:20 - cooling and filling the "package" with liquid nitrogen, 18:40 and 19:10 - filling the ERW package and equalizing the ERW, respectively, 19:05 - filling the 14С54 unit with the "naphthyl" product, 19:50 - drainage of the filling hoses and communications of the "naphthyl" product ... After that, at the Vostok launch complex, the final pre-launch operations will begin, the undocking of the mobile filling units from the filling stations and electric dispensers and the evacuation from the “0” mark.

Watch the live broadcast of prelaunch operations, launch and flight of the launch vehicle on the official pages of the State Corporation Roscosmos in social networks and in the section " Live broadcasts " from 20:00 Moscow time on September 14, 2021.

https://www.roscosmos.ru/32553/

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1