-
LIVE: PSLV XL (C32) - IRNSS-1F - SLP, March 10 2016
by
beidou
on 27 Mar, 2015 19:17
-
This will be the 6th satellite of IRNSS .
-
#1
by
vyoma
on 30 May, 2015 04:59
-
-
#2
by
Ohsin
on 30 May, 2015 05:33
-
-
#3
by
vyoma
on 13 Oct, 2015 13:49
-
Payload ready:
After Successful Test & Evaluation, IRNSS-1F Payload was delivered to ISITE/ISAC on September 10, 2015 for integration with Spacecraft.
-
#4
by
beidou
on 07 Jan, 2016 19:23
-
-
#5
by
Steven Pietrobon
on 07 Jan, 2016 23:44
-
-
#6
by
beidou
on 23 Jan, 2016 23:50
-
Do we have an approximate launch date for this mission?
-
#7
by
input~2
on 27 Jan, 2016 20:00
-
-
#8
by
Ohsin
on 26 Feb, 2016 21:19
-
PSLV-C32/IRNSS-1F NOTAM is out! Launch pad coords are same from last one so SLP again.
A0434/16 - PSLV-C32 ROCKET LAUNCH FM SHAR RANGE, SRIHARIKOTA AS PER FLW DETAILS.THE LAUNCH WILL BE ON ANY ONE OF THE DAY DRG THIS PERIOD.ACTUAL DATE OF LAUNCH WILL BE INTIMATED 24 HR IN ADVANCE THRU A SEPARATE NOTAM. LAUNCH PAD COORD: 1343.2N 08013.8E NO FLT IS PERMITTED OVER THE DNG ZONE. A. DNG ZONE-1 A CIRCLE OF 10NM AROUND THE LAUNCHER B. DNG ZONE-2 A RECTANGULAR AREA BOUNDED BY: 1330N 08030E 1350N 08035E 1335N 08135E 1315N 08130E C. DNG ZONE-3 A RECTANGULAR AREA BOUNDED BY: 1300N 08210E 1330N 08215E 1305N 08415E 1235N 08410E D. DNG ZONE-4 A RECTANGULAR AREA BOUNDED BY: 1230N 08415E 1310N 08425E 1255N 08520E 1215N 08510E E. DNG ZONE-5 A RECTANGULAR AREA BOUNDED BY: 1125N 08825E 1205N 08835E 1145N 08935E 1105N 08925E F. DNG ZONE-6 A RECTANGULAR AREA BONDED BY: 0935N 09450E 1030N 09505E 1015N 09555E 0920N 09540E G. DNG ZONE-7 A RECTRANGULAR AREA BOUNDED BY 1830S 13400W 1630S 13400W 1300S 11200W 0800S 09200W 1000S 09200W 1500S 11200W ROUTES AFFECTED IN CHENNAI FIR: N571, N877, P761, W20, A465, P628, L518, Q10, Q11, V3, V4, V9 AND V11. END PART 1 OF 2. 0830-1230, 10 MAR 08:30 2016 UNTIL 09 APR 12:30 2016. CREATED: 26 FEB 07:05 2016
A0434/16 - CLOSURE/ALTN ROUTINGS: 1) N571 NOT AVBL BTN DORAM AND BIKEN ALTN RTE: DORAM-DCT-MMV VOR-DCT-BIKEN-N571 (BIDIRECTIONAL) 2) N877 NOT AVBL BTN LAGOG AND ORARA ALTN RTE: LAGOG- DCT- POINT Z 1200N 08951E-DCT ORARA (BIDIRECTIONAL) 3) P761 NOT AVBL MMV VOR AND PPB VOR ALTN RTE: MMV VOR-DCT-BIKEN-P762 -PPB VOR (BIDIRECTIONAL) 4) W20 NOT AVBL BTN MMV VOR AND BODEL ALTN RTE: MMV VOR-TR319/139DEG-53NM-TTP VOR-TR357/177DEG-81NM-BODEL (BIDIRECTIONAL) 5) A465 NOT AVBL BTN MMV VOR AND DOKET ALTN RTE: MMV VOR-TR319/139DEG-DIST 53NM-TTP VOR-TR034/214DEG-DIST 54NM- POINT A (142225N 0800303E)-TR057/237DEG-126NM-DCT- DOKET-A465 (BIDIRECTIONAL) 6) P628 NOT AVBL BTN IGREX AND PPB VOR (DUE DNG ZONE-6) ALTN RTE: EMRAN-DCT-AGEGA-DCT-PPB VOR (WESTBOUND ONLY) 7) L518, Q10, Q11, V3, V4, V9, V11 NOT AVBL 8 ) CTC NR OF WATCH SUPERVISORY OFFICER, CHENNAI (NODAL COORDINATOR) 00-91-4422560894/00-91-9840987941/00870762092877. GND - UNL) END PART 2 OF 2, 0830-1230, 10 MAR 08:30 2016 UNTIL 09 APR 12:30 2016. CREATED: 26 FEB 07:05 2016
https://www.google.com/maps/d/viewer?mid=znec8zR19TsY.kmrRifwvWDak
-
#9
by
input~2
on 29 Feb, 2016 06:05
-
PSLV-C32/IRNSS-1F NOTAM is out! Launch pad coords are same from last one so SLP again.
Thanks!
Well, the zones are marginally different but the launch pad coordinates are the same, so yes SLP again
A0434/16 - PSLV-C32 ROCKET LAUNCH FM SHAR RANGE, SRIHARIKOTA AS PER FLW DETAILS.THE LAUNCH WILL BE ON ANY ONE OF THE DAY DRG THIS PERIOD.ACTUAL DATE OF LAUNCH WILL BE INTIMATED 24 HR IN ADVANCE THRU A SEPARATE NOTAM.
LAUNCH PAD COORD: 1343.2N 08013.8E [..]From SLP's NOTAM (PSLV C27/C31): LAUNCH PAD COORD:
1343.2N 08013.8E From FLP's NOTAM (PSLV C26): LAUNCH PAD COORD:
1343.9N 08014.2E
-
#10
by
Ohsin
on 01 Mar, 2016 17:08
-
PSLV-C32/IRNSS-1F launch is scheduled at 16:00 hrs IST (afternoon 4:00pm) on Thursday, March 10, 2016 from Satish Dhawan Space Centre, SHAR.
10 March 1030 UTC
Source:
http://maadhyam.isro.gov.in/
-
#11
by
Ohsin
on 04 Mar, 2016 16:05
-
PSLV C32 / IRNSS-1F Flight Brochure. Going for 32.5°E spot.
-
#12
by
Ohsin
on 04 Mar, 2016 16:12
-
-
#13
by
seshagirib
on 05 Mar, 2016 05:40
-
^^Looks like no fourth stage restart this time..
-
#14
by
input~2
on 06 Mar, 2016 11:59
-
MRR (mission readiness review) will be held on Monday March 7
(
source in Telugu)
-
#15
by
Ohsin
on 08 Mar, 2016 03:01
-
Mar 08, 2016
PSLV-C32/IRNSS-1F UPDATE: Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 54 and half hr countdown starting at 09:30hr IST on Tuesday, March 8, 2016 and the launch for March 10, 2016
Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 54 and half hr countdown starting at 09:30hr IST on Tuesday, March 8, 2016 and the launch of PSLV-C32/IRNSS-1F Mission for Thursday, March 10, 2016 at 16:00hr IST
http://www.isro.gov.in/update/08-mar-2016/pslv-c32-irnss-1f-update-mission-readiness-review-mrr-committee-and-launch
-
#16
by
seshagirib
on 08 Mar, 2016 05:02
-
-
#17
by
Ohsin
on 08 Mar, 2016 10:26
-
-
#18
by
Chris Bergin
on 09 Mar, 2016 19:50
-
So are we saying this will result in IRNSS reaching operational capacity?
-
#19
by
sanman
on 09 Mar, 2016 22:53
-
So are we saying this will result in IRNSS reaching operational capacity?
IRNSS requires 7 satellites to be operational, and this one will be the sixth