-
#140
by
Steven Pietrobon
on 28 Sep, 2015 04:53
-
Astrosat separation!
T+23 minutes.
-
#141
by
Chris Bergin
on 28 Sep, 2015 04:53
-
LAPAN-A2 S/C Sep.
-
#142
by
Steven Pietrobon
on 28 Sep, 2015 04:53
-
-
#143
by
Chris Bergin
on 28 Sep, 2015 04:53
-
NLS-14 S/C Sep.
-
#144
by
Steven Pietrobon
on 28 Sep, 2015 04:54
-
NSL-14 separation!
T+25 minutes.
-
#145
by
zubenelgenubi
on 28 Sep, 2015 04:54
-
It was interesting watching the 4th stage yaw steering in action--watching the orbital inclination readout drop.
-
#146
by
Steven Pietrobon
on 28 Sep, 2015 04:55
-
-
#147
by
savuporo
on 28 Sep, 2015 04:55
-
-
#148
by
Steven Pietrobon
on 28 Sep, 2015 04:55
-
-
#149
by
Steven Pietrobon
on 28 Sep, 2015 04:56
-
-
#150
by
Steven Pietrobon
on 28 Sep, 2015 04:56
-
Lemur-4 separation. Mission success!
-
#151
by
Chris Bergin
on 28 Sep, 2015 04:57
-
-
#152
by
Steven Pietrobon
on 28 Sep, 2015 04:57
-
-
#153
by
Steven Pietrobon
on 28 Sep, 2015 04:58
-
SDSC-SHAR Director.
30th consecutive successful mission.
-
#154
by
Steven Pietrobon
on 28 Sep, 2015 05:01
-
Mission Director. "ISRO has done it again."
-
#155
by
vyoma
on 28 Sep, 2015 05:01
-
ASTROSAT had called for very tight environmental and contamination control in all ISRO center - from satellite assembly to integration with rocket.
51 commercial/foreign satellites launched by PSLV till date.
PSLV-C29 getting ready to launch 6 satellites from Singapore.
3 consecutive monthly missions from SDSC SHAR!
-
#156
by
Steven Pietrobon
on 28 Sep, 2015 05:04
-
Satellite Director. 644x651 km orbit. Satellite is doing fine. Solar arrays deployed.
-
#157
by
Steven Pietrobon
on 28 Sep, 2015 05:06
-
-
#158
by
Steven Pietrobon
on 28 Sep, 2015 05:08
-
PSLV Director.
ISAC Director.
-
#159
by
Steven Pietrobon
on 28 Sep, 2015 05:09
-