Aug. 15, 2006
Grey Hautaluoma
Headquarters, Washington
202-358-0668
James Hartsfield
Johnson Space Center, Houston
281-483-5111
MEDIA ADVISORY: M06-130
NASA ANNOUNCES SPACE STATION ASSEMBLY-CHALLENGES INTERVIEWS
As the space shuttle prepares to resume the International Space
Station's construction this month, Mission Operations Space Shuttle
Manager Paul Hill is available by satellite 7 to 9 a.m. EDT Friday,
Aug. 18, to discuss the job ahead. Media interested in interviewing
Hill should contact Debbie Sharp at 281-483-4942 no later than 5 p.m.
EDT Thursday, Aug. 17.
With intricate robotics, frequent spacewalks and the assembly of huge
components, the series of flights to complete the station over the
next four years will be as challenging and complex as any in space
history. Those flights begin with the launch of the Space Shuttle
Atlantis on mission STS-115 as early as Aug. 27. Managers are meeting
this week to set the final launch date.
Hill manages NASA's support for shuttle operations, including the
planning, training and conduct of all missions by the flight crew and
Mission Control, Houston. To complete station assembly, NASA will
perform more spacewalks than in all prior spaceflights. Almost
one-half million pounds of new components will be launched. The
station's electrical power will quadruple, and its living space will
double, equaling that of a five-bedroom house. More than 100 flights
by five types of spacecraft, launched from four nations, will have
helped build the complex.
During Atlantis' mission, a 17.5-ton, bus-sized segment will be added
to the station's girder-like truss backbone. The new piece will
include a second set of giant solar arrays, batteries and associated
electronics. The crew will perform three spacewalks to hook up the
new pieces and prepare them for operation.
Late this year, another shuttle flight will rewire the orbiting
complex -- without interrupting the power flow to any systems -- to
bring the new electrical supplies online. Early next year, a third
mission will install another set of solar arrays, batteries and
electronics.
Those missions will set the stage for the addition of new laboratories
from Europe and Japan, which will far surpass any previous research
capability in space.
The interviews with Hill will be carried live on the NASA TV Media
Channel and analog satellite. The analog coordinates are: AMC-6, at
72 degrees west longitude, transponder 5C, 3800 MHz, vertical
polarization, with audio at 6.8 MHz. The Media Channel is available
on an MPEG-2 digital C-band signal via satellite AMC-6, 72 degrees
west longitude, transponder 17C, 4040 MHz, vertical polarization. In
Alaska and Hawaii, it's on AMC-7, 137 degrees west longitude,
transponder 18C, at 4060 MHz, horizontal polarization.
For NASA TV streaming video, scheduling and digital downlink
information, visit:
http://www.nasa.gov/ntvFor information about STS-115 and its crew, visit:
http://www.nasa.gov/shuttle-end-