[..] (like Joe's Rockets "R" Us) could respond. [..]
Increasing thrust while not increasing vehicle mass will increase stresses at maxQ, while only delivering a relatively small payload increase.
Those increased stresses might be a concern. Agree it would be helpful to demonstrate early to avoid any doubt.
It's wider than that. The ULA factory has a a certain "standard" level of production where all costs are at a minimum. That's the number of cores/year where no one is idle, there are no left over alloy plates to store etc.
IRL neither policy is fair. I believe there is a block buy size where ULA makes out and the USAF gets a lower unit price. But 36 cores is way too high unless the factory was designed for a huge production volume (I mean 2 a month or more).
It's wider than that. The ULA factory has a a certain "standard" level of production where all costs are at a minimum. That's the number of cores/year where no one is idle, there are no left over alloy plates to store etc.
This block buy is not a change in the number of launches the Air Force wants to do, so the factory production rate doesn't change. All we're talking about here is how they buy their material.
For instance, ULA has a pretty good idea what their customers future needs are, and they can forecast what launchers will be needed. However, for many reasons, ULA only buys the amount of material needed to cover just the orders that the government places, which until now has been either single launches or maybe small lots. So when they go to buy the material for that order (let's say it's one Delta IV), then they are buying one RS-68 from Aerojet Rocketdyne and only getting the 1ea price for it. From a risk standpoint this makes sense, since they are fully covered in termination coverage in case the government were to stop buying ULA launches.
Until now the risk has been pretty low for ULA to buy large lots of material on their own, but in the world of government procurement that is not necessarily the best business practice, so they had no real incentive to do that. I was in this world, so I know how it works.QuoteIRL neither policy is fair. I believe there is a block buy size where ULA makes out and the USAF gets a lower unit price. But 36 cores is way too high unless the factory was designed for a huge production volume (I mean 2 a month or more).
And again, the block buy was not in response to an increase in production, but an attempt to implement common sense procurement strategies that result in a lower overall cost to the customer (i.e. the U.S. Government).

I don't doubt that ULA has a pretty good idea of what the DoD would like to launch...
My point was that the policy of one-launch-at-a-time was not fair on ULA for an efficiency PoV.
As you said the one off price of an RD180 is $Xm but buy them in Y sized lots and the price goes down. A block buy would safely allow ULA to buy those quantities knowing they would be used, but I cannot believe it needs a 36 core buy to deliver those savings.
I think we are in violent agreement.
. But 36 cores is way too high unless the factory was designed for a huge production volume (I mean 2 a month or more).
2) When not throttled down, the engines get couple of seconds better isp, which also helps
. But 36 cores is way too high unless the factory was designed for a huge production volume (I mean 2 a month or more).
It was designed for 40 per year
Would that be the single shift 5 days a week with no over time figure or the 24/7 with any absences covered by staff agencies?
this thread takes things in another direction.
http://forum.nasaspaceflight.com/index.php?topic=34558.0
No bearing on this thread, U.S. gov't payloads launch on U.S. rockets only.
The facility was designed for it
this thread takes things in another direction.
http://forum.nasaspaceflight.com/index.php?topic=34558.0
No bearing on this thread, U.S. gov't payloads launch on U.S. rockets only.agreed, I set the new thread up to talk "commercial payloads". This is for government payloads.
This is specifically the kind of stuff that Musk is likely peeved about. ULA never had to qualify a rocket configuration on 3 flights before being able to use it for government launches.
Because the USAF was intimately involved with Atlas and Delta development. They know what processes went into the design and testing of the vehicles. And the USAF would design and testing standards as part of the procurement process. The USAF has never bought a COTS launch vehicle before. In the 90's, when NASA started buying launch services and start putting out procurement solicitations, they realized that anybody (like Joe's Rockets "R" Us) could respond. So that is where the concept of certification came about. That is where the 14, 3 and 1 flights come from with the different amounts of insight penetration.
I'd say that SpaceX needs to get cracking on the certification flights.
I'd say that SpaceX needs to get cracking on the certification flights.
John, the certification requires 3 flights of the exact configuration that DoD would use. SpaceX has actually flown that configuration 4 times now, 3 times before the block buy signed contract was announced. That was the hard part. Everything is done, I believe, but the mountain of paperwork. Without the paperwork, which is the easy part, the certification is not completed. That is "part" of what has Elon upset.
And, without a redesign, while the expansion ratio would be higher...
Going forward, what is the engine plan for this block buy... Will the stockplile of RD180'suffice? Will they be allowed to buy more? Where is "this exact engine"they claim to have demonstrated they can build?
My issue from the beginning has been the whole concept of a "Core buy". It's such a ridiculous way to communicate what the product/service is. They're not buying 12 "Cores", they are buying 4 DHs to get their payloads to their intended destinations. It's not 24 cores, it's 24 AVs. (And yes, all the accompanying mission assurance costs, integration costs, etc...)
You don't buy cores, unless you plan on decorating your Hangar with nice metallic tubes on the walls instead of curtains. You buy a product / service to deliver your payload to it's intended destination. But no, that's too simple, it has to be complicated and technical sounding. I call BS once and for all.
Nothing but nonsense.