-
#160
by
Steven Pietrobon
on 27 Aug, 2015 11:36
-
T+14 minutes. In a low orbit.
-
#161
by
Steven Pietrobon
on 27 Aug, 2015 11:37
-
-
#162
by
antriksh
on 27 Aug, 2015 11:38
-
Almost reached orbital Velocity
-
#163
by
Zaran
on 27 Aug, 2015 11:38
-
Cryo stage burns in augmented mode (11 % of nominal) for the first 4 mins to put a heavier payload in orbit
Is that 11% of nominal thrust, 111% of nominal or 89% of nominal? Augmented seems to imply 111%?
It's got to be 111%, its only a 75 kN engine after all, running at 7.5 kN would not help putting heavy payloads into orbit.
-
#164
by
Steven Pietrobon
on 27 Aug, 2015 11:38
-
-
#165
by
Steven Pietrobon
on 27 Aug, 2015 11:39
-
Engine cutoff and spacecraft separation!
-
#166
by
Chris Bergin
on 27 Aug, 2015 11:39
-
-
#167
by
antriksh
on 27 Aug, 2015 11:40
-
-
#168
by
Steven Pietrobon
on 27 Aug, 2015 11:41
-
What happened in last flight was no fluke.
-
#169
by
Chris Bergin
on 27 Aug, 2015 11:41
-
-
#170
by
Steven Pietrobon
on 27 Aug, 2015 11:42
-
-
#171
by
Chris Bergin
on 27 Aug, 2015 11:43
-
HA!
"The naughty boy has been tamed"
-
#172
by
Steven Pietrobon
on 27 Aug, 2015 11:44
-
The naughty boy of ISRO has been tamed.
-
#173
by
antriksh
on 27 Aug, 2015 11:46
-
Next Launch of GSLV June-July
-
#174
by
Steven Pietrobon
on 27 Aug, 2015 11:47
-
-
#175
by
antriksh
on 27 Aug, 2015 11:48
-
GSLV mk 2 now in OPERATIONAL phase
-
#176
by
antriksh
on 27 Aug, 2015 11:49
-
Next month same day PSLV launch!
-
#177
by
Steven Pietrobon
on 27 Aug, 2015 11:50
-
-
#178
by
Steven Pietrobon
on 27 Aug, 2015 11:53
-
LPSC Director. Really mastered cryogenic technology.
-
#179
by
antriksh
on 27 Aug, 2015 11:53
-
C-25 development on track! LPSC Director