-
#120
by
Steven Pietrobon
on 27 Aug, 2015 11:19
-
-
#121
by
antriksh
on 27 Aug, 2015 11:20
-
-
#122
by
Chris Bergin
on 27 Aug, 2015 11:20
-
-
#123
by
Steven Pietrobon
on 27 Aug, 2015 11:20
-
-
#124
by
Chris Bergin
on 27 Aug, 2015 11:21
-
T-60 seconds.
-
#125
by
Steven Pietrobon
on 27 Aug, 2015 11:21
-
T-1 minute. Mass of CU has been optimised.
-
#126
by
vyoma
on 27 Aug, 2015 11:21
-
GSLV D6 cryo stage dry mass has been optimized and reduced, compared to that of GSLV D5.
-
#127
by
Steven Pietrobon
on 27 Aug, 2015 11:22
-
-
#128
by
Chris Bergin
on 27 Aug, 2015 11:23
-
-
#129
by
Steven Pietrobon
on 27 Aug, 2015 11:23
-
-
#130
by
Chris Bergin
on 27 Aug, 2015 11:24
-
It all went very quiet for a moment there, but all is nominal!
-
#131
by
Steven Pietrobon
on 27 Aug, 2015 11:24
-
T+2 minutes. Solid stage has burnt out.
-
#132
by
antriksh
on 27 Aug, 2015 11:25
-
-
#133
by
Chris Bergin
on 27 Aug, 2015 11:25
-
Good booster sep.
Staging 1-2.
-
#134
by
Steven Pietrobon
on 27 Aug, 2015 11:25
-
First stage separation. Second stage ignition.
T+3 minutes.
-
#135
by
Chris Bergin
on 27 Aug, 2015 11:26
-
Fairing jettison.
-
#136
by
antriksh
on 27 Aug, 2015 11:26
-
Second Stage performance normal
-
#137
by
Chris Bergin
on 27 Aug, 2015 11:26
-
Second stage performance is nominal.
-
#138
by
Steven Pietrobon
on 27 Aug, 2015 11:26
-
Payload fairing separation.
T+4 minutes.
-
#139
by
antriksh
on 27 Aug, 2015 11:27
-
Close match with preflight plan