-
#60
by
Satori
on 14 Feb, 2014 20:00
-
Turksat Satellite Communication, Cable TV and Operation A.S. gives the verbal readiness on countdown network.
-
#61
by
Chris Bergin
on 14 Feb, 2014 20:03
-
First ILS launch for these guys.
-
#62
by
Satori
on 14 Feb, 2014 20:03
-
At T-5m The LV GN&C GLSTE will send a T-300 sec command signal to the Briz-M GN&C GLSTE to synchronize the lift-off time. Briz-M will begin transfer to internal power.
-
#63
by
Satori
on 14 Feb, 2014 20:04
-
T-5m All looks good for launch...
-
#64
by
Chris Bergin
on 14 Feb, 2014 20:05
-
Notable the promo videos don't show the satellite. The tech is apparently proprietary - well at least one side of the bird.
-
#65
by
Chris Bergin
on 14 Feb, 2014 20:06
-
Well there's a graphic of her at least.
-
#66
by
Satori
on 14 Feb, 2014 20:07
-
T-120 seconds... LV GN&C begins transfer to internal power. Briz-M completes transfer to internal power,
sends “BRIZ-M GO” signal to LV GN&C GLSTE.
-
#67
by
Satori
on 14 Feb, 2014 20:08
-
At T-3.1 seconds... LV GN&C GLSTE performs a final GO/NO-GO check of the LV, Breeze M and SC. If all the
integrated LV components are GO, the first stage ignition sequence start is sent at the estimated time.
-
#68
by
Satori
on 14 Feb, 2014 20:09
-
LAUNCH!!!!
-
#69
by
Satori
on 14 Feb, 2014 20:10
-
-
#70
by
Chris Bergin
on 14 Feb, 2014 20:10
-
-
#71
by
Chris Bergin
on 14 Feb, 2014 20:11
-
-
#72
by
Satori
on 14 Feb, 2014 20:11
-
-
#73
by
Satori
on 14 Feb, 2014 20:12
-
Second stage is operating well
-
#74
by
Chris Bergin
on 14 Feb, 2014 20:12
-
Confirmation of 1-2 Staging. Second stage firing.
-
#75
by
Chris Bergin
on 14 Feb, 2014 20:15
-
Nice dawn photo (traditional rollout time) for the Proton-M.
-
#76
by
Satori
on 14 Feb, 2014 20:15
-
-
#77
by
Satori
on 14 Feb, 2014 20:15
-
And we also have fairing separation...
-
#78
by
Satori
on 14 Feb, 2014 20:19
-
-
#79
by
Satori
on 14 Feb, 2014 20:21
-
And we are on the first of five Briz-M burns...