Also, I watched the CASSIOPE launch in person at VAFB and I could see the RCS thruster pulses from the first stage after stage separation through my small binoculars. That was in full daylight, so it definitely wasn't just twilight conditions that made that visible for SES-8.
I heard that Thaicom-6 had been shipped but has it arrived at the Cape yet? If so, is it at SLC-40 or is it still at the pre-integration processing (Astrotech?)?
My opinion is this is indicative of horse-trading going on behind the scenes between SpaceX and the Eastern Range about maybe squeezing in the launch in the last few days of the year.
Sometimes the lack of something is evidence of something else. In this case, no announced date speaks to just how much they want to squeeze in another go before 2013 is out. Otherwise, they'd just grab any date they could in January and move on. Of course: IMO.
Well the SpaceX engineers in Florida do have to make all of the hardware mods needed/discovered during the Cassiope and SES-8 campaigns. None of the fixes for those mods could have trickled back to Hawthorne and been incorporated into the production vehicles in time for Thiacom. In fact, how long do we think any/all mods needed for problems discovered at a particular launch will take to work their way into production? I know, it depends. But I'm asking about Falcon 9 v1.1, both stages, and more particularly about Cassiope, SES-8 and Thiacom - 6.Maybe this post should be in a SpaceX General Section thread?
Quote from: aero on 12/18/2013 12:29 amWell the SpaceX engineers in Florida do have to make all of the hardware mods needed/discovered during the Cassiope and SES-8 campaigns. None of the fixes for those mods could have trickled back to Hawthorne and been incorporated into the production vehicles in time for Thiacom. In fact, how long do we think any/all mods needed for problems discovered at a particular launch will take to work their way into production? I know, it depends. But I'm asking about Falcon 9 v1.1, both stages, and more particularly about Cassiope, SES-8 and Thiacom - 6.Maybe this post should be in a SpaceX General Section thread?Other then second stage hardware mods for engine restart, which I imagine would already have been worked into Thiacom 2nd stage, what other "hardware mods" are we talking about? There was some GSE clean-up needed but I"m not aware of additional F9 design issues that would require serious hardware mods?
Have a wild idea. If the ISS cooling issues requires a contingency flight to bring up EMUs, parts, etc. Can SpaceX refurbished a used Dragon and use the Thiacom 6 LV & the CRS-3 Dragon trunk for such a flight?
Quote from: Zed_Noir on 12/18/2013 05:46 pmHave a wild idea. If the ISS cooling issues requires a contingency flight to bring up EMUs, parts, etc. Can SpaceX refurbished a used Dragon and use the Thiacom 6 LV & the CRS-3 Dragon trunk for such a flight? What is wrong with the existing CRS-3 Dragon?