-
#480
by
Chris Bergin
on 18 Oct, 2016 19:42
-
-
#481
by
Chris Bergin
on 18 Oct, 2016 19:42
-
-
#482
by
Phillip Clark
on 18 Oct, 2016 19:46
-
I have noted throughout the Chinese commentary that they talk about *five* previous orbital dockings, although Shenzhous 8, 9 and 10 each performed two dockings. I assume that they are talking about only automatic dockings - plus one manual docking.
-
#483
by
Satori
on 18 Oct, 2016 19:47
-
Looks like the pressure between the two vehicles is stabilized.
-
#484
by
Infinitesky
on 18 Oct, 2016 19:51
-
As far as I remember, CCTV is using this music for the Chinese manned space missions.
Positive Outlook by Diavid Hoffner.
They use this music for all of the space launch with great significance.
(Lunar Exploration Project, Manned spaceflight, launch of new generation rocket etc.)
-
#485
by
Chris Bergin
on 18 Oct, 2016 19:56
-
Still looking at around 22:00 UTC for ingress?
-
#486
by
PahTo
on 18 Oct, 2016 20:07
-
Excellent coverage--thanks Rui and NSF--and congrats to the SZ11 and TG2 team(s) for the success!
-
#487
by
Satori
on 18 Oct, 2016 21:17
-
At this time the two taikonauts are still in the process of changing from the launch and entry suits to the more comfortable blue working suits.
-
#488
by
lucspace
on 18 Oct, 2016 21:26
-
CCTV correspondent at mission control reports the subsatellite to photograph the S11-TG2 complex will be released in four day's time.
-
#489
by
Zero-G
on 18 Oct, 2016 21:28
-
CCTV correspondent at mission control reports the subsatellite to photograph the S11-TG2 complex will be released in four day's time.
... and it is planned to fly in about 1 km distance of the SZ-11/TG-2 complex.
-
#490
by
Satori
on 18 Oct, 2016 21:34
-
Jing Haipeng with the blue working suit.
-
#491
by
Satori
on 18 Oct, 2016 21:35
-
External camera on SZ-11 and internal camera on TG-2.
-
#492
by
Satori
on 18 Oct, 2016 21:36
-
One of the three hatches was already open between SZ-11 and TG-2.
-
#493
by
Satori
on 18 Oct, 2016 21:38
-
The second hatch can now be open.
-
#494
by
Satori
on 18 Oct, 2016 21:39
-
-
#495
by
Zero-G
on 18 Oct, 2016 21:40
-
One of the three hatches was already open between SZ-11 and TG-2.
This is actually the hatch between the SZ-11 command and orbital modules.
-
#496
by
Satori
on 18 Oct, 2016 21:41
-
-
#497
by
Satori
on 18 Oct, 2016 21:41
-
Jing Haipeng in the orbital module of SZ-11.
-
#498
by
Satori
on 18 Oct, 2016 21:42
-
Chen Dong at the return module and Jing Haipeng on the orbital module of SZ-11.
-
#499
by
Satori
on 18 Oct, 2016 21:43
-
Both crew members on the orbital module.