-
#120
by
Steven Pietrobon
on 30 Jun, 2014 04:29
-
-
#121
by
ss1_3
on 30 Jun, 2014 04:29
-
Coasting started.
-
#122
by
antriksh
on 30 Jun, 2014 04:30
-
-
#123
by
vyoma
on 30 Jun, 2014 04:30
-
-
#124
by
input~2
on 30 Jun, 2014 04:30
-
-
#125
by
Steven Pietrobon
on 30 Jun, 2014 04:30
-
-
#126
by
AJA
on 30 Jun, 2014 04:31
-
Huh.. another kink in that plot, around the time of PS-3 sep/ PS-4 ignition
PS-3 separated. PS-4 ignition confirmed. PS-4 performance normal
-
#127
by
input~2
on 30 Jun, 2014 04:31
-
-
#128
by
ss1_3
on 30 Jun, 2014 04:32
-
PS3 separated. PS4 ignited.
-
#129
by
antriksh
on 30 Jun, 2014 04:32
-
-
#130
by
vyoma
on 30 Jun, 2014 04:32
-
PS4 ignited. PS4 performance normal.
-
#131
by
Steven Pietrobon
on 30 Jun, 2014 04:32
-
PS3 separation. PS4 ignition.
-
#132
by
input~2
on 30 Jun, 2014 04:35
-
-
#133
by
Steven Pietrobon
on 30 Jun, 2014 04:35
-
-
#134
by
antriksh
on 30 Jun, 2014 04:36
-
-
#135
by
AJA
on 30 Jun, 2014 04:36
-
Waiting for PS-4 shutdown and payload injection.
Apparently, ISTRAC conduct a month-long network simulation with all the real-time tracking stations right up to the date of launch, to ensure seamless telemetry reception.
-
#136
by
Steven Pietrobon
on 30 Jun, 2014 04:36
-
-
#137
by
antriksh
on 30 Jun, 2014 04:37
-
-
#138
by
input~2
on 30 Jun, 2014 04:37
-
-
#139
by
vyoma
on 30 Jun, 2014 04:38
-