-
#160
by
jacqmans
on 18 Nov, 2013 14:43
-
-
#161
by
psloss
on 18 Nov, 2013 14:49
-
Reached the hold at T-2 hours ahead of tanking the vehicle.
-
#162
by
Chris Bergin
on 18 Nov, 2013 14:57
-
-
#163
by
Targeteer
on 18 Nov, 2013 14:57
-
NASA TV coverage starts at the top of the hour
-
#164
by
Targeteer
on 18 Nov, 2013 15:00
-
Cue the dramatic music and awesome graphics as coverage starts
-
#165
by
Chris Bergin
on 18 Nov, 2013 15:00
-
-
#166
by
Chris Bergin
on 18 Nov, 2013 15:01
-
T-2 hours and holding. L-150 mins.
-
#167
by
Artyom.
on 18 Nov, 2013 15:01
-
NASA TV coverage started now

!
-
#168
by
Chris Bergin
on 18 Nov, 2013 15:02
-
-
#169
by
Chris Bergin
on 18 Nov, 2013 15:03
-
-
#170
by
Chris Bergin
on 18 Nov, 2013 15:04
-
And into video file coverage of rollout and such.
-
#171
by
Artyom.
on 18 Nov, 2013 15:16
-
NASA Launch Manager just polled the team, including NASA Chief Engineer, NASA Mission Manager and Spacecraft for AtlasV cryogenic tanking.
-
#172
by
Artyom.
on 18 Nov, 2013 15:18
-
-
#173
by
Chris Bergin
on 18 Nov, 2013 15:24
-
Sir George of Diller interviewing the launch folks.
-
#174
by
Chris Bergin
on 18 Nov, 2013 15:29
-
Out of the hold. T-1 hr 50 mins.
-
#175
by
Artyom.
on 18 Nov, 2013 15:31
-
NASA_LSP @NASA_LSP
NASA Winds reported the results of the secondary balloon to the NASA Chief Engineer. The NASA Winds engineer is in the Denver ADDJUST Room.
-
#176
by
psloss
on 18 Nov, 2013 15:32
-
Can see the haze associated with the outer fringe of the cloud system in those views from the camera sites around the pad...another shot from the press site.
-
#177
by
Chris Bergin
on 18 Nov, 2013 15:34
-
Centaur LOX tanking has begun.
-
#178
by
Prober
on 18 Nov, 2013 15:45
-
-
#179
by
psloss
on 18 Nov, 2013 15:48
-
kinda cloudly
Building, but thin overcast at this point.