Zenit-3SLB launch with Amos-4 satellite - August 31, 2013 (2005UTC)
by
anik
on 09 May, 2013 05:06
-
http://www.sea-launch.com/missions-q11349-Failure_Review_Oversight_Board.aspx"Appropriate corrective actions have been identified and are currently being developed for implementation. The corrective actions are expected to be complete on the existing flight units in the June/July time frame in order to support a Zenit launch from Baikonur in the August/September time frame and do not involve any design changes to the flight hardware. The corrective actions focus on additional standalone inspections and testing of the BIM prior installation into the Zenit 1st stage engine compartment"
-
#1
by
spectre9
on 09 May, 2013 06:52
-
Excellent news.
No engine redesign needed just better inspection of the BIM

Go Zenit! Go Sea Launch!
Hope to see them back in action soon
-
#2
by
anik
on 31 May, 2013 10:58
-
The launch is planned at 20:00 UTC on August 31st.
-
#3
by
anik
on 27 Jun, 2013 19:47
-
Zenit-2S rocket has departed to Baikonur cosmodrome (second time).
-
#4
by
Artyom.
on 01 Jul, 2013 15:16
-
-
#5
by
Artyom.
on 29 Jul, 2013 04:34
-
-
#6
by
Artyom.
on 22 Aug, 2013 12:35
-
Amos-4 payload unit sent for launch vehicle integrationPreparations for the launch of Zenith-2SB (LV) with the upper stage DM-SLB and Israeli spacecraft Amos-4 continue at Baikonur launch site.
Yesterday, the payload unit was loaded onto a transportation platform, and today it was transported to Area 42 of the launch site where it is to be mated with the launch vehicle Zenit-2SB.
The work is performed according to schedule.
The launch of ILV Zenith-3SLB with the upper stage DM-SLB and Israeli spacecraft Amos-4 is slated for September of this year.
http://www.energia.ru/en/launchers/land-launch/amos-4/photo_08-22.html
-
#7
by
Artyom.
on 22 Aug, 2013 13:55
-
-
#8
by
Artyom.
on 26 Aug, 2013 07:01
-
The Ascent Unit/Zenit-2SB LV Mechanical DockingPreparations for the launch of Zenith-2SB (LV) with the upper stage DM-SLB and Israeli spacecraft Amos-4 continue at Baikonur launch site.
Today at the Assembly & Test Facility of the cosmodrome site 42 the specialists of the rocket-space industry provided general assembly of the Integrated Launch Vehicle: mechanical docking of the Ascent Unit consisting of Upper Stage DM-SLB and Amos-4 spacecraft under the payload fairing with Zenit-2SB LV.
The work is performed according to schedule.
http://www.energia.ru/en/launchers/land-launch/amos-4/photo_08-24.html
-
#9
by
input~2
on 27 Aug, 2013 16:34
-
NOTAMs for fairing drop zone
P4665/13 - RESTRICTED AREA ACT: UNR1237. SFC - UNL, DAILY 2000-2130, 31 AUG 20:00 2013 UNTIL 02 SEP 21:30 2013. CREATED: 27 AUG 12:11 2013
P4652/13 - FLW ATS RTE SEGMENTS CLSD: B928 TELRU - NIGOR, P983 TELRU - NIGOR. SFC - UNL, DAILY 2000-2130, 31 AUG 20:00 2013 UNTIL 02 SEP 21:30 2013. CREATED: 27 AUG 06:05 2013
-
#10
by
Prober
on 27 Aug, 2013 16:49
-
Any roll out video?
-
#11
by
input~2
on 27 Aug, 2013 17:08
-
NOTAMs for 2nd stage drop zone
P4654/13 - ATS RTE SEGMENTS CLSD: A931 IGROD - ODIBA, A932 SIBIR - IGROD, A934 SIBIR - NULAR, B233 MANIT - NULAR, B451 ARLAS - IGROD. SFC - UNL, DAILY 2015-2145, 31 AUG 20:15 2013 UNTIL 02 SEP 21:45 2013. CREATED: 27 AUG 06:43 2013
P4653/13 - TEMPO DANGER AREA FOR ACFT FLT ACT: ELLIPSE WITH PARAMETERS: CENTRE COORD 4230N 13538E, RADII 90/40 KM, MAJOR SEMIAXIS AZM 124 DEG. SFC - UNL, AUG 31 SEP 01 02 2015-2145, 31 AUG 20:15 2013 UNTIL 02 SEP 21:45 2013. CREATED: 27 AUG 06:42 2013
-
#12
by
Artyom.
on 27 Aug, 2013 17:19
-
Any roll out video?
The roll out is planned on August 29

.
-
#13
by
Artyom.
on 28 Aug, 2013 10:38
-
-
#14
by
Artyom.
on 28 Aug, 2013 13:57
-
-
#15
by
Artyom.
on 28 Aug, 2013 14:02
-
-
#16
by
Prober
on 28 Aug, 2013 15:41
-
-
#17
by
Phillip Clark
on 28 Aug, 2013 16:10
-
Is there a launch profile page, as their usually is for Sea Launch and Land Launch commercial Zenit missions, please? If there is I've not managed to find it!
-
#18
by
Prober
on 28 Aug, 2013 18:22
-
-
#19
by
Phillip Clark
on 29 Aug, 2013 05:57
-