-
#80
by
Prober
on 25 May, 2013 00:19
-
-
#81
by
Chris Bergin
on 25 May, 2013 00:19
-
Polling to come out of the hold.
-
#82
by
Nick L.
on 25 May, 2013 00:20
-
-
#83
by
Chris Bergin
on 25 May, 2013 00:20
-
Polling is GO to proceed with terminal count.
-
#84
by
Prober
on 25 May, 2013 00:21
-
-
#85
by
Nick L.
on 25 May, 2013 00:21
-
Pulling swing arm lock pins.
-
#86
by
spectre9
on 25 May, 2013 00:21
-
Go for launch given.
Go Delta IV!
-
#87
by
Prober
on 25 May, 2013 00:22
-
-
#88
by
Nick L.
on 25 May, 2013 00:23
-
T-4 minutes and counting.
Vehicle going to internal power.
-
#89
by
Nick L.
on 25 May, 2013 00:24
-
Vehicle on internal power.
CBC prepress started.
-
#90
by
Chris Bergin
on 25 May, 2013 00:24
-
-
#91
by
Nick L.
on 25 May, 2013 00:24
-
T-3 minutes. Vehicle ordnance armed.
-
#92
by
Nick L.
on 25 May, 2013 00:24
-
-
#93
by
Prober
on 25 May, 2013 00:24
-
-
#94
by
Nick L.
on 25 May, 2013 00:25
-
T-120 seconds. TPA spin up, hydraulics at 4000 psi.
-
#95
by
Nick L.
on 25 May, 2013 00:25
-
CBC tanks ready to go.
-
#96
by
Chris Bergin
on 25 May, 2013 00:26
-
Securing LH2 and LOX.
-
#97
by
Nick L.
on 25 May, 2013 00:26
-
T-60 seconds. Go Delta IV!
-
#98
by
Chris Bergin
on 25 May, 2013 00:26
-
T-60 seconds.
Range GREEN.
-
#99
by
Nick L.
on 25 May, 2013 00:26
-
Range is green. Engine start box go.